UW Home | Wyo Web | About UW | A-Z Directory | Phone/E-mail | Search UW

Reference
  River Basin Plans
  Ground Water Characteristics
  Reference Shelf
  Links

Online Documents
  Water Development Reports
  WWDC Watershed Studies
  Historical Planning Documents
  Instream Flow Reports
  Water Resources Publications
  Water Resources Series
  Research Briefs
  Theses
  UW-WRP Projects

Contact Us

Water Resources Data System

Library Homepage

  


Water Resources Data System Library
Wyoming Water Development Commission Projects and Studies


For access to pdf versions of the following reports, please contact the Wyoming Water Development Office, (307) 777-7626.



Afton
Forsgren Associates, Afton Municipal Water Supply Level II Study, Final Report, Nov, 1990
Forsgren Associates, Afton Municipal Water Supply Level II Study, Executive Summary, Nov, 1990
BRS, Inc., Afton Water Supply Project Level II, Final Report, Nov, 1999
BRS, Inc., Afton Water Supply Project Level II, Executive Summary, Nov, 1999
Sunrise Engineering, Siting, Construction and Testing of the Town of Afton New Municipal East Alley Well, Feb, 2006
Sunrise Engineering, West Afton Nield String Master Plan, Final Report, Jul, 2023
Sunrise Engineering, West Afton Nield String Master Plan, Executive Summary, Jul, 2023

Airport Bench
Engineering Associates, Airport Bench Water Supply Project Phase II, Executive Summary, Nov, 1990
Engineering Associates, Airport Bench Water Supply Project Phase II Report, Nov, 1990

Aladdin
Soda Butte Services, Inc., Aladdin Water Supply Project Level I, Final Report, Oct, 1994
Soda Butte Services, Inc., Aladdin Water Supply Project Level I, Executive Summary, Oct, 1994
Soda Butte Services, Inc., Well Construction, Testing and Conceptual Design for the Aladdin Water Supply Project Level II, Final Report, Oct, 1995
Soda Butte Services, Inc., Well Construction, Testing and Conceptual Design for the Aladdin Water Supply Project Level II, Executive Summary, Oct, 1995

Albany County
Anderson & Kelly, Inc., Hydrogeologic Evaluation of the Casper Aquifer (Drilling Program No. 1) Albany County, Wyoming, Dec, 1982

Albin
Benchmark Engineers, P.C., Town of Albin Well and Water Supply Study Level II, Oct, 2005
Benchmark Engineers, P.C., Town of Albin Water and Well Supply Study Level II, Executive Summary, Oct, 2005

Alliance Lateral Ditch
Centennial Engineering & Research, Inc., Alliance Lateral Ditch Level II Rehabilitation Feasibility Study, Final Report, Oct, 1986
Centennial Engineering & Research, Inc., Alliance Lateral Ditch Level II Rehabilitation Feasibility Study, Executive Summary, Nov, 1986

Alpine
Sunrise Engineering, Alpine Junction Water Level I Study, Executive Summary, Oct, 1995
Sunrise Engineering, Alpine Junction Water Level I Study, Oct, 1995
Rio Verde Engineering, Final Report for the Alpine Spring Irrigation Supply Project, Oct, 2001
Rio Verde Engineering, Executive Summary for the Alpine Spring Irrigation Supply Project, Oct, 2001
Rendezvous Engineering, PC, Alpine Master Plan Update Level II, Final Report, Apr, 2009
Rendezvous Engineering, PC, Alpine Master Plan Update Level II, Executive Summary, Apr, 2009

Alta
Rendezvous Engineering, PC, Final Report for Level I Alta Master Plan, Nov, 2002
Rendezvous Engineering, PC, Executive Summary for Level I Alta Master Plan, Nov, 2002
Rendezvous Engineering, PC, Level II Alta Groundwater Supply Study, Final Report, Feb, 2007
Rendezvous Engineering, PC, Level II Alta Groundwater Supply Study, Executive Summary, Feb, 2007

Arapahoe
James Gores and Associates, P.C., Arapahoe Water Supply Level II Study, Final Report, Oct, 2010
James Gores and Associates, P.C., Arapahoe Water Supply Level II Study, Executive Summary, Oct, 2010

Austin & Wall
Sunrise Engineering, Austin & Wall Canals Level I Study, Final Report, Nov, 2009
Sunrise Engineering, Austin & Wall Canals Level I Study, Executive Summary, Nov, 2009
Sunrise Engineering, Austin & Wall Canals and Reservoir Level II Study, Final Report, Sep, 2011
Sunrise Engineering, Austin & Wall Canals and Reservoir Level II Study, Executive Summary, Sep, 2011
Sunrise Engineering, Austin & Wall Canals and Reservoir Level II Study, Appendices, Sep, 2011
Sunrise Engineering, Austin & Wall Canals Level II Phase II Study, Final Report, Aug, 2013
Sunrise Engineering, Austin & Wall Canals Level II Phase II Study, Executive Summary, Aug, 2013
HDR Engineering, Inc., Austin and Wall Canals Level II Study Wall Reservoir Rehabilitation, Final Report, Jun, 2015
HDR Engineering, Inc., Austin and Wall Canals Level II Study Wall Reservoir Rehabilitation, Executive Summary, Jun, 2015

Badwater
Anderson Consulting Engineers, Inc., Badwater/Poison Creek Watershed Level I Study, Final Report, Feb, 2014
Anderson Consulting Engineers, Inc., Badwater/Poison Creek Watershed Level I Study, Executive Summary, Feb, 2014

Baggs
Weston Groundwater Engineering, Town of Baggs, Wyoming Alluvial Well Project, Final Report, Jan, 2000
Weston Groundwater Engineering, Town of Baggs, Wyoming Alluvial Well Project, Executive Summary, Jan, 2000
AVI, Town of Baggs, Wyoming Water Supply Project Level II, Final Report, Nov, 2000
AVI, Town of Baggs, Wyoming Water Supply Project Level II, Executive Summary, Nov, 2000
AVI Professional Corporation, Town of Baggs, Wyoming Water Master Plan Level I, Final Report, Nov, 2002
AVI Professional Corporation, Town of Baggs, Wyoming Water Master Plan Level I, Executive Summary, Nov, 2002
Donnell & Allred, Inc., Baggs Water & Raw Water Supply Level II Report, Executive Summary, Nov, 2004
Donnell & Allred, Inc., Baggs Water & Raw Water Supply Level II Report, Nov, 2004

Bairoil
Hydro-Search, Inc., Bairoil, Wyoming Groundwater Development Feasibility Exploration Program, Nov, 1983
Lidstone and Associates, Inc., Executive Summary of Final Report, Bairoil Water Supply Project Level II, May, 2000
Lidstone and Associates, Inc., Bairoil Water Supply Project Level II, Final Report, May, 2000
Lidstone and Associates, Inc., Bairoil Water Supply Project Level II, Phase IV, Final Report, Oct, 2001
Lidstone and Associates, Inc., Town of Bairoil Water Supply Project Level II, Phase V Report, May, 2003
Lidstone and Associates, Inc., Executive Summary of Final Report, Bairoil Water Supply Project Level II, Phase V, May, 2003

Basin-Big Horn
Crank Companies, Inc., Final Report for Basin/Big Horn Rehabilitation Project Level II, Nov, 1990
Crank Companies, Inc., Executive Summary for Basin/Big Horn Rehabilitation Project Level II, Nov, 1990

Bear River
Forsgren and Associates, Bear River Basin Plan, Final Report, Jan, 2001 (3,234 kb)
Forsgren and Associates, Bear River Basin Plan, Executive Summary, Jan, 2001 (532 kb)
Forsgren and Associates, Bear River Basin Plan, Appendix, Book 2 of 2, Jan, 2001 ( kb)
Forsgren and Associates, Bear River Basin Plan, Appendix, Book 1 of 2, Jan, 2001 ( kb)
Wyoming Water Development Commission, 2011 Bear River Basin Plan Update, Technical Memorandum, Oct, 2011 ( kb)
Wyoming Water Development Commission, 2011 Bear River Basin Plan Update, Final Report , Jun, 2012 (7,204 kb)
Wyoming State Geological Survey, Bear River Basin Water Plan Update Groundwater Study Level I (2010-2014) Available Groundwater Determination Technical Memorandum No. 6, Mar, 2014 (67,461 kb)
Wyoming State Geological Survey, Bear River Basin Water Plan Update Groundwater Study Level I (2010-2014) Available Groundwater Determination Technical Memorandum No. 6, Plates, Apr, 2014 ( kb)
Wyoming State Geological Survey, Bear River Basin Water Plan Update Groundwater Study Level I (2010-2014) Available Groundwater Determination Technical Memorandum No. 6, Executive Summary, Apr, 2014 (551 kb)
HDR Engineering, Inc., Bear River Watershed Study Level I, Final Report, Feb, 2017
HDR Engineering, Inc., Bear River Watershed Study Level I, Executive Summary, Feb, 2017
HDR Engineering, Inc., Bear River Watershed Study Level I, Appendices, Feb, 2017
Western EcoSystems Technology, Inc., Bear River Basin Plan Update Environmental and Recreational Water Use Analysis for the Bear River Basin, Wyoming, Sep, 2017 (2,863 kb)

Beaver Creek
Bearlodge Ltd, Inc., Beaver Creek Dam and Reservoir Level I, Executive Summary , Oct, 1989
Bearlodge Ltd, Inc., Beaver Creek Dam and Reservoir Level I , Oct, 1989
Bearlodge Ltd, Inc., Beaver Creek Dam and Reservoir Project Level II, Phase I Investigation, Aug, 1990
Bearlodge Ltd, Inc., Beaver Creek Dam and Reservoir Project Level II, Final Report, Aug, 1991
Bearlodge Ltd, Inc., Beaver Creek Dam and Reservoir Project Level II, Executive Summary, Aug, 1991
Olsson Associates, Beaver Creek Watershed Study Level I, Final Report, Nov, 2018
Olsson Associates, Beaver Creek Watershed Study Level I, Executive Summary, Nov, 2018

Bedford
Forsgren-Perkins Engineering, PA, Bedford Water Supply Study Level I, Final Report, Oct, 1986
Forsgren-Perkins Engineering, PA, Bedford Water Supply Study Level I, Executive Summary, Oct, 1986
Forsgren-Perkins Engineering, PA, Bedford Water Supply Study Level II, Final Report, Nov, 1987
Forsgren-Perkins Engineering, PA, Bedford Water Supply Study Level II, Executive Summary, Nov, 1987
Sunrise Engineering, Bedford Water Supply Master Plan Level I, Final Report, Oct, 2019
Sunrise Engineering, Bedford Water Supply Master Plan Level I, Executive Summary, Oct, 2019

Belle Fourche
RESPEC, Belle Fourche River Watershed Study Subbasin Below Keyhole Reservoir Watershed Management Plan, Final Report, Mar, 2015
RESPEC, Belle Fourche River Watershed Study Subbasin Above Keyhole Reservoir Watershed Management Plan, Final Report, Mar, 2015
RESPEC, Belle Fourche River Watershed Study Redwater Subbasin Watershed Management Plan, Final Report, Mar, 2015
RESPEC, Belle Fourche River Watershed Study Basin Wide Watershed Management Plan, Final Report, V. 2, Mar, 2015
RESPEC, Belle Fourche River Watershed Study Basin Wide Watershed Management Plan, Final Report, V. 1, Mar, 2015
RESPEC, Belle Fourche River Watershed Study Basin Wide Watershed Management Plan, Executive Summary, Mar, 2015

Bench Canal
Nelson Engineering, Bench Canal Rehabilitation Project Level II, Nov, 1991
Sage Civil Engineering, Bench Canal Company Master Plan Level I Study, Final Report, Jan, 2016

Beulah
Weston Engineering, Inc., Beulah Level I Water Supply Study, Final Report, Nov, 2003
Weston Engineering, Inc., Beulah Level I Water Supply Study, Executive Summary, Nov, 2003

Big Goose Creek
MSE-HKM, Final Report for the Big Goose Creek Diversion (Sheridan Raw Water Intake Facilities) Level II, Nov, 1999
MSE-HKM, Executive Summary for the Big Goose Creek Diversion (Sheridan Raw Water Intake Facilities) Level II, Nov, 1999

Big Horn Basin
ESA Geotechnical Consultants, Big Horn Basin-Clarks Fork Level II Study, Interim Report on Geotechnical Analysis Phase I, Jan, 1985
ESA Geotechnical Consultants, Big Horn Basin-Clarks Fork Level II Study, Final Report on Project Analysis, May, 1986
ESA Geotechnical Consultants, Big Horn Basin-Clarks Fork Level II Study, Executive Summary, May, 1986
HDR Engineering, Inc., Guidebook for Water Resources Management & Development, Big Horn & Clarks Fork Basins, Final Report , Oct, 1988
Engineering Associates, Big Horn Basin Rural Water Supply, Phase 1 Report, Jan, 1989
Engineering Associates, Big Horn Basin Rural Water Supply Phase II, Final Report, Dec, 1990
Engineering Associates, Big Horn Basin Rural Water Supply Phase II, Executive Summary, Dec, 1990
Engineering Associates, Big Horn Basin Rural Water Supply Project Phase II Final Report, Appendix J, Expanded Systems Analysis, May, 1992
A & H Consulting, Inc., Irrigation Hydropower Study Level II, Executive Summary, May, 2003
A & H Consulting, Inc., Irrigation Hydropower Study Level II, May, 2003
BRS, Inc, Wind/Bighorn River Basin Plan, Technical Memoranda, Oct, 2003 ( kb)
BRS, Inc, Wind/Bighorn River Basin Plan, Final Report, Oct, 2003 (4,237 kb)
BRS, Inc, Wind/Bighorn River Basin Plan, Executive Summary, Oct, 2003 (669 kb)
MWH Americas, Inc., Wind-Bighorn Basin Plan Update, Technical Memoranda, May, 2010 ( kb)
MWH Americas, Inc., Wind-Bighorn Basin Plan Update, Report, May, 2010 (113,300 kb)
MWH Americas, Inc., Wind-Bighorn Basin Plan Update, Executive Summary, May, 2010 (4,987 kb)
Weston Groundwater Engineering, Big Horn Regional Ground Water Level II Study, Final Report, Volume II, May, 2011
Weston Groundwater Engineering, Big Horn Regional Ground Water Level II Study, Final Report, Volume I, May, 2011
Weston Groundwater Engineering, Big Horn Regional Ground Water Level II Study, Executive Summary, May, 2011
Wyoming State Geological Survey, Wind/Bighorn River Basin Water Plan Update Groundwater Study Level I (2008-2011), Available Groundwater Determination Technical Memorandum, May, 2012 ( kb)
DOWL, Big Horn Regional Southern Water Supply Level II Study, Final Report, Aug, 2018
DOWL, Big Horn Regional Southern Water Supply Level II Study, Executive Summary, Aug, 2018
DOWL, Big Horn Regional Transmission Level II Study, Final Report, Nov, 2022
DOWL, Big Horn Regional Transmission Level II Study, Executive Summary, Nov, 2022

Big Horn Canal
Nelson Engineering, Big Horn Canal Feasibility Analysis Level II, Phase II, Final Report, Jun, 1994
Nelson Engineering, Big Horn Canal Feasibility Analysis Level II, Executive Summary, Jun, 1994
Anderson Consulting Engineers, Inc., Final Report for Big Horn Canal Rehabilitation Level II Study, Apr, 2007
Anderson Consulting Engineers, Inc., Executive Summary for Big Horn Canal Rehabilitation Level II Study, Apr, 2007
Nelson Engineering, Basin-Big Horn Canal Rehabilitation Project Level II, Final Report, Dec, 2013
Nelson Engineering, Basin-Big Horn Canal Rehabilitation Project Level II, Executive Summary, Dec, 2013

Big Laramie River
Short Elliott Hendrickson Inc., Big Laramie River Oasis Ditch Diversion Rehabilitation Project Level II Study, Final Report, Aug, 2019
Short Elliott Hendrickson Inc., Big Laramie River Oasis Ditch Diversion Rehabilitation Project Level II Study, Executive Summary, Aug, 2019

Big Piney-Marbleton
Jorgensen Engineering and Land Surveying, Big Piney/Marbleton Level II Water Supply Project Report, Final Report, Nov, 1994
Jorgensen Engineering and Land Surveying, Big Piney/Marbleton Level II Water Supply Project Report, Executive Summary, Nov, 1994
Weston Engineering, Inc., Big Piney Well No. 1R, Final Report, Jul, 2019

Big Sandy Reservoir
Wenck, Big Sandy Reservoir Enlargement Level II Phase I Study, Final Report, Mar, 2017
Wenck, Big Sandy Reservoir Enlargement Level II Phase I Study, Executive Summary, Mar, 2017
US Bureau of Reclamation, Big Sandy Reservoir Enlargement Project, Final Environmental Assessment and Finding of No Significant Impacts, Jun, 2020

Big Sandy River
Rick Blatchley, Class III Archeological Investigations Conducted for the Big Sandy River Unit Desalinization Study Sweetwater County, Wyoming, Draft, Nov, 1982
Greenhorne & O'Mara, Inc., Big Sandy Salinity Control, Design Review and Alternative Investigation, Dec, 1982
State of Wyoming, Big Sandy River Unit, Colorado River Water Quality Improvement Program, Dec, 1982
Fox Consulting Engineers, Lower Big Sandy Reservoir and Dam Geotechnical and Geological Feasibility Investigation, Feb, 1983
Greenhorne & O'Mara, Inc., Big Sandy Salinity Control Reservoir Planning, Final Report, Mar, 1984
Nelson Engineering, Big Sandy Water Supply Project Level II, Final Design Report, Executive Summary, Oct, 1993
Nelson Engineering, Big Sandy Water Supply Project Level II, Final Design Report, Oct, 1993

Big Sandy Watershed
Rio Verde Engineering, Big Sandy Watershed Level I Study, Final Report, Oct, 2019
Rio Verde Engineering, Big Sandy Watershed Level I Study, Executive Summary, Oct, 2019

Big Valley
James Gores and Associates, P.C., Big Valley and Crossed Arrows Improvement District Water Supply Level II Study, Final Report, Feb, 2006
James Gores and Associates, P.C., Big Valley and Crossed Arrows Improvement District Water Supply Level II Study, Executive Summary, Feb, 2006

Bitter Creek
Johnson-Fermelia Company, Inc., Rock Springs, Wyoming Flood Control Project, Bitter Creek Tributaries Level II Feasibility Study, Phase 1A Report, Feb, 1989
Johnson-Fermelia Company, Inc., Bitter Creek Channel Improvement Study, Level II for the City of Rock Springs, Sep, 1991
Johnson-Fermelia Company, Inc., Bitter Creek Channel Improvement Study, Executive Summary, Sep, 1991
Johnson-Fermelia Company, Inc., Supplement to Level II Report Bitter Creek Channel Improvement Study, September, 1991, and Level II, Phase II Report, Bitter Creek Tributary Flood Study, Nov, 1991
Johnson-Fermelia Company, Inc., Bitter Creek Tributary Flood Study, Rock Springs, Wyoming Level II Feasibility Study, Phase II Report Executive Summary, Nov, 1991
Johnson-Fermelia Company, Inc., Bitter Creek Tributary Flood Study, Rock Springs, Wyoming Level II Feasibility Study, Phase II Report, Nov, 1991
Anderson Consulting Engineers, Inc., Bitter Creek/East Flaming Gorge Watershed Study Level I, Final Report, Nov, 2018
Anderson Consulting Engineers, Inc., Bitter Creek/East Flaming Gorge Watershed Study Level I, Executive Summary, Nov, 2018

Black Willow
BRS, Inc., Black Willow Water Supply Project, Thermopolis, Wyoming Level I, Final Report, Nov, 1995
BRS, Inc., Black Willow Water Supply Project, Thermopolis, Wyoming Level I, Executive Summary, Nov, 1995

Blacks Fork
Anderson Consulting Engineers, Inc., Blacks Fork River Watershed Study, Level I, Executive Summary, Jan, 2015
Anderson Consulting Engineers, Inc., Blacks Fork River Watershed Study, Level I Basinwide, Final Report, Jan, 2015
Anderson Consulting Engineers, Inc., Blacks Fork River Watershed Study Level I Phase III, Lower Blacks Fork, Final Report, Jan, 2015
Anderson Consulting Engineers, Inc., Blacks Fork River Watershed Study Level I Phase II, Upper Blacks Fork, Final Report, Jan, 2015
Anderson Consulting Engineers, Inc., Blacks Fork River Watershed Study Level I Phase I, Hams Fork, Final Report, Jan, 2015

Bluff
Western Heritage Consulting & Engineering, Bluff / Upper Bluff Irrigation Districts Master Plan Level I Study, Final Report, Aug, 2020
Western Heritage Consulting & Engineering, Bluff / Upper Bluff Irrigation Districts Master Plan Level I Study, Addendum, Aug, 2020
Western Heritage Consulting & Engineering, Bluff / Upper Bluff Irrigation Districts Master Plan Level I Study, Executive Summary, Aug, 2020

Boulder
Sunrise Engineering, Boulder Irrigation District Rehabilitation Level II Study, Final Report, Sep, 2020
Sunrise Engineering, Boulder Irrigation District Rehabilitation Level II Study, Executive Summary, Sep, 2020

Boulder Flats
HDR Engineering, Inc., Boulder Flats Water Supply Level II Study, Final Report, Nov, 2013
HDR Engineering, Inc., Boulder Flats Water Supply Level II Study, Executive Summary, Nov, 2013

Boulter Lake
Rio Verde Engineering, Report on the Boulter Lake Enlargement Level II Study, May, 2007
Rio Verde Engineering, Executive Summary on the Boulter Lake Enlargement Level II Study, May, 2007

Bridger Valley
Forsgren Associates, Bridger Valley Water Supply Study Level I, Executive Summary, Nov, 1991
Forsgren Associates, Bridger Valley Water Supply Study Level I, Nov, 1991
Forsgren Associates, Bridger Valley Water Treatment Plant Analysis, Addition of Pioneer Water and Sewer District, Dec, 1993
Forsgren Associates, Bridger Valley Water Supply Level II Study Executive Summary, Aug, 1995
Forsgren Associates, Bridger Valley Water Supply Level II Study, Aug, 1995
ECI, Bridger Valley Reservoir Level II Study Executive Summary, Jul, 2004
ECI, Bridger Valley Reservoir Level II Study, Jul, 2004
Gannett Fleming, Bridger Valley Reservoir Level II Phase II Study Final Report, Nov, 2006
Gannett Fleming, Bridger Valley Reservoir Level II Phase II Study Executive Summary, Nov, 2006
Short Elliott Hendrickson Inc., Bridger Valley Reservoir Project Level II Study, Final Report, Sep, 2008
Short Elliott Hendrickson Inc., Bridger Valley Reservoir Project Level II Study, Executive Summary, Sep, 2008
Sunrise Engineering, Bridger Valley Regional Water Mater Plan Level I Study, Final Report, Jul, 2021
Sunrise Engineering, Bridger Valley Regional Water Mater Plan Level I Study, Executive Summary, Jul, 2021

Broken Wheel Ranch
Sunrise Engineering, Broken Wheel Ranch Master Plan 2016 Level I Study, Final Report, Aug, 2016
Sunrise Engineering, Broken Wheel Ranch Master Plan 2016 Level I Study, Executive Summary, Aug, 2016

Buffalo
Western Water Consultants, Municipal Water Supply Study for the City of Buffalo, Wyoming Level I Reconnaissance Study, Jan, 1982
Plains Engineering, Buffalo Hydrogeologic Reconnaissance, Jan, 1982
Tipton and Kalmbach, Inc., Level I Reconnaissance Study of Supplemental Municipal Water Supply for the City of Buffalo, Wyoming, Summary Report, Nov, 1984
Tipton and Kalmbach, Inc., Level I Reconnaissance Study of Supplemental Municipal Water Supply for the City of Buffalo, Wyoming, Part I Report, Nov, 1984
Tipton and Kalmbach, Inc., Level I Reconnaissance Study of Supplemental Municipal Water Supply for the City of Buffalo, Wyoming, Appendices, Nov, 1984
Wyoming Water Development Commission, City of Buffalo Water Supply Alternatives Summary Report, Dec, 1987
States West Water Resources Corporation, Clear Creek Basin Irrigated Acreage Summary by Quadrangle, Final Report, Mar, 1988
States West Water Resources Corporation, Buffalo Municipal Reservoir Project, Interim Report, Oct, 1988
States West Water Resources Corporation, Buffalo Municipal Reservoir Project Level II, Phase 1 Evaluation Executive Summary, Mar, 1989
States West Water Resources Corporation, Buffalo Municipal Reservoir Project Level II, Phase 1 Evaluation, Mar, 1989
States West Water Resources Corporation, Buffalo Municipal Reservoir Project Level II, Phase 1 Appendices, Mar, 1989
Frontier Archaeology, Class II Cultural Resource Inventory of States West Water Resources Corporation, Buffalo Municipal Reservoir Project, Johnson County, Wyoming, Sep, 1990
States West Water Resources Corporation, Buffalo Municipal Reservoir Project Level II, Phase III Evaluation, Executive Summary, Mar, 1991
States West Water Resources Corporation, Buffalo Municipal Reservoir Project Level II, Phase III Evaluation, Mar, 1991
States West Water Resources Corporation, Town of Buffalo Water Storage Tank Level II Project, Executive Summary, Oct, 2002
States West Water Resources Corporation, Town of Buffalo Water Storage Tank Level II Project, Oct, 2002
States West Water Resources Corporation, Town of Buffalo Water Storage Tank Level II Project, Environmental Report, Jan, 2003
HKM Engineering, City of Buffalo-Sheridan Area Water System-Lake DeSmet Level I Study, Final Report, Jun, 2008
HKM Engineering, City of Buffalo-Sheridan Area Water System-Lake DeSmet Level I Study, Executive Summary, Jun, 2008
HKM Engineering, City of Buffalo-Sheridan Area Water System-Lake DeSmet Level I Study, Appendices-Vol. 2, Jun, 2008
HKM Engineering, City of Buffalo-Sheridan Area Water System-Lake DeSmet Level I Study, Appendices-Vol. 1, Jun, 2008
WWC Engineering, Buffalo Northwest Water Supply Level I Study, Final Report, Oct, 2011
WWC Engineering, Buffalo Northwest Water Supply Level I Study, Executive Summary, Oct, 2011
WWC Engineering, Buffalo Master Plan Level I Study, Final Report, Jul, 2015
WWC Engineering, Buffalo Master Plan Level I Study, Executive Summary, Jul, 2015
RESPEC, Buffalo Municipal Watershed Wildfire Hazard Mitigation Assessment, Jan, 2017
Wyoming Groundwater, LLC, Buffalo Groundwater Supply Level II Study, Final Report, Sep, 2018
Wyoming Groundwater, LLC, Buffalo Groundwater Supply Level II Study, Executive Summary, Sep, 2018

Buffalo Creek
Anderson Consulting Engineers, Inc., Buffalo Creek Watershed Study Level I, Final Report, Mar, 2012
Anderson Consulting Engineers, Inc., Buffalo Creek Watershed Study Level I, Executive Summary, Mar, 2012

Buffalo Valley
Jorgensen Engineering and Land Surveying, Buffalo Valley Level I Water Supply Project Report, Teton County, Wyoming, Final Report, Nov, 1996
Jorgensen Engineering and Land Surveying, Buffalo Valley Level I Water Supply Project Report, Teton County, Wyoming, Executive Summary, Nov, 1996
Hinckley Consulting, Buffalo Valley Water Supply Project Level II Teton County, Wyoming, Final Report, Dec, 1997
Hinckley Consulting, Buffalo Valley Water Supply Project Level II Teton County, Wyoming, Executive Summary, Dec, 1997

Burlington
MSE-HKM, Burlington Water Supply Project Level II, Technical Report, Dec, 1996
MSE-HKM, Burlington Water Supply Project Level II, Executive Summary, Dec, 1996
TST, Inc., Burlington Regional Water Master Plan Level II Study, Executive Summary, Jan, 2007
TST, Inc., Burlington Regional Water Master Plan Level II Study, Jan, 2007

Burns
Lidstone and Associates, Inc., Town of Burns Master Plan Level I Report, Executive Summary, Jan, 2011
Lidstone and Associates, Inc., Town of Burns Master Plan Level I Report, Jan, 2011
Lidstone and Associates, Inc., Burns Well Level II Study, Final Report, May, 2013
Lidstone and Associates, Inc., Burns Well Level II Study, Executive Summary, May, 2013

Byron
Western Water Consultants, Town of Byron Ground Water Development Feasibility Study, Sep, 1982
Western Water Consultants, Exploratory Ground Water Investigation of the Shoshone River Alluvium Near Byron, Wyoming, Apr, 1983
Engineering Associates, Town of Byron Raw Water Supply Project Level II Study, Final Report, Nov, 2002
Engineering Associates, Town of Byron Raw Water Supply Project Level II Study, Executive Summary, Nov, 2002
TREC, Town of Byron Level I Master Plan Study, Final Report, Sep, 2016
TREC, Town of Byron Level I Master Plan Study, Executive Summary, Sep, 2016
Dowl, Byron Rural Water Supply Level II Study, Final Report, Oct, 2022
Dowl, Byron Rural Water Supply Level II Study, Executive Summary, Oct, 2022

Cambria-Sweetwater
Camp Creek Engineering, Inc., Cambria/Sweetwater Water Supply Level II Feasibility Study, Final Report, Sep, 2012
Camp Creek Engineering, Inc., Cambria/Sweetwater Water Supply Level II Feasibility Study, Executive Summary, Sep, 2012

Campbell County
Raymond P. Murphy, Campbell County Coal Bed Methane Monitor Well Program, Mar, 2000

Carpenter
AVI Professional Corporation, Town of Carpenter Water Supply Project, Final Report, Nov, 1996
AVI Professional Corporation, Town of Carpenter Water Supply Project, Executive Summary, Nov, 1996

Casper
Wright Water Engineers, Inc., Feasibility of Obtaining Groundwater from Sediments on Casper Mountain and Vicinity, Nov, 1982
Morrison-Maierle, Inc., Casper Aquifer Drilling Program No. 2 With Results of Aquifer Tests, Final Report, Jun, 1984
Wyoming Water Development Commission, Casper Aquifer Exploration Program Summary Report, May, 1986
Wyoming Water Development Commission, Casper Raw Water Project (Prepared for Casper Parks Department), Nov, 1987
Worthington, Lenhart, Carpenter and Johnson, Casper Raw Water Supply System Level II Conceptual Design Report, Executive Summary, Oct, 1988
Worthington, Lenhart, Carpenter and Johnson, Casper Raw Water Supply System Level II Conceptual Design Report, Oct, 1988
Civil Engineering Professionals, Inc., Casper Zone 2 Supply Level II Study, Executive Study, Oct, 2001
Civil Engineering Professionals, Inc., Casper Zone 2 Supply Level II Study, Oct, 2001
Anderson Consulting Engineers, Inc., Casper-Alcova Irrigation District Rehabilitation Needs Analysis, Final Report, Apr, 2002
Anderson Consulting Engineers, Inc., Final Report for Casper Alcova Irrigation District Computerized Irrigation Scheduling, May, 2003
Anderson Consulting Engineers, Inc., Executive Summary for Casper Alcova Irrigation District Computerized Irrigation Scheduling, May, 2003
Anderson Consulting Engineers, Inc., Final Report for Casper Alcova Irrigation District Rehabilitation Needs Analysis, Oct, 2003
Anderson Consulting Engineers, Inc., Executive Summary for Casper Alcova Irrigation District Rehabilitation Needs Analysis, Oct, 2003
Civil Engineering Professionals, Inc., Casper Master Plan Level I Study, Executive Summary, Oct, 2006
Civil Engineering Professionals, Inc., Casper Master Plan Level I Study, Oct, 2006
Anderson Consulting Engineers, Inc., Final Report for Casper Alcova Irrigation District GIS Project Level II, Jan, 2008
Anderson Consulting Engineers, Inc., Executive Summary for Casper Alcova Irrigation District GIS Project Level II, Jan, 2008

Casper-Lakeview
JFC Engineers/Surveyors, Final Report for Lakeview Water Supply Project Level II, Nov, 1998
JFC Engineers/Surveyors, Executive Summary for Lakeview Water Supply Project Level II, Nov, 1998
JFC Engineers/Surveyors, Addendum to: Final Report for Lakeview Water Supply Project Level II, Dec, 1998

Centennial
James M. Montgomery, Consulting Engineers, Centennial Water Supply Project Report, Jan, 1989
James M. Montgomery, Consulting Engineers, Executive Summary for the Centennial Water Supply Project Level II, Sep, 1989
James M. Montgomery, Consulting Engineers, Conceptual Design and Cost Estimates for the Centennial Water Supply Project Level II, Sep, 1989
James M. Montgomery, Consulting Engineers, Centennial Water Supply Project Report, 1990 Centennial Wells Nos 1 and 2 Aquifer Testing, Feb, 1992
Camp Creek Engineering, Inc., Centennial Well and Master Plan Level I Study, Final Report, Feb, 2017
Camp Creek Engineering, Inc., Centennial Well and Master Plan Level I Study, Executive Summary, Feb, 2017

Chamberlain Reservoir
Western Water Consultants, Chamberlain Reservoir Rehabilitation Project Level II, Phase I Report, Mar, 1990
Western Water Consultants, Chamberlain Reservoir Rehabilitation Project Level II, Phase II Report, Executive Summary, Jun, 1990
Western Water Consultants, Chamberlain Reservoir Rehabilitation Project Level II, Phase II Report, Jun, 1990

Cheyenne
Water Resources Research Institute, Cheyenne Water Project Feasibility Study, Nov, 1979
ESA Geotechnical Consultants, Cheyenne North Crow Rehabilitation Project Level II, Phase I Report, Jan, 1989
ESA Geotechnical Consultants, Cheyenne North Crow Rehabilitation Project Level II, Phase II, Executive Summary, Nov, 1989
ESA Geotechnical Consultants, Cheyenne North Crow Rehabilitation Project Level II, Phase II Report, Nov, 1989
Civil Engineering Professionals, Inc., Cheyenne Stage I Pipeline Rehabilitation Level II Feasibility Study, Final Report, Mar, 1993
Civil Engineering Professionals, Inc., Cheyenne Stage I Pipeline Rehabilitation Level II Feasibility Study, Executive Summary, Apr, 1993
States West Water Resources Corporation, North Cheyenne Master Plan Level I Project, Final Report, Jul, 1993
States West Water Resources Corporation, North Cheyenne Master Plan Level I Project, Executive Summary, Jul, 1993
States West Water Resources Corporation, North Cheyenne Master Plan Level I Project, Appendices, Jul, 1993
Black & Veatch, Cheyenne Water Supply Master Plan Level I, Volume I, Executive Summary, Jul, 1994
Black & Veatch, Cheyenne Water Supply Master Plan Level I, Volume 3, Chapter 7 through Chapter 14, Jul, 1994
Black & Veatch, Cheyenne Water Supply Master Plan Level I, Volume 2, Chapter 2 through Chapter 6, Jul, 1994
States West Water Resources Corporation, Volume 5, Executive Summary, Cheyenne Water Supply Level II Project, Nov, 1996
States West Water Resources Corporation, Volume 4, SCADA Report by KNS Communication Consultants, Cheyenne Water Supply Level II Project, Nov, 1996
States West Water Resources Corporation, Volume 3, Appendix 8.1 Pipeline Corrosion Investigation Cheyenne Water Supply Level II Project, Nov, 1996
States West Water Resources Corporation, Volume 2, Appendices to Accompany Cheyenne Water Supply Level II Project, Nov, 1996
States West Water Resources Corporation, Volume 1, Final Report, Cheyenne Water Supply Level II Project, Nov, 1996
CH2M Hill, Cheyenne Aquifer Storage Recovery Test Project, Jun, 1998
ECI, Cheyenne South Crow Diversion Project Phase II, Final Report, Executive Summary, Aug, 2000
ECI, Cheyenne South Crow Diversion Project Phase II, Final Report, Aug, 2000
ECI, Cheyenne Hydropower Feasibility Study Level II, Final Report, Oct, 2003
ECI, Cheyenne Hydropower Feasibility Study Level II, Executive Summary, Oct, 2003
JR Engineering, Cheyenne Belvoir Ranch Level II Study, Final Report, Dec, 2005
JR Engineering, Cheyenne Belvoir Ranch Level II Study, Executive Summary, Dec, 2005
JR Engineering, Cheyenne Belvoir Ranch Level II Study Appendix D, Dec, 2005
JR Engineering, Cheyenne Belvoir Ranch Level II Study, Phase III-V, Final Report, Sep, 2007
JR Engineering, Cheyenne Belvoir Ranch Level II Study, Phase III-V, Executive Summary, Sep, 2007
JR Engineering, Belvoir Wells No. 5 & 6 Pumping Test Report, Aquifer Impact Report, Oct, 2007
AVI Professional Corporation, Cheyenne/Laramie County Water Service Area Level II Study, Volume II, East Cheyenne Water Master Plan, Apr, 2008
AVI Professional Corporation, Cheyenne/Laramie County Water Service Area Level II Study, Volume I, Archer Special Use District Water Master Plan, Apr, 2008
AVI Professional Corporation, Cheyenne/Laramie County Water Service Area Level II Study, Executive Summary, Apr, 2008
TriHydro Corporation, Belvoir Ranch High Plains Aquifer-White River Study, Project Report, Jan, 2009
Lidstone & Associates, Inc, Cheyenne Belvoir Ranch Groundwater Level II, Final Report, Jun, 2012
Lidstone & Associates, Inc, Cheyenne Belvoir Ranch Groundwater Level II, Executive Summary, Jun, 2012
RESPEC, Cheyenne Municipal Watershed Wildfire Hazard Mitigation Assessment, Executive Summary, May, 2017
RESPEC, Cheyenne Municipal Watershed Wildfire Hazard Mitigation Assessment, May, 2017
TriHydro Corporation, Cheyenne Municipal Storage, Level II, Phase I Study, Final Report, Mar, 2021
TriHydro Corporation, Cheyenne Municipal Storage, Level II, Phase I Study, Executive Summary, Mar, 2021
Lytle Water Solutions, LLC, Managed Aquifer Recharge, Storage and Recovery Project, Final Report, Jan, 2011

Chugwater
States West Water Resources Corporation, Town of Chugwater Water Supply Master Plan Level I Project, Dec, 1996
States West Water Resources Corporation, Town of Chugwater Water Supply Study Level II Project, Final Report, Aug, 1998
States West Water Resources Corporation, Town of Chugwater Water Supply Study Level II Project, Executive Summary, Aug, 1998

Church Reservoir
States West Water Resources Corporation, Final Report for the Green River ASR and Alternate Storage Project, Church Reservoir Investigation, Dec, 2002
States West Water Resources Corporation, Executive Summary for the Green River ASR and Alternate Storage Project, Church Reservoir Investigation, Dec, 2002

Clarks Fork
Wyoming Water Development Commission, Pre-Level I Analysis of Water Development Potential, Clarks Fork River, Jan, 1983
TriHydro Corporation, Final Report Clarks Fork/Upper Shoshone Watershed Level I Study, Mar, 2024
TriHydro Corporation, Executive Summary Clarks Fork/Upper Shoshone Watershed Level I Study, Mar, 2024

Clear Creek
States West Water Resources Corporation, Clear Creek Watershed Level I Study, Final Report, Mar, 2011
States West Water Resources Corporation, Clear Creek Watershed Level I Study, Executive Summary, Mar, 2011
States West Water Resources Corporation, Clear Creek Watershed Level I Study, Appendices, Mar, 2011

Clearmont
Weston Engineering, Inc., Final Report for the Clearmont CBM Impact Level I Study, Nov, 2008
Weston Engineering, Inc., Executive Summary for the Clearmont CBM Impact Level I Study, Nov, 2008
Weston Engineering, Inc., Clearmont Test Well Level II Study, Final Report, Jun, 2018
Weston Engineering, Inc., Clearmont Test Well Level II Study, Executive Summary, Jun, 2018

Clearview
Johnson-Fermelia Company, Inc., Domestic Water System Evaluation for Clearview Improvement and Services District, Final Report, Sep, 1989

Cody
Engineering Associates, Cody Area Level II Water Supply Project, Final Report, May, 1996
Engineering Associates, Cody Area Level II Water Supply Project, Executive Summary, May, 1996
Engineering Associates, City of Cody Raw Water System Analysis and Proposed Expansion Evaluation, Final Report, May, 1996
Aqua Engineering, Inc., Cody Canal Irrigation District Rehabilitation and Hydropower Level II Study, Final Report, May, 2006
Aqua Engineering, Inc., Cody Canal Irrigation District Rehabilitation and Hydropower Level II Study, Executive Summary, May, 2006
Aqua Engineering, Inc., Cody Canal Irrigation District Rehabilitation and Hydropower Level II Study, Appendices, May, 2006
Engineering Associates, Cody Canal Irrigation District Purvis Drop Hydropower Level II, Phase II Study, Executive Summary, Jul, 2008
Engineering Associates, Cody Canal Irrigation District Purvis Drop Hydropower Level II, Phase II Study, Jul, 2008
Engineering Associates, Cody Master Plan Level I Study, Final Report, Sep, 2009
Engineering Associates, Cody Master Plan Level I Study, Executive Summary, Sep, 2009
Engineering Associates, Cody Canal Irrigation District Rehabilitation and GIS Level II Study, Final Report, Nov, 2009
Engineering Associates, Cody Canal Irrigation District Rehabilitation and GIS Level II Study, Executive Summary, Nov, 2009
Sage Civil Engineering, Cody Canal Laterals Level II Study, Final Report, Oct, 2018
Sage Civil Engineering, Cody Canal Laterals Level II Study, Executive Summary, Oct, 2018
Engineering Associates, Volume 1 - Treated Water, City of Cody Master Plan, Level 1 Study, Oct, 2021
Engineering Associates, Volume 2 - Raw Water, City of Cody Master Plan, Level 1 Study, Oct, 2021
Engineering Associates, City of Cody Master Plan, Level 1 Study, Executive Summary, Oct, 2021

Cody-Lakeview
J.M. Montgomery, Consulting Engineers, A Report on Lakeview Irrigation District Consumptive Use and Irrigation Demand at Cody, Wyoming, Apr, 1985
J.M. Montgomery, Consulting Engineers, A Report on Lakeview Irrigation District Value of Production with a Normal and Inadequate Water Supply at Cody, Wyoming, Jun, 1985
J.M. Montgomery, Consulting Engineers, Cody-Lakeview Irrigation Exchange Project Level II Investigation Report, Jan, 1986
Sage Civil Engineering, Lakeview Irrigation Master Plan Level II Study, Final Report , Nov, 2013

Cokeville
Johnson-Fermelia Company, Inc., Phase 1 Report, Cokeville Water Supply Study Project Level I, Executive Summary, Nov, 1991
Johnson-Fermelia Company, Inc., Phase 1 Report, Cokeville Water Supply Study Project Level I, Nov, 1991
Forsgren Associates, Cokeville Water Supply Level II Study, Supplemental Reports, Nov, 1993
Forsgren Associates, Cokeville Water Supply Level II Study, Final Report, Nov, 1993
Forsgren Associates, Cokeville Water Supply Level II Study, Executive Summary, Nov, 1993
Lidstone & Anderson, Inc, Cokeville Tri-Diversion Structures, Level II Project, Final Report, Nov, 1995
Lidstone & Anderson, Inc, Cokeville Tri-Diversion Structures, Level II Project, Executive Summary, Nov, 1995
Sunrise Engineering, Executive Summary for Cokeville Reservoir Level I Study, Aug, 2004
Sunrise Engineering, Cokeville Reservoir Level I Study, Final Report, Aug, 2004
Anderson Consulting Engineers, Inc., Cokeville Tri-Diversion Structures Level II, Final Report, Sep, 2015
Anderson Consulting Engineers, Inc., Cokeville Tri-Diversion Structures Level II, Executive Summary, Sep, 2015
Forsgren Associates, Inc., Report for Construction and Testing of Cokeville Well No.1, Feb, 2023

Cook Road
HKM Associates, Final Report for a Proposed Water Supply System for Cook Road Water District, Campbell County, Wyoming, Oct, 1992
Soda Butte Services, Inc., Construction and Testing of CRWD-1 Well and Conceptual Design and Cost Estimation for Cook Road Water Supply Project Level II, Final Report, Jan, 1994
Soda Butte Services, Inc., Construction and Testing of CRWD-1 Well and Conceptual Design and Cost Estimation for Cook Road Water Supply Project Level II, Executive Summary, Jan, 1994

Corbett Dam
Harza, Corbett Dam and Tunnel Rehabilitation Study, Final Report to Shoshone and Deaver Irrigation District and Wyoming Water Development Commission, Sep, 1983

Corn Creek
CH2M Hill, Progress Report for the Corn Creek Irrigation Project, Jan, 1983
CH2M Hill, Interim Report for the Corn Creek Irrigation Project, May, 1983
CH2M Hill, Final Environmental Assessment, Corn Creek Irrigation Project, Nov, 1985

Corner Mountain
Coffey & Associates, Corner Mountain Water Supply Project, Water Supply Alternatives, Level I, Final Report, Nov, 1995
Coffey & Associates, Corner Mountain Water Supply Project, Water Supply Alternatives, Level I, Executive Summary, Nov, 1995
Coffey & Associates, Corner Mountain Water Supply Project Level II, Final Report, Sep, 1999
Coffey & Associates, Corner Mountain Water Supply Project Level II, Executive Summary, Sep, 1999
Coffey & Associates, Corner Mountain Water Supply Project Level II, Phase III, Jun, 2001

Cottonwood
Sunrise Engineering, Cottonwood Irrigation District Master Plan, Final Report, May, 2017
Sunrise Engineering, Cottonwood Irrigation District Master Plan, Executive Summary, May, 2017

Cottonwood Lake
Sunrise Engineering, Cottonwood Lake Enlargement Level II Study, Executive Summary, Oct, 2006
Sunrise Engineering, Cottonwood Lake Enlargement Level II Study, Oct, 2006
Sunrise Engineering, Cottonwood Lake Enlargement Project 2009 Level II Study, Executive Summary, Oct, 2009
Sunrise Engineering, Cottonwood Lake Enlargement Project 2009 Level II Study , Oct, 2009
Sunrise Engineering, Cottonwood Lake Level II Phase II, Final Report, Sep, 2013
Sunrise Engineering, Cottonwood Lake Level II Phase II, Executive Summary, Sep, 2013

Cottonwood-Grass Creek Watershed
Short Elliott Hendrickson Inc., Cottonwood/Grass Creek Watershed Management Plan Level I Study, Final Report, Oct, 2007
Short Elliott Hendrickson Inc., Cottonwood/Grass Creek Watershed Management Plan Level I Study, Executive Summary, Oct, 2007
States West Water Resources Corporation, Cottonwood/Grass Creek Storage Project Level II Study, Final Report, Sep, 2010
States West Water Resources Corporation, Cottonwood/Grass Creek Storage Project Level II Study, Executive Summary, Sep, 2010
States West Water Resources Corporation, Cottonwood/Grass Creek Storage Project Level II Study, Appendices, Sep, 2010
Wenck Associates, Cottonwood/Grass Creek Storage Level II, Phase II Study, Final Report, Mar, 2017
Wenck Associates, Cottonwood/Grass Creek Storage Level II, Phase II Study, Executive Summary, Mar, 2017

Cowley
Western Water Consultants, Town of Cowley Ground Water Development Feasibility Study, Sep, 1982
Western Water Consultants, Final Report on Drilling and Testing Madison #1 Well for the Town of Cowley, Big Horn County, Wyoming, Oct, 1983
Western Water Consultants, Summary Report on Drilling and Testing of BCL Madison Test Hole #1 Near Cowley, Wyoming, Feb, 1984
Morrison-Maierle, Inc., Town of Cowley Water Master Plan Study, Final Report, Sep, 2016
Morrison-Maierle, Inc., Town of Cowley Water Master Plan Study, Executive Summary, Sep, 2016
Pryor Mountain Engineering, South End Water Users ISD Transmission Feasibility Study, Level II, Final Report, Feb, 2022
Pryor Mountain Engineering, South End Water Users ISD Transmission Feasibility Study, Level II, Executive Summary, Feb, 2022

Crazy Woman Watershed
HKM Associates, Crazy Woman Watershed Project Level II, Phase I, Rehabilitation Plan and Phase II Conceptual Design and Cost Estimates, Final Report, Nov, 1991
HKM Associates, Crazy Woman Watershed Project Level II, Phase I, Rehabilitation Plan and Phase II Conceptual Design and Cost Estimates, Executive Summary, Nov, 1991

Crestview-Antelope Valley
Wester-Wetstein & Associates, Crestview/Antelope Valley Water Supply Project Level II, Final Report, Oct, 1999
Wester-Wetstein & Associates, Crestview/Antelope Valley Water Supply Project Level II, Executive Summary, Nov, 1999

Crook County
ESA Geotechnical Consultants, Crook County Reservoir Project Level I, Final Report, Jul, 1999
ESA Geotechnical Consultants, Crook County Reservoir Project Level I, Executive Summary, Jul, 1999
Short Elliott Hendrickson Inc., Crook County Reservoirs and Water Management Study Level I, Final Report, Feb, 2006
Short Elliott Hendrickson Inc., Crook County Reservoirs and Water Management Study Level I, Executive Summary, Feb, 2006
DOWL, Crook County Rural Water Supply Plan, Level I Study, Final Report, Dec, 2020
DOWL, Crook County Rural Water Supply Plan, Level I Study, Executive Summary, Dec, 2020

Crow Creek
Wyoming Water Development Commission, Surface Water Hydrology of the Crow Creek Drainage Basin Laramie and Albany Counties, Wyoming, Jul, 1986
States West Water Resources Corporation, Crow Creek Flood Control Project, Level II Evaluation, Nov, 1989
States West Water Resources Corporation, Crow Creek Groundwater Recharge Project, Level II Evaluation, Mar, 1990
States West Water Resources Corporation, Crow Creek Flood Control and Groundwater Recharge Project, Executive Summary, Mar, 1990
States West Water Resources Corporation, Crow Creek Flood Control and Groundwater Recharge Project Level II, Phase IA Evaluation, Mar, 1990

Crowheart Area-Dinwoody
Nelson Engineering, Crowheart Area/Dinwoody Canal System Level I Study, Final Report, Sep, 2005
Nelson Engineering, Crowheart Area/Dinwoody Canal System Level I Study, Executive Summary, Sep, 2005
Nelson Engineering, Crowheart Area-Dinwoody Canal System Level II Study, Final Report, Dec, 2007
Nelson Engineering, Crowheart Area-Dinwoody Canal System Level II Study, Executive Summary, Dec, 2007

Crystal Lake and Granite Springs
Woodward-Clyde Consultants, Engineering and Environmental Evaluation, Crystal Lake and Granite Springs Dams, Laramie County, Wyoming, Dec, 1983

Dayton
EnTech, Inc, Dayton Master Plan Level I Study, Final Report, Nov, 2000
EnTech, Inc, Dayton Master Plan Level I Study, Executive Summary, Nov, 2000
EnTech, Inc, Final Report for Dayton Water Supply Project Level II Study, Nov, 2001
EnTech, Inc, Executive Summary for Dayton Water Supply Project Level II Study, Nov, 2001
EnTech, Inc, Final Report for Dayton Water Supply Project Level II Study, Appendix, May, 2002
EnTech, Inc, Final Report for Dayton Groundwater Exploration Project, Apr, 2003
EnTech, Inc, Executive Summary for Dayton Groundwater Exploration Project, Apr, 2003
EnTech, Inc, Final Report for Dayton Groundwater Exploration Project Acid Enhancement Program Level II Study Supplement, Jan, 2004
Engineering Inc., Final Report for Dayton Raw Water Supply Level II Study, May, 2008
Engineering Inc., Executive Summary for Dayton Raw Water Supply Level II Study, May, 2008
Engineering Associates, Dayton Master Plan, Level I Study, Final Report, Sep, 2023
Engineering Associates, Dayton Master Plan, Level I Study, Executive Summary, Sep, 2023

Deaver
Engineering Associates, Deaver Irrigation Rehabilitation Project Level II Study, Final Report, Nov, 2002
Engineering Associates, Deaver Irrigation Rehabilitation Project Level II Study, Executive Summary, Nov, 2002
TREC, Inc., Town of Deaver Level I Master Plan Study, Aug, 2015
TREC, Inc., Town of Deaver Water Master Plan Level I Study, Environmental Report to Accompany, Sep, 2015
Sage Civil Engineering, Deaver Irrigation District Master Plan Update, Level I Study, Final Report, Oct, 2016
Sage Civil Engineering, Deaver Irrigation District Master Plan Update, Level I Study, Executive Summary, Oct, 2016

Deer Creek
RW Beck and Associates, Deer Creek Project Interim Report, Dec, 1982
RW Beck and Associates, Deer Creek Project Feasibility Report, Volume 2 Appendices, Jan, 1984
RW Beck and Associates, Deer Creek Project Feasibility Report, Volume 1, Feb, 1984
Wyoming Recreation Commission, Recreation Benefits and Costs of the Proposed Deer Creek Reservoir, Summary, Apr, 1984
Wyoming Recreation Commission, Recreation Benefits and Costs of the Proposed Deer Creek Reservoir, Apr, 1984
Banner Associates, Inc, Deer Creek Level III, Executive Summary, Nov, 1984
Banner Associates, Inc, Deer Creek Level III Interim and Design Concept Report, Nov, 1984
Banner Associates, Inc, Deer Creek Level III Appendix 2: Geological and Geotechnical Reports, Nov, 1984
Banner Associates, Inc, Deer Creek Level III Appendix 1: Hydrology Data and Computer Printouts; Volume 2 of 2, Nov, 1984
Banner Associates, Inc, Deer Creek Level III Appendix 1: Hydrology Data and Computer Printouts; Volume 1 of 2, Nov, 1984
Banner Associates, Inc, Deer Creek Level III: Appendix 3 for Economic Benefit and Cost Allocation Analysis for Deer Creek Project, Dec, 1984
Banner Associates, Inc, Deer Creek Dam Project, Appendix A: Technical Data-Subsurface Investigations, May, 1986
Banner Associates, Inc, Contract Documents and Specifications for Deer Creek Dam, May, 1986

Dixon
Lidstone & Anderson, Inc, Town of Dixon Water Supply Project Level I, Final Report, Executive Summary, Nov, 1991
Lidstone & Anderson, Inc, Dixon Water Supply Project Level I Study, Final Report, Nov, 1991
Lidstone & Anderson, Inc, Final Report for Dixon Water Supply Project Level II, Jan, 1994
Lidstone & Anderson, Inc, Executive Summary for Dixon Water Supply Project Level II, Jan, 1994
Camp Creek Engineering, Inc., Dixon Water Supply II Level II Study, Executive Summary, May, 2008
Camp Creek Engineering, Inc., Dixon Water Supply II Level II Study, May, 2008

Douglas
Sear-Brown Group, City of Douglas Water System Master Plan Level I, Jul, 1998
Civil Engineering Professionals, Inc., Final Report, Douglas Water Supply Rehabilitation Project Level II Study, Oct, 1999
Civil Engineering Professionals, Inc., Executive Summary, Douglas Water Supply Rehabilitation Project Level II Study, Oct, 1999
Weston Engineering, Inc., Douglas Ground Water Level II Study, Final Report, Jul, 2008
Weston Engineering, Inc., Douglas Ground Water Level II Study, Executive Summary, Sep, 2008
DOWL HKM, Douglas Master Plan Level I Study, Final Report, Sep, 2010
DOWL HKM, Douglas Master Plan Level I Study, Executive Summary, Sep, 2010

Dowlin Diversion
WWC Engineering, Dowlin Diversion Rehabilitation Level II Study, Final Report, Aug, 2023
WWC Engineering, Dowlin Diversion Rehabilitation Level II Study, Executive Summary, Aug, 2023

Downer
HKM Engineering, Downer Neighborhood Water Supply Level II, Final Report, Nov, 1998
HKM Engineering, Downer Neighborhood Water Supply Level II, Executive Summary, Nov, 1998

Dry Creek
Forsgren Associates, Dry Creek Irrigation District Infrastructure Master Plan Level II, Final Report, Jul, 2016
Forsgren Associates, Dry Creek Irrigation District Infrastructure Master Plan Level II, Executive Summary, Jul, 2016

Dubois
Nelson Engineering, Town of Dubois Groundwater Exploration Program, Final Report, Jan, 1992
James Gores and Associates, P.C., Dubois Area Water Master Plan Level I, Final Report, May, 1999
James Gores and Associates, P.C., Dubois Area Water Master Plan Level I, Executive Summary, May, 1999
Stetson Engineering, Inc, Level II Report Town of Dubois Water Supply Study Final, Aug, 2004
Stetson Engineering, Inc, Dubois Water Supply Level II Study, Executive Summary, Aug, 2004
Stetson Engineering, Inc, Executive Summary for Dubois Water Supply Extended Level II Study, Feb, 2007
Stetson Engineering, Inc, Dubois Test Well Drilling Project, Dubois Water Supply Extended Level II Study, Feb, 2007

Eden Valley
Johnson-Fermelia Company, Inc., Eden Valley (Farson) Master Plan Level II Study, Final Report, Oct, 2015
Johnson-Fermelia Company, Inc., Eden Valley (Farson) Master Plan Level II Study, Executive Summary, Oct, 2015
J-U-B Engineers, Inc., Eden Valley Irrigation and Drainage District Master Plan Level I Study, Map Book, Oct, 2017
J-U-B Engineers, Inc., Eden Valley Irrigation and Drainage District Master Plan Level I Study, Final Report, Oct, 2017
J-U-B Engineers, Inc., Eden Valley Irrigation and Drainage District Master Plan Level I Study, Executive Summary, Oct, 2017
J-U-B Engineers, Inc., Eden Valley Irrigation and Drainage District Master Plan Level I Study, Appendices, Oct, 2017

Edgerton-Midwest
TriHydro Corporation, Water Supply Project for the Towns of Edgerton and Midwest, Report of Investigation, Mar, 1988
TriHydro Corporation, Water Supply Project for the Towns of Edgerton and Midwest, Executive Summary, Mar, 1988
Worthington, Lenhart, Carpenter & Johnson, Edgerton/Midwest Water Supply Project Level II Conceptual Design Report, Dec, 1988
Worthington, Lenhart, Carpenter & Johnson, Edgerton/Midwest Water Supply Project Level II, Executive Summary, Jan, 1989
Worthington, Lenhart, Carpenter & Johnson, Edgerton/Midwest Water Supply Project Level II Conceptual Design Report Task 15, Alternative Water Source Evaluation, Aug, 1989
Western Water Consultants, Pre-Design Report and Cost Estimates for the Edgerton-Midwest Reverse Osmosis Plant, Aug, 1990
Worthington, Lenhart, Carpenter & Johnson, Level II Conceptual Design Report Task 10, Downsizing of the Edgerton/Midwest Water Supply Project, Aug, 1991

Eight Mile High
Wester Wetstein & Associates, Eight Mile High Plains Well Project Level II, Dec, 2004
Wester Wetstein & Associates, Report on the Eight Mile-High Plains Well Project Level II, Phase II, Feb, 2006
Wester Wetstein & Associates, Executive Summary of the Report on the Eight Mile-High Plains Well Project Level II, Phase II, Feb, 2006

Elk Mountain
Weston Engineering, Inc., Elk Mountain Water Supply Master Plan, Level I Report, Mar, 1995
Weston Engineering, Inc., Elk Mountain Water Supply Master Plan, Executive Summary, Mar, 1995
Weston Engineering, Inc., Elk Mountain Water Supply Project, Level II, Final Report, Dec, 1995
Weston Engineering, Inc., Elk Mountain Water Supply Project, Executive Summary, Dec, 1995
PMPC, Town of Elk Mountain Groundwater Development Program Elk Mountain Well No. 4, Final Report, Dec, 2011

Encampment
Howard Needles Tammen & Bergendoff, Level II Feasibility Study, Water Supply for Town of Encampment, Phase 1 Status Report, Evaluate Existing Water Supply, Oct, 1982
Howard Needles Tammen & Bergendoff, Level II Feasibility Study, Water Supply for Town of Encampment, Phase 2 Status Report, Identify and Prioritize Additional Water Supply Alternatives, Nov, 1982
Howard Needles Tammen & Bergendoff, Water Supply for Town of Encampment Level II Feasibility Study, Final Report, Apr, 1984
PMPC, Final Report, Level II Feasibility Study, Encampment Water Supply System, Nov, 1997
PMPC, Executive Summary, Level II Feasibility Study, Encampment Water Supply System, Nov, 1997
PMPC, Encampment Sierra Madre Well Level II Study, Summary Report, May, 2007

Enterprise
Aqua Engineering, Inc., Enterprise Conservation Program Level II Study, Final Report, Sep, 2008
Aqua Engineering, Inc., Enterprise Conservation Program Level II Study, Executive Summary, Sep, 2008

Etna
Lidstone & Anderson, Inc, Etna Diversion Dam Project Level II Study, Final Report, Oct, 1990
Lidstone & Anderson, Inc, Etna Diversion Dam Project Level II Study, Executive Summary, Oct, 1990

Evanston
Sunrise Engineering, Evanston Water System Master Plan Level II Study, Executive Summary, Nov, 1997
Sunrise Engineering, Evanston Water System Master Plan Level II Study, Nov, 1997
Sunrise Engineering, Evanston/Bear River Regional Pipeline Level II Study, Executive Summary, Jul, 2005
Sunrise Engineering, Evanston/Bear River Regional Pipeline Level II Study, Jul, 2005
Sunrise Engineering, Evanston/Bear River Regional Pipeline Level II Study, Jul, 2005
WHS Engineering, City of Evanston Master Plan, Level I Study, Nov, 2020
WHS Engineering, City of Evanston Master Plan, Level I Study, Appendix, Nov, 2020
WHS Engineering, City of Evanston Master Plan, Level I Study, Executive Summary, Nov, 2020

Evansville
MSM Consultants, Evansville Groundwater Availability Study, Aug, 1982
Sargent Irrigation Company, Report and Recommendations for the Location and Development of Groundwater Resources for the Town of Evansville, Wyoming, Aug, 1983
Howard Needles Tammen & Bergendoff, Water Development Program for Town of Evansville, Natrona County, Wyoming, Feasibility Study, May, 1985
Howard Needles Tammen & Bergendoff, Evansville Casper Water System Final Feasibility Study, Jul, 1986
James M. Montgomery, Consulting Engineers, Evansville Groundwater Supply Project, Final Report, Jun, 1990
States West Water Resources Corporation, Elkhorn Creek Water Rights/Supply Analyses, Evansville, Wyoming, Oct, 1994
C.H. Guernsey & Company, Evansville Water Master Plan Level I Study, Final Report, Sep, 2009
C.H. Guernsey & Company, Evansville Water Master Plan Level I Study, Executive Summary, Sep, 2009

Farson
Johnson-Fermelia Company, Inc., Farson Water Supply Study, Level I, Final Report, Oct, 1990
Johnson-Fermelia Company, Inc., Farson Water Supply Study, Level I, Executive Summary, Oct, 1990
Johnson-Fermelia Company, Inc., Master Plan for the Farson Water Supply Level I Study, Final Report, Sep, 2012
Johnson-Fermelia Company, Inc., Master Plan for the Farson Water Supply Level I Study, Executive Summary, Sep, 2012

Farview
Stetson Engineering, Inc, Farview Water District Water Supply Level II Study, Final Report, Jun, 2010
Stetson Engineering, Inc, Farview Water District Water Supply Level II Study, Executive Summary, Jun, 2010

Fayette
Rio Verde Engineering, Fayette Irrigation District Rehabilitation Project, Final Report, Oct, 1999
Rio Verde Engineering, Fayette Irrigation District Rehabilitation Project, Executive Summary, Nov, 1999

Ferris Ditch
Eastern Wyoming Engineering and Surveying, Ferris Ditch Diversion Rehabilitation Project, Phase I Report, June 9, 1989, Jun, 1989
Eastern Wyoming Engineering and Surveying, Ferris Ditch Diversion Rehabilitation Project, Phase II Report, Final Report, Oct, 1989
Kennedy Engineering, Ferris Irrigation District Canal Improvements Project Level II Feasibility Report, Dec, 1990

Fish Creek
Rollins Brown and Gunnell, Fish Creek Dam, Geotechnical Study and Alternative Evaluations, Sep, 1984
Stone and Webster Engineering, Little Snake River Water Management Project, Fish Creek Collector System Yields, Jun, 1985
Stone and Webster Engineering, Fish Creek Collection System Progress Report on the North Platte River Studies, Apr, 1986
Stone and Webster Engineering, Fish Creek Collection System, Interim Phase I Concept Design Report, Nov, 1986
Stone and Webster Engineering, Fish Creek Collection System Interim Phase I Concept Design, Report, Executive Summary, Nov, 1986

Fontenelle Dam
Engineering Analytics, Inc., Fontenelle Dam and Outworks Infrastructure Completion Level II Study, Final Report, Dec, 2018
Engineering Analytics, Inc., Fontenelle Dam and Outworks Infrastructure Completion Level II Study, Executive Summary, Dec, 2018

Fort Laramie
AVI Professional Corporation, Fort Laramie Water Supply Rehabilitation Level II Study, Final Report, Jul, 2008
AVI Professional Corporation, Fort Laramie Water Supply Rehabilitation Level II Study, Executive Summary, Jul, 2008

Frannie
Western Water Consultants, Potential Water-Well Sites for the Towns of Frannie and Deaver, Wyoming, Feb, 1985
Western Water Consultants, Final Report, Drilling and Testing of Frannie-Deaver Test Well #1, Sep, 1986
Falcon Consulting Services L.L.C., Frannie Well Rehabilitation Level II Study (Kirk #1) Frannie, Wyoming, Final Report, Oct, 2005
Aqua Engineering, Inc., Frannie Raw Water Level II Study, Final Report, Oct, 2008

Freedom
TriHydro Corporation, Construction and Testing Report Freedom No. 2 Test Well Freedom, Wyoming, Feb, 1993

Fremont Lake Dam
Rio Verde Engineering, Rehabilitation of Fremont Lake Dam, Sep, 1980

Gillette
James M. Montgomery, Consulting Engineers, City of Gillette Madison Well Field, Well M-3 Enhancement, May, 1992
HKM Associates, Phase I Interim Report for Gillette Area Master Plan, Gillette, Wyoming, May, 1993
HKM Associates, Phase II Final Report for Gillette Area Master Plan, Gillette, Wyoming, Feb, 1994
Wester Wetstein & Associates, Gillette Well Rehabilitation Study Level II, Executive Summary, Oct, 1994
Wester Wetstein & Associates, Report for Gillette Wells Project Level II Feasibility Study-Rehabilitation, Nov, 1994
Wyoming State Engineer's Office, Fort Union Formation Aquifer Monitoring Plan and Preliminary Aquifer Management Plan, Nov, 1995
Stetson Engineering, Inc, City of Gillette Water System Evaluation, Report, Oct, 1999
Stetson Engineering, Inc, City of Gillette Water System Evaluation, Executive Summary, Oct, 1999
Wester Wetstein & Associates, Coal Bed Methane-Aquifer Storage and Retrieval Project Level II, Interim Report, Sep, 2003
Wester Wetstein & Associates, Coal Bed Methane-Aquifer Storage and Retrieval Project Level II Southern Ft. Union Well Field Exploration Program and Development Study, Final Report, Dec, 2004
Wester Wetstein & Associates, Coal Bed Methane-Aquifer Storage and Retrieval Project Level II Southern Ft. Union Well Field Exploration Program and Development Study, Executive Summary, Dec, 2004
HDR Engineering, Inc., Gillette Regional Master Plan Level I Study, Final Report, Oct, 2009
HDR Engineering, Inc., Gillette Regional Master Plan Level I Study, Executive Summary, Oct, 2009
WLC Engineering, Surveying & Planning, Gillette Regional Connections 2 Level II Study, Peoples Improvement & Service District, Final Report, Oct, 2012
WLC Engineering, Surveying & Planning, Gillette Regional Connections 2 Level II Study, Peoples Improvement & Service District, Executive Summary, Oct, 2012
EnTech, Inc, Gillette Regional Connections 1 Level II Study, Bennor Estates Connection, Final Report, Feb, 2013
EnTech, Inc, Gillette Regional Connections 1 Level II Study, Bennor Estates Connection, Executive Summary, Feb, 2013
WLC Engineering, Surveying & Planning, Gillette Regional Connections 2 Level II Study, South Fork Estates Improvement and Service District, Final Report, Jul, 2013
WLC Engineering, Surveying & Planning, Gillette Regional Connections 2 Level II Study, South Fork Estates Improvement and Service District, Executive Summary, Jul, 2013
WLC Engineering, Surveying & Planning, Gillette Regional Connections 2 Level II Study, Freedom Hills Improvement and Service District, Final Report, Aug, 2013
WLC Engineering, Surveying & Planning, Gillette Regional Connections 2 Level II Study, Freedom Hills Improvement and Service District, Executive Summary, Aug, 2013
EnTech, Inc., Gillette Regional Connections 1 Level II Study, Antelope Valley Connections, Final Report, Sep, 2013
EnTech, Inc, Gillette Regional Connections 1 Level II Study, Antelope Valley Connections, Executive Summary, Sep, 2013
DOWL, Gillette Regional Connection Level II Study, Means First Extension Master Plan, Final Report, Aug, 2015
DOWL, Gillette Regional Connection Level II Study, Means First Extension Master Plan, Executive Summary, Aug, 2015
DOWL, Gillette Regional Connection Level II Study, Means First Extension Master Plan, Environmental Report, Aug, 2015
Woodard & Curran, Gillette Regional Level II Study, Grace Land Extension Master Plan, Final Report, Aug, 2017
Woodard & Curran, Gillette Regional Level II Study, Grace Land Extension Master Plan, Executive Summary, Aug, 2017
DOWL, Gillette Regional Level II Study, Fox Ridge Extension Master Plan, Final Report, Aug, 2017
DOWL, Gillette Regional Level II Study, Fox Ridge Extension Master Plan, Executive Summary, Aug, 2017
Woodard & Curran, Gillette Regional Level II Study, Buckskin Extension Master Plan, Final Report, Aug, 2017
Woodard & Curran, Gillette Regional Level II Study, Buckskin Extension Master Plan, Executive Summary, Aug, 2017
Morrison-Maierle, Inc., Gillette Water System Improvements, Level II, Executive Summary, Aug, 2022
Morrison-Maierle, Inc., Gillette Water System Improvements, Level II, Final Report, Aug, 2022

Glendo
Morrison-Maierle, Inc., Glendo Groundwater Exploration Program Feasibility Study, Mar, 1984
Hibsman & Associates, Water Transmission System Level II Feasibility Study, Final Report, Nov, 1990
Wyoming Groundwater, LLC, Glendo Water Supply Level II Study, Executive Summary, Feb, 2009
Wyoming Groundwater, LLC, Glendo Water Supply Level II Study , Feb, 2009
RTI International, Glendo Reservoir Full Utilization Level II Study, Executive Summary, Dec, 2018
RTI International, Glendo Reservoir Full Utilization Level II Study, Final Report, Dec, 2018

Glenrock
Nelson Engineering, A Plan to Drill and Test a Water Well South of the Town of Glenrock, Wyoming, Dec, 1982
Nelson Engineering, Glenrock Water Supply Design Report, Jan, 1986
Sunrise Engineering, Glenrock Raw Water Irrigation Project Level II Study, Phase 1 Executive Summary, Oct, 1998
Sunrise Engineering, Glenrock Raw Water Irrigation Project Level II Study, Phase 1, Oct, 1998
Sunrise Engineering, Glenrock Water Source Project Level II Study, Phase II, Final Report, Feb, 2000
Sunrise Engineering, Glenrock Water Source Project Level II Study, Phase II, Executive Summary, Feb, 2000
Weston Engineering, Inc., Glenrock Level II Well and Tank Feasibility Study, Interim Report, Oct, 2005
Weston Engineering, Inc., Glenrock Well and Tank Project Level II Feasibility Study, Water Tank and Pipeline Improvements, Interim Report, Jun, 2006
Weston Engineering, Inc., Glenrock Test Well No. 7 Groundwater Monitoring Report, Aug, 2007
Weston Engineering, Inc., Glenrock Level II Well and Tank Feasibility Study, Final Report, Oct, 2007
Weston Engineering, Inc., Glenrock Level II Well and Tank Feasibility Study, Executive Summary, Oct, 2007
CEPI, Glenrock Master Plan Level I Study, Final Report, Apr, 2011
CEPI, Glenrock Master Plan Level I Study, Executive Summary, Apr, 2011

Globe Canal
James Gores and Associates, P.C., Globe Canal Investigations Level II Rehabilitation Plan, Dec, 1989
James Gores and Associates, P.C., Globe Canal Investigations Level II, Final Report, Aug, 1990
James Gores and Associates, P.C., Globe Canal Investigations Level II, Executive Summary, Aug, 1990

Goose Creek
EnTech Inc., Goose Creek Watershed Level I Study, Final Report, Nov, 2018
EnTech Inc., Goose Creek Watershed Level I Study, Executive Summary, Nov, 2018

Gooseberry Creek
Leonard Rice Consulting Water Engineers, Inc, Gooseberry Creek Water Resources Study, Jan, 1983
Western Water Consultants, Gooseberry Creek Water Development Project Level II Feasibility Study, Final Report, Appendices, Feb, 1984
Western Water Consultants, Gooseberry Creek Water Development Project Level II Feasibility Study, Final Report, Feb, 1984
Western Water Consultants, Feasibility Report for Formation of Gooseberry Creek Irrigation District, Gooseberry Creek Water Development Project, Apr, 1984
Morrison-Knudsen Engineers, Inc., Phase I Interim Report, Gooseberry Creek Level III Study, Feb, 1985
International Engineering Company, Inc, Phase I, Part II, Gooseberry Creek Interim Report, Level III Project, Jan, 1986
International Engineering Company, Inc, Gooseberry Level III Project, Executive Summary, Jan, 1986
Morrison-Knudsen Engineers, Inc., Gooseberry Level III Project, Phase II Summary Report, Feb, 1987
Lidstone & Associates, Inc, Gooseberry Creek Level I Study, Executive Summary, Oct, 2005
Lidstone & Associates, Inc, Gooseberry Creek Level I Study, Oct, 2005
Lidstone & Associates, Inc, Gooseberry Creek Storage Level II Study, Final Report, Feb, 2007
Lidstone & Associates, Inc, Gooseberry Creek Storage Level II Study, Executive Summary, Feb, 2007

Goshen
Kennedy Engineering, Final Report on Goshen Irrigation District Rehabilitation Project, Nov, 1985
Lidstone & Anderson, Inc, Goshen Irrigation District Rehabilitation Project Level II, Final Report, Dec, 1991
Lidstone & Anderson, Inc, Goshen Irrigation District Rehabilitation Project Level II, Executive Summary, Dec, 1991
Lidstone & Anderson, Inc, Goshen Irrigation District Level II Rehabilitation Project, Siphons, Tunnels and Canal Evaluation, Final Report, Oct, 1992
Lidstone & Anderson, Inc, Goshen Irrigation District Level II Rehabilitation Project, Siphons, Tunnels and Canal Evaluation, Executive Summary, Oct, 1992
Lidstone & Anderson, Inc, Goshen Irrigation District Horse Creek Re-Regulating Reservoir, Level II Project, Executive Summary, Dec, 1993
Lidstone & Anderson, Inc, Final Report for Goshen Irrigation District Horse Creek Re-Regulating Reservoir, Level II Project, Dec, 1993
Lidstone & Anderson, Inc, Goshen Hole and Goshen Mutual Irrigation Canal Companies Improvements Project Level II, Final Report, Jan, 1999
Lidstone & Anderson, Inc, Goshen Hole and Goshen Mutual Canal Companies Improvements Project Level II, Executive Summary, Jan, 1999
Anderson Consulting Engineers, Inc., Goshen Irrigation District Rehabilitation Project Level II, Final Report, Nov, 1999
Anderson Consulting Engineers, Inc., Goshen Irrigation District Rehabilitation Project Level II, Executive Summary, Nov, 1999
Anderson Consulting Engineers, Inc., Final Report for Goshen Irrigation District Master Plan Level I, Aug, 2008
Anderson Consulting Engineers, Inc., Executive Summary for Goshen Irrigation District Master Plan Level I, Aug, 2008

Granger
ARIX Corporation, Town of Granger, Wyoming Water Supply Project Level II Feasibility Study, Executive Summary, May, 1990
ARIX Corporation, Town of Granger, Wyoming Water Supply Project Level II Feasibility Study, May, 1990
Forsgren Associates, Granger Water Supply Master Plan Level I, Final Report, Oct, 2000
Forsgren Associates, Granger Water Supply Master Plan Level I, Executive Summary, Oct, 2000
Forsgren Associates, Granger Rehabilitation Project Level II, Final Report, Dec, 2002
Forsgren Associates, Granger Rehabilitation Project Level II, Executive Summary, Dec, 2002

Green River
Western Wyoming College, WWC Water Quality Laboratory, Green River Basin Project, Jan, 1982
States West Water Resources Corporation, Green River Basin Plan, Technical Memoranda--AA, Irrigation Diversion Operation and Description , Jan, 2001 ( kb)
States West Water Resources Corporation, Green River Basin Plan, Technical Memoranda, Jan, 2001 ( kb)
States West Water Resources Corporation, Green River Basin Plan, Final Report, Jan, 2001 (10,243 kb)
States West Water Resources Corporation, Green River Basin Plan, Executive Summary, Jan, 2001 ( kb)
States West Water Resources Corporation, Final Report for Green River Ground Water Recharge and Alternate Storage Level I Project, Dec, 2001
States West Water Resources Corporation, Executive Summary for Green River Ground Water Recharge and Alternate Storage Level I Project, Dec, 2001
States West Water Resources Corporation, Final Report for the Green River ASR and Alternate Storage Project, Church Reservoir Investigation (see Church), Dec, 2002
States West Water Resources Corporation, Executive Summary for the Green River ASR and Alternate Storage Project, Church Reservoir Investigation (see Church), Dec, 2002
Nelson Engineering, Green River Supply Canal Report Phase I, Nov, 2003
Nelson Engineering, Green River Supply Canal Report Seepage Study Report, Dec, 2004
Nelson Engineering, Green River Supply Canal Report Phase II, Conceptual Design-Rehabilitation, Dec, 2004
Nelson Engineering, Green River Supply Canal Reports Executive Summary, Feb, 2005
Nelson Engineering, Final Report, Green River, Rock Springs, Sweetwater County, Joint Powers Water Board, Master Plan, Level I Study, Jan, 2007
Nelson Engineering, Final Report, Green River, Rock Springs, Sweetwater County, Joint Powers Water Board, Water System Master Plan Phase 2, Jan, 2009
Nelson Engineering, Executive Summary, Green River, Rock Springs, Sweetwater County, Joint Powers Water Board, Water System Master Plan Phase 2, Jan, 2009
Nelson Engineering, Executive Summary, Green River, Rock Springs, Sweetwater County, Joint Powers Water Board, Water System Master Plan Phase 1, Jan, 2009
Nelson Engineering, Green River-Rock Springs-Sweetwater County Joint Powers Water Board Water Supply Level II Study, Final Report, Jul, 2010
Nelson Engineering, Green River-Rock Springs-Sweetwater County Joint Powers Water Board Water Supply Level II Study, Executive Summary, Jul, 2010
Wyoming State Geological Survey, Available Groundwater Determination Technical Memorandum, WWDC Green River Basin Water Plan II Groundwater Study, Level I (2007-2009), Executive Summary, Aug, 2010 (8,249 kb)
Wyoming State Geological Survey, Available Groundwater Determination Technical Memorandum, WWDC Green River Basin Water Plan II Groundwater Study, Level I (2007-2009), Aug, 2010 (22,178 kb)
Wyoming State Geological Survey, Available Groundwater Determination Technical Memorandum, WWDC Green River Basin Water Plan II Groundwater Study Level I (2007-2009), Plates, Aug, 2010 ( kb)
WWC Engineering, Green River Basin Plan, Executive Summary, Dec, 2010 (1,572 kb)
WWC Engineering, Green River Basin Plan Technical Memoranda, Dec, 2010 ( kb)
WWC Engineering, Green River Basin Plan, Dec, 2010 (10,246 kb)
Leonard Rice Consulting Water Engineers, Inc, Green River Decision Support System Feasibility Study, Executive Summary, Mar, 2011
Leonard Rice Consulting Water Engineers, Inc, Green River Decision Support System Feasibility Study, Mar, 2011
Keller Associates, Green River West Water Supply Level II Study, Final Report, Aug, 2012
Keller Associates, Green River West Water Supply Level II Study, Executive Summary, Aug, 2012
Hansen, Allen, & Luce, Inc., Green River-Rock Springs-Sweetwater County Joint Powers Water Board Pipeline Feasibility Study, Level II, Final Report, Nov, 2016
Hansen, Allen, & Luce, Inc., Green River-Rock Springs-Sweetwater County Joint Powers Water Board Pipeline Feasibility Study, Level II, Executive Summary, Nov, 2016
Western EcoSystems Technology, Inc., Green River Basin Plan Update Environmental and Recreational Water Use Analysis for the Green River Basin, Wyoming, Sep, 2017 (11,475 kb)
Sunrise Engineering, Wind River Zone Level II Study, Final Report, Jul, 2018
Sunrise Engineering, Wind River Zone Level II Study, Executive Summary, Jul, 2018
Sunrise Engineering, Green River Rock Springs Sweetwater County Joint Powers Water Board Finished Water Pump Station and Transmission Level II Study, Final Report, Jul, 2019
Sunrise Engineering, Green River Rock Springs Sweetwater County Joint Powers Water Board Finished Water Pump Station and Transmission Level II Study, Executive Summary, Jul, 2019
Sunrise Engineering, Green River-Rock Springs-Sweetwater County Joint Powers Water Board Eastside Zone Study, Level II, Final Report, Sep, 2024
Sunrise Engineering, Green River-Rock Springs-Sweetwater County Joint Powers Water Board Eastside Zone Study, Level II, Executive Summary, Sep, 2024

Greybull
John W. Donnell & Associates, Feasibility Study on Supplementary Groundwater Supply for Town of Greybull, Wyoming, Jun, 1982
Big Horn Engineering, Final Report on Groundwater Exploration Program for Town of Greybull, Wyoming, Sep, 1983
GEI Consultants, Phase I Draft Summary Report, Greybull Valley Dam and Reservoir Project, Jan, 1991
GEI Consultants, Appendices A through D to the Phase I Draft Summary Report Greybull Valley Dam and Reservoir Project, Jan, 1991
GEI Consultants, Phase II Summary Report, Enclosures 1 Through 3, Greybull Valley Dam and Reservoir Project, Aug, 1991
GEI Consultants, Geotechnical Investigations Report of Alternative Borrow Sources on Private Property Downstream of the Lower Dam Site, Greybull Valley Dam and Reservoir Project, Addendum No. 2 to Appendix A, Apr, 1992
GEI Consultants, Greybull Valley Dam and Reservoir Project Level II, Phase III, Draft Conceptual Design Report, Aug, 1992
Bureau of Reclamation, Greybull Valley Dam and Reservoir, Wyoming, Economic Evaluation, Jan, 1994
GEI Consultants, Greybull Valley Dam and Reservoir Project Level II, Phase VI, Alternatives Evaluation Report, Aug, 1994
GEI Consultants, Greybull Valley Dam and Reservoir Project Level II, Phase V, Final Report, Conceptual Design Report, Aug, 1994
GEI Consultants, Greybull Valley Dam and Reservoir Project Level II, Phase V, Executive Summary, Conceptual Design Report, Aug, 1994
Nelson Engineering, Greybull Water Supply Project Level II, Final Design Report, Nov, 1995
Nelson Engineering, Greybull Water Supply Project Level II, Executive Summary, Nov, 1995
Nelson Engineering, Greybull Water Supply Project Level II, Phase II and III, Exploration Well and Conceptual Design, Final Report, Sep, 1997
Nelson Engineering, Greybull Water Supply Project Level II, Phase II and III, Exploration Well and Conceptual Design, Executive Summary, Sep, 1997
Engineering Associates, Town of Greybull Water Supply Project Level II, Final Report, Apr, 1998
Engineering Associates, Town of Greybull Water Supply Project Level II, Executive Summary, Apr, 1998
ECI, Final Greybull Hydropower Study Level II Project, Apr, 2003
ECI, Executive Summary Greybull Hydropower Study Level II Project, Apr, 2003
Engineering Associates, Level II Study, Town of Greybull Raw Water Supply Project, Final Report, May, 2003
Engineering Associates, Level II Study, Town of Greybull Raw Water Supply Project, Executive Summary, May, 2003
Engineering Associates, Level II Study, Town of Greybull Raw Water Supply Project, Environmental Report, Jun, 2003
Wyoming Groundwater, LLC, Greybull Wells Rehabilitation Level II Study, Well Evaluation, Rehabilitation, and Testing, Greybull Water Transmission Pipeline Evaluation Well Sitting Study, Volume II of II, Nov, 2006
Wyoming Groundwater, LLC, Greybull Wells Rehabilitation Level II Study, Well Evaluation, Rehabilitation, and Testing, Greybull Water Transmission Pipeline Evaluation Well Sitting Study, Volume I of II, Nov, 2006
Wyoming Groundwater, LLC, Greybull Wells Rehabilitation Level II Study, Well Evaluation, Rehabilitation, and Testing, Greybull Water Transmission Pipeline Evaluation Well Sitting Study, Executive Summary, Nov, 2006
Anderson Consulting Engineers, Inc., Greybull Valley Rehabilitation/Upper Sunshine Diversion Level II Study, Final Report, Jun, 2010
Anderson Consulting Engineers, Inc., Greybull Valley Rehabilitation/Upper Sunshine Diversion Level II Study, Executive Summary, Jun, 2010
Sage Civil Engineering, Greybull Valley Rehabilitation and GIS Level II Study, Final Report, Dec, 2010
Sage Civil Engineering, Greybull Valley Rehabilitation and GIS Level II Study, Executive Summary, Dec, 2010
AECOM, Greybull Valley Irrigation District Hydropower Level II Study, Final Report, Jan, 2014
AECOM, Greybull Valley Irrigation District Hydropower Level II Study, Executive Summary, Jan, 2014
Forsgren Associates, Greybull Tank and Master Plan Level I, Final Report, Sep, 2015
Forsgren Associates, Greybull Tank and Master Plan Level I, Executive Summary, Sep, 2015
AECOM, Greybull Valley Irrigation District Storage Enlargement Level II, Phase I Study, Final Report, Mar, 2017
AECOM, Greybull Valley Irrigation District Storage Enlargement Level II, Phase I Study, Executive Summary, Mar, 2017
AECOM, Greybull Valley Irrigation District Storage Enlargement Level II, Phase II Study, Final Report, Dec, 2020
AECOM, Greybull Valley Irrigation District Storage Enlargement Level II, Phase II Study, Executive Summary, Dec, 2020
Woodard & Curran, Greybull River Watershed Level I Study, Final Report, Nov, 2018
Woodard & Curran, Greybull River Watershed Level I Study, Executive Summary, Nov, 2018

Guernsey
Lidstone & Anderson, Inc, Final Report, Analysis of the Guernsey Reservoir Silt Run, Jan, 1993
TST Inc., Guernsey Water Supply Master Plan, Level I Final, Nov, 1995
TST Inc., Executive Summary, Town of Guernsey, WY Water Supply Master Plan, Level I, Nov, 1995
TST Inc., Guernsey Hydraulic Study Level II, Final Report, Nov, 2003
TST Inc., Guernsey Hydraulic Study Level II, Executive Summary, Nov, 2003
TST Inc., Guernsey Hydraulic Study Level II Technical Addendum II, Environmental Impact Report, Nov, 2003
TST Inc., Guernsey Hydraulic Study Level II Technical Addendum I, Distribution Analysis & Preliminary Plans, Nov, 2003
AVI Professional Corporation, Guernsey Master Plan Level I Study, Final Report, Aug, 2013
AVI Professional Corporation, Guernsey Master Plan Level I Study, Executive Summary, Aug, 2013
AVI Professional Corporation, Guernsey Groundwater Exploration Grant, Final Report, Sep, 2015
Dahlgren Consulting, Inc, Guernsey Golf Course Well Project, Final Summary Report, Oct, 2019

Gunbarrel Lateral Ditch
Kennedy Engineering, Gunbarrel Lateral Ditch Studies, Final Report, Rehabilitation Plan, Preferred Alternate B, Nov, 1995
Kennedy Engineering, Gunbarrel Lateral Ditch Studies, Executive Summary, Rehabilitation Plan, Preferred Alternate B, Nov, 1995

Hams Fork
Greenhorne & O'Mara, Inc., Hams Fork Basin Level II Investigations, Phase I Water Resources Analysis, Nov, 1984
Greenhorne & O'Mara, Inc., Hams Fork Basin Level II Investigations, Executive Summary, Phase I Water Resources Analysis, Nov, 1984

Hanna
Geotechnical Corp, Hanna, Wyoming Application for Ground Water Exploration Grant Funds, Jul, 1981
Black & Veatch, Hanna, Wyoming, Wyoming Water Development Commission Ground Water Exploration Program Progress Report, May, 1982
Black & Veatch, Hanna, Wyoming Groundwater Exploration Program, Wyoming Water Development Commission Exploratory Drilling Report, Apr, 1983
Black & Veatch, Hanna, Wyoming Report on Water Resource Development Alternatives, May, 1984
AVI Professional Corporation, Hanna Master Plan Level I Study, Final Report, Sep, 2012
AVI Professional Corporation, Hanna Master Plan Level I Study, Executive Summary, Sep, 2012
Western EcoSystems Technology, Inc., City of Hanna Waterline Replacement Environmental Review, Nov, 2012
PMPC, Hanna Water System Level II Study, Final Report, Oct, 2014
PMPC, Hanna Water System Level II Study, Executive Summary, Oct, 2014

Hanover
Western Heritage Consulting & Engineering, Hanover Irrigation District Master Plan Level I Study, Final Report, Aug, 2017
Western Heritage Consulting & Engineering, Hanover Irrigation District Master Plan Level I Study, Executive Summary, Aug, 2017
Inberg-Miller Engineers, Hanover Irrigation District Big Horn River Irrigation Flume Level II Study, Final Report, Jul, 2019

Happy Valley
Sunrise Engineering, Happy Valley Water Supply Level II Summary, Final Report, Jul, 2021
Sunrise Engineering, Happy Valley Water Supply Level II Summary, Executive Summary, Jul, 2021

Hartville
TST Inc., Hartville Water Supply Master Plan Level I, Nov, 1995
TST Inc., Executive Summary, Town of Hartville, WY Water Supply Master Plan Level I, Nov, 1995
Weston Engineering, Inc., Hartville Water Supply Level II, Final Report, Jan, 1997
Weston Engineering, Inc., Hartville Water Supply Level II, Executive Summary, Jan, 1997

Hawk Springs
Banner Associates, Inc, Hawk Springs Reservoir Enlargement Analysis, May, 1992
BRS Inc, Hawk Springs Water Supply Project, Final Report, Mar, 1996
BRS Inc, Hawk Springs Water Supply Project, Executive Summary, Mar, 1996
AVI Professional Corporation, Hawk Springs Level II Master Plan Study, Final Report, Oct, 2013
AVI Professional Corporation, Hawk Springs Level II Master Plan Study, Executive Summary, Oct, 2013

Heart Mountain
Aqua Engineering, Inc., Heart Mountain Irrigation District Return Flow Level I Study, Final Report, May, 2006
Aqua Engineering, Inc., Heart Mountain Irrigation District Return Flow Level I Study, Executive Summary, May, 2006
Engineering Associates, Heart Mountain Screens Level II Study, Final Report, Apr, 2007
Engineering Associates, Heart Mountain Screens Level II Study, Executive Summary, Apr, 2007
Sage Civil Engineering, Heart Mountain Irrigation District Master Plan Level II Study, Final Report, May, 2015
Engineering Associates, Heart Mountain Canal Rehabilitation Level II Study, Amended Final Report, Aug, 2017
Engineering Associates, Heart Mountain Canal Rehabilitaiton Level II Study, Amended Executive Summary, Aug, 2017
Engineering Associates, Heart Mountain Canal Rehabilitation Level II Study, Final Report, Jul, 2016
Engineering Associates, Heart Mountain Canal Rehabilitation Level II Study, Executive Summary, Jul, 2016

Hidden Hills
EnTech, Inc, Final Report for Hidden Hills Water System Level I Study, Dec, 2001

Hidden Valley
Anderson Consulting Engineers, Inc., Final Report for Hidden Valley Pipeline Level II Feasibility Study, Nov, 2003
Anderson Consulting Engineers, Inc., Executive Summary for Hidden Valley Pipeline Level II Feasibility Study, Nov, 2003

High Meadow Ranch
WLC Engineering, Surveying & Planning, High Meadow Ranch Master Plan Level I Study, Final Report, Aug, 2014
WLC Engineering, Surveying & Planning, High Meadow Ranch Master Plan Level I Study, Executive Summary, Aug, 2014
Jorgensen Associates, P.C., High Meadow Ranch Level II Report, Final Report, Sep, 2016
Jorgensen Associates, P.C., High Meadow Ranch Level II Report, Executive Summary, Sep, 2016
Jorgensen Associates, P.C., High Meadow Ranch Water District Environmental Assessment Report, Nov, 2016

High Savery
West, Inc, High Savery Reservoir Wetland Mitigation Monitoring Report, Appendix B, Photographs of Savery Wetland Mitigation Sites, Jan, 2004
Wyoming Water Development Commission, High Savery Dam and Reservoir 2004 Monitoring Report, Jan, 2004
West, Inc, Wetland Monitoring Results High Savery Reservoir Wetland Mitigation Sites 2007 Field Season Final Report, Feb, 2008
West, Inc, Riparian and Upland Monitoring Project High Savery Dam and Reservoir Project Carbon County, Wyoming 2007 Field Season Final Report, Feb, 2008

Highland Hanover
Centennial Engineering & Research, Inc., Rehabilitation Feasibility Study, Highland Hanover Irrigation District, Final Report, Nov, 1988
Centennial Engineering & Research, Inc., Rehabilitation Feasibility Study, Highland Hanover Irrigation District, Executive Summary, Nov, 1988
Western Heritage Consulting & Engineering, Highland Hanover Irrigation District Master Plan Level I Study, Final Report, Sep, 2018
Western Heritage Consulting & Engineering, Highland Hanover Irrigation District Master Plan Level I Study, Executive Summary, Sep, 2018
Western Heritage Consulting & Engineering, Highland Hanover Irrigation District Pump Station, Level II Study, Final Report, Aug, 2021
Western Heritage Consulting & Engineering, Highland Hanover Irrigation District Pump Station, Level II Study, Executive Summary, Aug, 2021

Highland Irrigation District
AVI Professional Corporation, Highland Irrigation District Master Plan Level I Study, Final Report, Nov, 2022
AVI Professional Corporation, Highland Irrigation District Master Plan Level I Study, Executive Summary, Nov, 2022

Highline Canal
Sage Civil Engineering, Final Report for the Highline Canal Level II, Nov, 2002
Sage Civil Engineering, Executive Summary of Final Report for the Highline Canal Level II, Nov, 2002

Highline Ditch
Western Water Consultants, Highline Ditch Rehabilitation Project Level II Feasibility Study, Executive Summary, Oct, 1987
Western Water Consultants, Highline Ditch Rehabilitation Project Level II Feasibility Study, Oct, 1987

Highline Watershed
Anderson Consulting Engineers, Inc., Highline Watershed Improvement District Ditch Rehabilitation Project Level II, Final Report, Nov, 1999
Anderson Consulting Engineers, Inc., Highline Watershed Improvement District Ditch Rehabilitation Project Level II, Executive Summary, Nov, 1999

Hill Irrigation District
Lidstone & Anderson, Inc, Hill Irrigation District Improvements Level II Project, Final Report, Oct, 1997
Lidstone & Anderson, Inc, Hill Irrigation District Improvements Level II Project, Executive Summary, Oct, 1997

Hoback Junction
Nelson Engineering, Hoback Junction Water Supply Study Level I, Final Report, Mar, 2006
Nelson Engineering, Hoback Junction Water Supply Study Level I, Executive Summary, Mar, 2006

Hoback River Watershed
Rio Verde Engineering, Hoback River Watershed Level I Study, Final Report, Nov, 2022
Rio Verde Engineering, Hoback River Watershed Level I Study, Executive Summary, Nov, 2022

Hog Island
Y2 Consultants, Hog Island Water Master Plan Level I Study, Final Report, Sep, 2018
Y2 Consultants, Hog Island Water Master Plan Level I Study, Executive Summary, Sep, 2018

Hopkins Producers Irrigation District
States West Water Resources Corporation, Hopkins Producers Irrigation District Watershed/Water Storage Project Level I, Final Report, Oct, 2008
States West Water Resources Corporation, Hopkins Producers Irrigation District Watershed/Water Storage Project Level I, Executive Summary, Oct, 2008

Horse Creek
Dames & Moore, Geotechnical Engineering Site Comparison Feasibility Level, Horse Creek Reservoir Project Near Torrington, Wyoming, Sep, 1986
HDR Infrastructure, Inc, Horse Creek Reservoir Level II Study, Final Report, Nov, 1986
HDR Infrastructure, Inc, Horse Creek Reservoir Level II Study, Executive Summary, Nov, 1986
PMPC, Horse Creek Conservation District Improvements Project Level II, Final Report, Dec, 1998
PMPC, Horse Creek Conservation District Improvements Project Level II, Executive Summary, Dec, 1998
Anderson Consulting Engineers, Inc., Horse Creek Watershed Level I Study, Final Report, Dec, 2019
Anderson Consulting Engineers, Inc., Horse Creek Watershed Level I Study, Executive Summary, Dec, 2019

Hot Springs
BRS Inc, Hot Springs Rural-Worland Pipeline Interim Report, Regional Water Supply Project Level II, Sep, 2002
Lidstone & Associates, Inc, Hot Springs State Park Master Plan Level I, Final Report, Feb, 2003
Lidstone & Associates, Inc, Hot Springs State Park Master Plan Level I, Executive Summary, Feb, 2003
Forsgren Associates, Hot Springs Rural-Worland Pipeline Regional Water Supply Project Level II Study, Final Report, Nov, 2004
Forsgren Associates, Hot Springs Rural-Worland Pipeline Regional Water Supply Project Level II Study, Executive Summary, Nov, 2004

Hudson
Morrison-Mairle, Inc, Phase I Feasibility and Phase II Groundwater Exploration Program, Town of Hudson, Jun, 1985
James Gores and Associates, P.C., Town of Hudson Water Supply Level II Study, Final Report, Mar, 2009
James Gores and Associates, P.C., Town of Hudson Water Supply Level II Study, Executive Summary, Mar, 2009

Hugus Mullison Ditch
PMPC, Hugus Mullison Ditch Project Level I, Final Report, Nov, 1999
PMPC, Hugus Mullison Ditch Project Level I, Executive Summary, Nov, 1999
PMPC, Hugus Ditch Rehabilitation Project Level II, Final Report, Nov, 2000
PMPC, Hugus Ditch Rehabilitation Project Level II, Executive Summary, Nov, 2000

Hulett
Bearlodge Ltd, Inc., Hulett Water Supply Level II, Final Report, Volume 2, Dec, 1991
Bearlodge Ltd, Inc., Hulett Water Supply Level II, Final Report, Volume 1, Dec, 1991
Bearlodge Ltd, Inc., Hulett Water Supply Level II, Executive Summary, Dec, 1991

Hunt Canal
Nelson Engineering, Hunt Canal Rehabilitation Project Level II, Final Design Report, Dec, 1989
Nelson Engineering, Hunt Canal Rehabilitation Project Level II, Executive Summary, Dec, 1989

Hyattville
Lidstone & Associates, Inc, Town of Hyattville Water Supply Project Level I Master Plan Report, Dec, 2002
Wester Wetstein & Associates, Hyattville Water Supply Level II Project, Executive Summary, Oct, 2006
Wester Wetstein & Associates, Hyattville Water Supply Level II Project, Final Report, Nov, 2006

Indian Paintbrush
Nelson Engineering, Indian Paintbrush Water Supply Level II Study, Final Report, Sep, 2014
Nelson Engineering, Indian Paintbrush Water Supply Level II Study, Executive Summary, Sep, 2014

Indian Springs
Hibsman & Associates, Indian Springs Improvement and Service District Level II Feasibility Study, Data Compilation, Water Transmission and Distribution System, Oct, 1991

Interstate Canal
Hansen, Allen, & Luce, Inc., Interstate Canal and Beaver Meadow Reservoir Rehabilitation Level I Study, Final Report, May, 2015
Hansen, Allen, & Luce, Inc., Interstate Canal and Beaver Meadow Reservoir Rehabilitation Level I Study, Executive Summary, May, 2015

Iron Creek
Harza, Level II Feasibility Study, Iron Creek Project Shoshone Irrigation District and Wyoming Water Development Commission, Aug, 1982
Harza, Interim Report to Shoshone and Heart Mountain Irrigation Districts and Wyoming Water Development Commission, Iron Creek Project Level II Feasibility Study, Dec, 1982

Jackson
Nelson Engineering, Jackson Water Feasibility Study, Oct, 1984
Nelson Engineering, Jackson Groundwater Exploration Program, Dec, 1993
Nelson Engineering, Final Report on Well 9 Groundwater Exploration Project for the Town of Jackson, Wyoming, Aug, 2022

James Town-Rio Vista
Keller Associates, Inc., James Town-Rio Vista Water District Water Supply Level II Study, Final Report, Feb, 2010
Keller Associates, Inc., James Town-Rio Vista Water District Water Supply Level II Study, Executive Summary, Feb, 2010

Jeffrey City
609 Consulting, LLC, Jeffrey City Water Supply Level II Feasibility Study, Final Report, Apr, 2013
609 Consulting, LLC, Jeffrey City Water Supply Level II Feasibility Study, Executive Summary, Apr, 2013

Jon's Drop
Dahlgren Consulting, Inc, Jon's Drop Hydropower Level II Study, Final Report, Oct, 2006
Dahlgren Consulting, Inc, Jon's Drop Hydropower Level II Study, Executive Summary, Oct, 2006

Kaycee
Western Water Consultants, Ground Water Feasibility Study for Kaycee, Jan, 1983
Western Water Consultants, Final Report on Drilling and Testing of the Town of Kaycee Madison #1 Test Well, Johnson County, Wyoming, Apr, 1984
Grizzly Engineering, Inc, Town of Kaycee Water Supply Master Plan Level I, Executive Summary, Oct, 1999
Grizzly Engineering, Inc, Town of Kaycee Water Supply Master Plan Level I, Oct, 1999
Weston Engineering, Inc., Town of Kaycee Well and Tank Storage Improvements Level II Study, Final Report, Oct, 2006
Weston Engineering, Inc., Town of Kaycee Well and Tank Storage Improvements Level II Study, Executive Summary, Oct, 2006

Kemmerer
MSM Consultants, Groundwater Availability Study Town of Kemmerer, Wyoming Plates, May, 1982
MSM Consultants, Town of Kemmerer, Wyoming Groundwater Availability Study Vicinity of Kemmerer, Wyoming, Jul, 1982
MSM Consultants, City of Kemmerer, Wyoming Water Supply Alternatives Level I Reconnaissance Study, Dec, 1982
Greenhorne & O'Mara, Inc., Kemmerer City Reservoir Rehabilitation Project Level II Feasibility Study, Executive Summary, Nov, 1986
Greenhorne & O'Mara, Inc., Kemmerer City Reservoir Rehabilitation Project Level II Feasibility Study, Nov, 1986
Forsgren Associates, Kemmerer-Diamondville Master Plan Level I Study, Final Report, Oct, 2009
Forsgren Associates, Kemmerer-Diamondville Master Plan Level I Study, Executive Summary, Oct, 2009
JFC Engineers/Surveyors, Kemmerer/Diamondville Joint Powers Water Board Level II, Final Report, Jan, 2012
JFC Engineers/Surveyors, Kemmerer/Diamondville Joint Powers Water Board Level II, Executive Summary, Jan, 2012

Kennington Springs
Keller Associates, Kennington Springs Pipeline Company Level I Water System Reconnaissance Study, Final Report, Nov, 2003
Keller Associates, Kennington Springs Pipeline Company Level I Water System Reconnaissance Study, Executive Summary, Nov, 2003

Keystone
Sage Civil Engineering, Keystone and Farmers Canal Master Plan Level I, Final Report, Dec, 2011
Sage Civil Engineering, Keystone and Farmers Canal Master Plan Level I, Executive Summary, Dec, 2011

Kirby
HDR Engineering, Inc., Kirby Dam and Reservoir Level I Reconnaissance Study, Jan, 1990
Sunrise Engineering, Kirby Creek Watershed Plan Level I Study, Final Report, Sep, 2005
Sunrise Engineering, Kirby Creek Watershed Plan Level I Study, Executive Summary, Sep, 2005
Anderson Consulting Engineers, Inc., Final Report for Kirby Area Water Supply Level I Study, Sep, 2005
Anderson Consulting Engineers, Inc., Executive Summary for Kirby Area Water Supply Level I Study, Sep, 2005
Engineering Associates, Level I Study Town of Kirby Water Supply Project, Final Report, Apr, 2006
Engineering Associates, Level I Study Town of Kirby Water Supply Project, Executive Summary, Apr, 2006
Anderson Consulting Engineers, Inc., Kirby Irrigation District Conservation Program Level II Study, Final Report, Aug, 2010
Anderson Consulting Engineers, Inc., Kirby Irrigation District Conservation Program Level II Study, Executive Summary, Aug, 2010
PBS&J, Kirby Creek Watershed Level I Study, Final Report, Sep, 2010
PBS&J, Kirby Creek Watershed Level I Study, Executive Summary, Sep, 2010
Sage Civil Engineering, Kirby Ditch Rehabilitation Level II Study, Final Report, Oct, 2018
Sage Civil Engineering, Kirby Ditch Rehabilitation Level II Study, Executive Summary, Oct, 2018

La Barge
Rendezvous Engineering, PC, La Barge Water Supply Study Level II, Final Report, Jan, 2012
Rendezvous Engineering, PC, La Barge Water Supply Study Level II, Executive Summary, Jan, 2012

LaGrange
AVI Professional Corporation, LaGrange Water Master Plan, Level I Study, Final Report, Oct, 2021
AVI Professional Corporation, LaGrange Water Master Plan, Level I Study, Executive Summary, Oct, 2021

Lake Adelaide-Shell Valley
ESA Geotechnical Consultants, Shell Valley Watershed Level III, Phase 1, Interim Report on Conceptual Design, Lake Adelaide Enlargement, Executive Summary (see Shell), Jan, 1986
ESA Geotechnical Consultants, Shell Valley Watershed Level III, Phase 1, Interim Report on Conceptual Design, Lake Adelaide Enlargement (see Shell), Jan, 1986
ESA Geotechnical Consultants, Shell Valley Watershed Level III, Phase II, Lake Adelaide Enlargement, Executive Summary (see Shell), Dec, 1986

Lake DeSmet
Texaco, Handout for Wyoming Water Development Commission Regarding the Lake DeSmet Project, Oct, 1982
Texaco, The Lake DeSmet Project, Jul, 1989
HKM Engineering, Lake DeSmet Level II Master Plan and Reservoir Rehabilitation Plan, Final Report, Dec, 2003
HKM Engineering, Lake DeSmet Level II Master Plan and Reservoir Rehabilitation Plan, Executive Summary, Dec, 2003
Lake Engineering Consultants, Inc, Lake DeSmet Level II Master Plan and Reservoir Rehabilitation Plan Phase 2, Final Report, Nov, 2004
Lake Engineering Consultants, Inc, Lake DeSmet Level II Master Plan and Reservoir Rehabilitation Plan Phase 2, Executive Summary, Nov, 2004
Engineering Associates, Lake DeSmet/Healy Reservoir Utilization Level II Study, Final Report, Apr, 2022
Engineering Associates, Lake DeSmet/Healy Reservoir Utilization Level II Study, Executive Summary, Apr, 2022

Lake Hattie
Western Water Consultants, Lake Hattie Rehabilitation Project Level II, Final Report, Mar, 1986
Western Water Consultants, Feasibility Report for the Formation of the Lake Hattie Irrigation District, Dec, 1986
Western Water Consultants, Lake Hattie Rehabilitation Project Level II, Phase II, Preliminary Designs and Report, Oct, 1987
Western Water Consultants, Lake Hattie Outlet Works Level II Study, Final Report, Nov, 2003
Western Water Consultants, Lake Hattie Outlet Works Level II Study, Executive Summary, Nov, 2003

Lakeview-Casper
JFC Engineers/Surveyors, Final Report for Lakeview Water Supply Project Level II, Nov, 1998
JFC Engineers/Surveyors, Executive Summary for Lakeview Water Supply Project Level II, Nov, 1998
JFC Engineers/Surveyors, Addendum to: Final Report for Lakeview Water Supply Project Level II, Dec, 1998

Lakeview-Cody
JM Montgomery, Consulting Engineers, Lakeview Irrigation District Consumptive Use and Irrigation Demand at Cody, Wyoming, Apr, 1985
JM Montgomery, Consulting Engineers, Lakeview Irrigation District Value of Production with a Normal and Inadequate Water Supply at Cody, Wyoming , Jun, 1985
Sage Civil Engineering, Lakeview Irrigation Master Plan Level II Study, Final Report , Nov, 2013

Lance Creek
Western Water Consultants, Lance Creek Water Supply Master Plan Level I, Executive Summary, Nov, 1996
Western Water Consultants, Lance Creek Water Supply Master Plan Level I, Nov, 1996
WWC Engineering, Lance Creek Water Supply Study Level I, Final Report, Jun, 2011
WWC Engineering, Lance Creek Water Supply Study Level I, Executive Summary, Jun, 2011
Wyoming Groundwater, LLC, Lance Creek Well Level II Study, Final Report, Apr, 2013
Wyoming Groundwater, LLC, Lance Creek Well Level II Study, Executive Summary, Apr, 2013
Wyoming Groundwater, LLC, Lance Creek Well Level II Study, Appendices, Apr, 2013

Lander
ARIX Corporation, Lander Rehabilitation Project Level II Feasibility Study, Phase I, Flood Routing and Incremental Damage Analysis, Executive Summary, Nov, 1987
ARIX Corporation, Lander Rehabilitation Project Level II Feasibility Study, Phase I, Flood Routing and Incremental Damage Analysis, Nov, 1987
ARIX Corporation, Lander Rehabilitation Project Level II Feasibility Study, Phase II, Geotechnical Investigation and Rehabilitation Plan, Appendix III, Geotechnical Data and Analysis, Dec, 1988
ARIX Corporation, Lander Rehabilitation Project Level II Feasibility Study, Phase II, Executive Summary, Dec, 1988
ARIX Corporation, Lander Rehabilitation Project Level II Feasibility Study, Phase II, Dec, 1988
JFC Engineers/Surveyors, Lander Water Supply Master Plan Level I Report, Appendix, Jan, 1996
JFC Engineers/Surveyors, Lander Water Supply Master Plan Level I Report, Jan, 1996
Nelson Engineering, Lander Water Supply Project Level II, Phase II Report, Executive Summary, Jul, 1998
Nelson Engineering, Lander Water Supply Project Level II, Phase II Report, Jul, 1998
GEI Consultants, City of Lander Taylor Ditch Rehabilitation Project Level II Feasibility Study, Phase II Report, Nov, 1998
Nelson Engineering, Lander Water Supply Project Level II, Phase III, Final Report, Dec, 1999
Nelson Engineering, Lander Water Supply Project Level II, Phase III Final Report, Executive Summary, Dec, 1999
Weston Engineering, Inc., Lander Level II Paleozoic Aquifer Well Siting Study, Final Report, Nov, 2002
Weston Engineering, Inc., Lander Level II Paleozoic Aquifer Well Siting Study, Executive Summary, Nov, 2002
Weston Engineering, Inc., Lander Level II Water Supply Project, Final Report, Aug, 2004
Weston Engineering, Inc., Lander Level II Water Supply Project, Executive Summary, Aug, 2004
Weston Engineering, Inc., Lander Level II Water Supply Project, Exploration Well Deepening, Final Report, Oct, 2007
Weston Engineering, Inc., Lander Level II Water Supply Project, Exploration Well Deepening, Executive Summary, Oct, 2007
Wyoming Groundwater and Hinckley Consulting, Lander Test Well Level II Study, Groundwater Development Alternatives and Evaluation of the Alluvial Aquifer as a Municipal Water Supply, Final Report, Volume I, Oct, 2020
Wyoming Groundwater and Hinckley Consulting, Final Report, Volume II, Supplemental Investigations, Field Data, and Permits Lander Test Well Level II Study, Oct, 2021
Wyoming Groundwater and Hinckley Consulting, Lander Test Well Level II Study, Executive Summary, Oct, 2021
TriHydro Corporation, Lander Master Plan Level I Study, Final Report, Oct, 2011
TriHydro Corporation, Lander Master Plan Level I Study, Executive Summary, Oct, 2011
HDR Engineering, Inc., City of Lander 2022 Water Master Plan Level I Study, Final Report, Aug, 2023
HDR Engineering, Inc., City of Lander Master Plan Level I Study, Executive Summary, Aug, 2023

LaPrele
Nelson Engineering, LaPrele Irrigation Project: Section I, Soils and Drainage, Section II, Seepage and Water Loss Study, Section III, Hydrologic Study, Sep, 1973
Nelson Engineering, LaPrele Level III Development Plan, Interim Report, Nov, 1982
James Jacobs, Priority Improvements of the LaPrele Irrigation Project: Estimates of Increased Returns to Irrigators, Nov, 1983
RESPEC, LaPrele Irrigation District Master Plan Level I Study, Final Report, Oct, 2018
RESPEC, LaPrele Irrigation District Master Plan Level I Study, Executive Summary, Oct, 2018

Laramie
Snowy Range Water Consultants, Inc, South Laramie Water Supply Study Level I, Final Report, Nov, 1991
Snowy Range Water Consultants, Inc, South Laramie Water Supply Study Level I, Executive Summary, Nov, 1991
Jack Noblitt & Associates, Laramie Regional Airport Water System Improvements Level II, Executive Summary, Dec, 1993
Jack Noblitt & Associates, Laramie Regional Airport Water System Improvements Level II Feasibility Study, Dec, 1993
Western Water Consultants, City of Laramie Water Supply Master Plan Level I, Final Interim Report, Dec, 1993
Western Water Consultants, City of Laramie Water Supply Master Plan Level I, Phase II, Volume 2, Appendices, Nov, 1994
Western Water Consultants, City of Laramie Water Supply Master Plan, Executive Summary, Jan, 1995
Western Water Consultants, City of Laramie Water Supply Master Plan Level I, Jan, 1995
Kennedy Engineering, Task 'A' Laramie River Diversion Dam Evaluation and Rehabilitation Plan, Final Report, Jan, 1996
Kennedy Engineering, Task 'A' Laramie River Diversion Dam Evaluation and Rehabilitation Plan, Executive Summary, Jan, 1996
RBD, Inc, City of Laramie Water Supply Master Plan Level II, Technical Appendixes, Volume II, Jun, 1996
RBD, Inc, City of Laramie Water Supply Master Plan Level II, Technical Appendixes, Volume I, Jun, 1996
RBD, Inc, City of Laramie Water Supply Master Plan Level II, Final Report, Jun, 1996
RBD, Inc, City of Laramie Water Supply Master Plan Level II, Executive Summary, Jun, 1996
Banner Associates, Inc, Laramie West Water Supply Project Level II, Executive Summary, Nov, 1998
Banner Associates, Inc, Laramie West Water Supply Project Level II, Nov, 1998
Western Water Consultants, Laramie North Side Supply Project Level II, Executive Summary, Nov, 2000
Western Water Consultants, Laramie North Side Supply Project Level II, Nov, 2000
WWC Engineering, Laramie Water Management Plan Level II, Volume II of II, Appendices, Aug, 2006
WWC Engineering, Laramie Water Management Plan Level II, Volume I of II, Aug, 2006
WWC Engineering, Laramie Water Management Plan Level II, Executive Summary, Aug, 2006
Tetra Tech, Laramie Water Management Phase II Level II Water System Report, Final Report, May, 2010
Tetra Tech, Laramie Water Management Phase II Level II Water System Report, Executive Summary, May, 2010
Jehn Water Consultants, Inc., Laramie Water Management Study Level II Phase II, Final Report, Nov, 2010
Jehn Water Consultants, Inc., Laramie Water Management Study Level II Phase II, Executive Summary, Nov, 2010
WWC Engineering, 2015 Laramie Water Master Plan Level I, Volume II of II, Appendices, Dec, 2015
WWC Engineering, 2015 Laramie Water Master Plan Level I, Volume I of II, Report, Dec, 2015
WWC Engineering, 2015 Laramie Water Master Plan Level I, Executive Summary, Dec, 2015
Wyoming Groundwater, LLC, UW Irrigation Water Supply Level II Study, Executive Summary, Feb, 2018
Wyoming Groundwater, LLC, UW Irrigation Water Supply Level II Study, Final Report, Feb, 2018

Laramie County
Western Water Consultants, Ground Water Development Potential of the Paleozoic Aquifer Along the Flanks of the Laramie Range and Hartville Uplift, Dec, 1982
JR Engineering, Water Resource Atlas of Laramie County Wyoming, Aug, 2008
JR Engineering, Laramie County Aquifer Study, Final Report, Feb, 2009
JR Engineering, Laramie County Aquifer Study, Executive Summary, Feb, 2009

LeClair
Crank Companies, Inc., LeClair Irrigation Rehabilitation Project Level II, Final Report, Dec, 1988
Crank Companies, Inc., LeClair Irrigation Rehabilitation Project Level II, Executive Summary, Dec, 1988
Nelson Engineering, Wind River Study, Riverton Valley Rehabilitation (Wyoming No. 2 Canal) Level I, Phase I, Final Report, Jan, 1992
Nelson Engineering, Wind River Study, LeClair Canal Rehabilitation Level I, Phase I, Final Report, Jan, 1992
Nelson Engineering, Wind River Study, LeClair Canal and Riverton Valley (Wyoming No. 2 Canal) Rehabilitation Level I, Phase III, Final Report, Mar, 1993
Nelson Engineering, Wind River Study, LeClair Canal and Riverton Valley (Wyoming No. 2 Canal) Rehabilitation Level I, Phase III, Executive Summary, Mar, 1993
Apex Surveying, Inc, LeClair Laterals Rehabilitation No. 2, Level II Feasibility, Nov, 2002
Apex Surveying, Inc, LeClair Irrigation District Laterals Rehabilitation Level II Summary, Nov, 2002
States West Water Resources Corporation, LeClair/Riverton Valley Irrigation Storage Project Level II Study, Final Report, Oct, 2006
States West Water Resources Corporation, LeClair/Riverton Valley Irrigation Storage Project Level II Study, Executive Summary, Oct, 2006
HDR Engineering, Inc., LeClair Irrigation District Level I System Master Plan, Final Report, Oct, 2016
HDR Engineering, Inc., LeClair Irrigation District Level I System Master Plan, Executive Summary, Oct, 2016

Leiter Ditch
AVI Professional Corporation, Leiter Ditch Rehabilitation Level II Study, Final Report, Sep, 2015

Lingle
Benchmark of Torrington, Town of Lingle Water Supply Master Plan Level I Project, Final Report, Nov, 1998
Benchmark of Torrington, Town of Lingle Water Supply Master Plan Level I Project, Executive Summary, Nov, 1998

Little Big Horn
Wyoming Water Development Commission, Report to the Governor, Little Big Horn Project, Sep, 1981
Wyoming Water Development Commission, Agreement between the State of Wyoming Water Development Commission and the Sheridan-Little Horn Water Group Regarding the Development of the Little Big Horn River, Jan, 1982

Little Goose
Howard Needles Tammen & Bergendoff, Little Goose Domestic Water Supply Project, Volume II, Supplemental Groundwater Information, Jan, 1987
Howard Needles Tammen & Bergendoff, Little Goose Domestic Water Supply Project, Volume I, Report of Findings, Jan, 1987
Howard Needles Tammen & Bergendoff, Little Goose Domestic Water Supply Project, Executive Summary, Jan, 1987

Little Snake
Wyoming Water Development Commission, Report to the Legislature Cheyenne Project & Little Snake River Water Management Preliminary, Jan, 1980
Wyoming Game & Fish Department, Quantification of Trout Habitat that could be Impacted by Stage III of the Little Snake River Water Management Project, Oct, 1980
Banner Associates, Inc, Little Snake River Water Management Project Substantiating Report, Nov, 1980
Banner Associates, Inc, Little Snake River Water Management Project Feasibility Study, Nov, 1980
Wyoming Water Development Commission, Report to the Wyoming Legislature and Governor, Little Snake River Water Management Project, Jan, 1981
Wyoming Water Development Commission, Little Snake River Water Management Project, Examination of Alternatives Preliminary Report, Oct, 1981
Wyoming Water Development Commission, Little Snake River Water Management Project Status Report, Jan, 1982
Stone and Webster Engineering, Little Snake River Water Management Project, Technical Summary Report, Nov, 1984
Stone and Webster Engineering, Little Snake River Water Management Project, Executive Summary, Nov, 1984
Wyoming Game & Fish Department, Little Snake River Water Management Project Level III Interim Wildlife Impact Report Reservoir Options, Dec, 1984
Wyoming Game & Fish Department, Little Snake River Water Management Project Level III Interim Wildlife Impact Report The Collector System, Dec, 1985
Wyoming Game & Fish Department, Little Snake River Water Management Project Level III Interim Wildlife Impact Report Sandstone Reservoir, Dec, 1985
Western Water Consultants, Final Report on Little Snake River Depletions by Pot Hook, Three Forks and Powder Wash Rights, Jul, 1990
Resource Consultants, Sediment Transport Studies of the Little Snake, Yampa, and Green River Systems, Aug, 1991
Western Water Consultants, Little Snake River Basin Planning Study, Volume I, Final Report, Evaluation of the Baggs Water Supply, Treatment and Delivery System, Oct, 1992
Western Water Consultants, Little Snake River Basin Planning Study, Volume I, Executive Summary, Evaluation of the Baggs Water Supply, Treatment and Delivery System, Oct, 1992
Western Water Consultants, Little Snake River Basin Planning Study, Volume II, Final Report, Evaluation of Irrigation Diversion Dams and Principal Water Supply Ditches, Part B, Principal Ditches, Nov, 1992
Western Water Consultants, Little Snake River Basin Planning Study, Volume II, Final Report, Evaluation of Irrigation Diversion Dams and Principal Water Supply Ditches, Part A, Diversion Dams, Nov, 1992
Western Water Consultants, Little Snake River Basin Planning Study, Volume II, Executive Summary, Evaluation of Irrigation Diversion Dams and Principal Water Supply Ditches, Part B, Principal Ditches, Nov, 1992
Western Water Consultants, Little Snake River Basin Planning Study, Volume II, Executive Summary, Evaluation of Irrigation Diversion Dams and Principal Water Supply Ditches, Part A, Diversion Dams, Nov, 1992
Western Water Consultants, Little Snake River Basin Planning Study, Volume III, Final Report, Irrigation Reservoir Investigations, Dec, 1992
Western Water Consultants, Little Snake River Basin Planning Study, Volume III, Executive Summary, Irrigation Reservoir Investigations, Dec, 1992
Lidstone and Anderson, Little Snake River Basin Small Reservoir Development Project Level II, Final Report, Oct, 1998
Lidstone and Anderson, Little Snake River Basin Small Reservoir Development Project Level II, Executive Summary, Dec, 1998
Burns & McDonnell, Final Environmental Impact Statement, Little Snake Supplemental Irrigation Water Supply, Carbon County, Wyoming, Appendices, Jan, 1999
Burns & McDonnell, Final Environmental Impact Statement, Little Snake Supplemental Irrigation Water Supply, Carbon County, Wyoming, Jan, 1999
Gannett Fleming, Little Snake River Dams Level II Studies, Final Report, Jul, 2003
Gannett Fleming, Little Snake River Dams Level II Studies, Executive Summary, Jul, 2003
Aqua Engineering, Inc., Little Snake Canals Level II Study, Final Report, Dec, 2012
Aqua Engineering, Inc., Little Snake Canals Level II Study, Executive Summary, May, 2012
Aqua Engineering, Inc., Little Snake Canals Level II, Appendix A-G, May, 2012
Aqua Engineering, Inc., Little Snake Canals Level II, Appendix H-O, May, 2012
Aqua Engineering, Inc., Little Snake Canals Level II, Appendix P-Q, May, 2012
Aqua Engineering, Inc., Little Snake Canals Level II, Appendix R-BB, May, 2012
States West Water Resources Corporation, Little Snake River Supplemental Storage Level II Study, Final Report, Dec, 2012
States West Water Resources Corporation, Little Snake River Supplemental Storage Level II Study, Executive Summary, Dec, 2012
States West Water Resources Corporation, Little Snake River Supplemental Storage Level II Study, Appendices, Dec, 2012
Anderson Consulting Engineers, Inc., Little Snake River/Vermillion Creek Watershed Study Level I, Final Report, Sep, 2013
Anderson Consulting Engineers, Inc., Little Snake River/Vermillion Creek Watershed Study Level I, Executive Summary, Sep, 2013
Wenck Associates, Inc., Little Snake Storage Level II Phase II, Final Report, Oct, 2017
Wenck Associates, Inc., Little Snake Storage Level II Phase II, Executive Summary, Oct, 2017
Wenck Associates, Inc., Little Snake River Valley Municipal Water Supply, Final Report, Feb, 2020
Wenck Associates, Inc., Little Snake River Valley Municipal Water Supply, Executive Summary, Feb, 2020
Stantec, Little Snake River Valley Water Supply, Phase II Level II Study, Final Report, Sep, 2023
Stantec, Little Snake River Valley Water Supply, Phase II Level II Study, Executive Summary, Sep, 2023

Lodgepole Aquifer
Dahlgren Consulting, Inc, Lodgepole Aquifer Storage and Retrieval Level I Study, Final Report, Nov, 2001
Dahlgren Consulting, Inc, Lodgepole Aquifer Storage and Retrieval Level I Study, Executive Summary, Nov, 2001

Lovell
A & H Consulting, Inc., Lovell Irrigation District Hydropower Study Level II, Executive Summary, May, 2003
A & H Consulting, Inc., Lovell Irrigation District Hydropower Study Level II, May, 2003
DOWL HKM, Lovell Water Master Plan Level I Study, Environmental Report to Accompany, Oct, 2013
DOWL HKM, Lovell Level I Water Master Plan, Final Report, Oct, 2013
DOWL HKM, Lovell Level I Water Master Plan, Executive Summary, Oct, 2013
Sage Civil Engineering, Lovell Irrigation District Master Plan Level I Study, Final Report, Aug, 2017
Sage Civil Engineering, Lovell Irrigation District Master Plan Level I Study, Executive Summary, Aug, 2017

Lower Laramie River Watershed
Anderson Consulting Engineers, Inc., Lower Laramie River Watershed Level I Study, Final Report, Nov, 2019
Anderson Consulting Engineers, Inc., Lower Laramie River Watershed Level I Study, Executive Summary, Nov, 2019

Lucerne
DOWL HKM, Lucerne Water Supply Level II Study, Final Report, Oct, 2011
DOWL HKM, Lucerne Water Supply Level II Study, Executive Summary, Oct, 2011

Lusk
Worthington, Lenhart, Carpenter, Inc, Town of Lusk Water Project Level I Master Plan Study, Final Report, Nov, 1994
Worthington, Lenhart, Carpenter, Inc, Executive Summary of Level I Master Plan Study of Town of Lusk's Water Supply System, Dec, 1994
MK Centennial, Lusk Water Supply Project Level II Lusk, Wyoming, Final Report, Nov, 1995
MK Centennial, Lusk Water Supply Project Level II Lusk, Wyoming, Executive Summary, Nov, 1995
TriHydro Corporation, Well Construction and Aquifer Testing Level II Water Supply Project, Lusk, Wyoming Final Report, Jan, 1996
Hinckley Consulting, Lusk Area Groundwater Level I Study, Final Report, Jul, 2009
Hinckley Consulting, Lusk Area Groundwater Level I Study, Executive Summary, Jul, 2009
AVI Professional Corporation, Lusk Master Plan Level I Study, Final Report, Sep, 2014
AVI Professional Corporation, Lusk Master Plan Level I Study, Executive Summary, Sep, 2014
AVI Professional Corporation, Lusk Water Supply Level II Study, Final Report, Jul, 2018
AVI Professional Corporation, Lusk Water Supply Level II Study, Executive Summary, Jul, 2018

Lysite
Stetson Engineering, Inc, Final Report for Lysite Water Supply Level I Study, Feb, 2006
Stetson Engineering, Inc, Executive Summary for Lysite Water Supply Level I Study, Feb, 2006
Stetson Engineering, Inc, Final Report for Lysite Water Supply Level II Study, Feb, 2008
Stetson Engineering, Inc, Executive Summary for Lysite Water Supply Level II Study, Feb, 2008

Manderson
Buell Winter Mousel and Associates, Feasibility Study for Water Well Supply, Town of Manderson, May, 1982
Buell Winter Mousel and Associates, Exploratory Drilling Program Report for Manderson, Wyoming, Feb, 1983
Western Water Consultants, Groundwater Feasibility for the Town of Manderson, May, 1983
Western Water Consultants, Final Report on Drilling and Testing Town of Manderson Well #3, Feb, 1984
Graham, Dietz & Associates, Manderson Level II Water Supply Study, Final Report, Nov, 1994
Graham, Dietz & Associates, Manderson Level II Water Supply Study, Executive Summary, Nov, 1994
Graham, Dietz & Associates, Manderson Level II Water Supply Study, Appendix, Nov, 1994
Woodard & Curran, Manderson Water Master Plan Level I Study, Final Report, Sep, 2017
Woodard & Curran, Manderson Water Master Plan Level I Study, Executive Summay, Sep, 2017

Manville
Western Water Consultants, Final Report on the Manville Water Supply Project Level II, Volume II, Jun, 1997
Western Water Consultants, Final Report on the Manville Water Supply Project Level II, Volume I, Jun, 1997
Western Water Consultants, Executive Summary for the Manville Water Supply Project Level II, Jun, 1997
Olsson Associates, Manville Source Water Supply Study Level II Study, Final Report, Sep, 2008
Olsson Associates, Manville Source Water Supply Study Level II Study, Executive Summary, Sep, 2008
Wyoming Groundwater, LLC, Manville Well Level II Study, Final Report, Dec, 2014
Wyoming Groundwater, LLC, Manville Well Level II Study, Executive Summary, Dec, 2014

Marbleton
JFC Engineers/Surveyors, Marbleton Municipal Water Well Number Six, Final Report of Drilling, Development and Testing, Jan, 2002
JFC Engineers/Surveyors, Marbleton Municipal Water Well Number Six, Executive Summary of Drilling, Development and Testing, Jan, 2002

McNutt
BRS Inc, McNutt Water Supply Project Level II, Final Report, Nov, 1998
BRS Inc, McNutt Water Supply Project Level II, Executive Summary, Nov, 1998

Meade
EnTech, Inc, Meade Creek Ditch Rehabilitation Level II Study, Final Report, Jun, 2005
EnTech, Inc, Meade Creek Ditch Rehabilitation Level II Study, Executive Summary, Jun, 2005

Medicine Bow
No Author, Municipal Water Supply Source Problems, Town of Medicine Bow, Wyoming, Jan, 1983
Banner Associates, Inc, Feasibility Study for Groundwater Development for the Town of Medicine Bow, Jun, 1983
Banner Associates, Inc, Construction and Testing of the Como #4 Well, Oct, 1984
RESPEC, Medicine Bow River Watershed Study, Watershed Management Plan, Final Report, Feb, 2016
RESPEC, Medicine Bow River Watershed Study, Watershed Management Plan, Executive Summary, Feb, 2016

Meeks Cabin
TriHydro Corporation, Meeks Cabin Dam Enlargement Level II Study, Phase I, Executive Summary, Jun, 2017
TriHydro Corporation, Meeks Cabin Dam Enlargement Level II Study, Phase I Final Summary Report, Jun, 2017

Meeteetse
James Gores and Associates, P.C., Meeteetse Regional Water Supply Master Plan Level I, Final Report, Oct, 1995
James Gores and Associates, P.C., Meeteetse Regional Water Supply Master Plan Level I, Executive Summary, Oct, 1995
Sear-Brown Group, Meeteetse Water Supply Project Level II, Final Report, Nov, 1997
Sear-Brown Group, Meeteetse Water Supply Project Level II, Executive Summary, Nov, 1997
James Gores and Associates, P.C., Meeteetse Master Plan Level I Study, Final Report, Aug, 2015
James Gores and Associates, P.C., Meeteetse Master Plan Level I Study, Executive Summary, Aug, 2015

Melody Ranch
Nelson Engineering, Melody Ranch ISD Level I Study, Final Report, Oct, 2017
Nelson Engineering, Melody Ranch ISD Level I Study, Executive Summary, Oct, 2017
Rendezvous Engineering, PC, Melody Ranch Groundwater Exploration Study Report, WWDC Groundwater Grant, Sep, 2022

Middle Big Horn
Y2 Consultants, Middle Big Horn Watershed Study, Level I Study, Report, Jan, 2021
Y2 Consultants, Middle Big Horn Watershed Study, Level I Study, Potential Project Overview, Jan, 2021

Middle Fork Powder River
Wright Water Engineers, Inc., Middle Fork Rural Water District Domestic Water System Level I, Reconnaissance Study, Nov, 1984
Wright Water Engineers, Inc., Middle Fork Rural Water District Domestic Water System Level I, Executive Summary, Nov, 1984
Harza, Middle Fork Powder River Dam and Reservoir Project, Interim Report, Main Report and Appendices, Jan, 1985
TriHydro Corporation, Level II Exploratory Drilling Program for the Middle Fork Rural Water District, Nov, 1985
Wyoming Water Development Commission, Synopsis Report Middle Fork Powder River Dam and Reservoir Project, Jan, 1986
Harza, Middle Fork Powder River Dam and Reservoir Project, Conceptual Design Report, Volume IV, Appendices E-G, Jan, 1986
Harza, Middle Fork Powder River Dam and Reservoir Project, Conceptual Design Report, Volume III, Appendix D, Jan, 1986
Harza, Middle Fork Powder River Dam and Reservoir Project, Conceptual Design Report, Volume II, Appendices A-C, Jan, 1986
Harza, Middle Fork Powder River Dam and Reservoir Project, Conceptual Design Report, Volume I, Main Report, Jan, 1986
Harza, Middle Fork Powder River Dam and Reservoir Project, Conceptual Design Report, Executive Summary, Jan, 1986
Harza, Middle Fork Powder River Dam and Reservoir Project, Interim Report, Executive Summary, Jan, 1985

Middle Piney
States West Water Resources Corporation, Middle Piney Reservoir Level II Study, Final Report, Jan, 2009
States West Water Resources Corporation, Middle Piney Reservoir Level II Study, Executive Summary, Jan, 2009
Wenck Associates, Inc., Middle Piney Reservoir Level II, Phase II Study, Final Report, Nov, 2015
Wenck Associates, Inc., Middle Piney Reservoir Level II, Phase II Study, Executive Summary, Nov, 2015
Wenck Associates, Inc., Middle Piney Reservoir Level II, Phase II Study, Appendices, Nov, 2015
US Forest Service, Middle Piney Dam and Road Reconstruction Project, Final Environmental Assessment and Finding of No Significant Impacts, Jul, 2016

Midvale
Anderson Consulting Engineers, Inc., Midvale Conservation Program Level II Final Report, Jun, 2007
Anderson Consulting Engineers, Inc., Midvale Conservation Program Level II Executive Summary, Jun, 2007
Wenck Associates, Inc., Midvale Irrigation District Hydropower Level II Study, Final Report, Jun, 2016
Wenck Associates, Inc., Midvale Irrigation District Hydropower Level II Study, Executive Summary, Jun, 2016

Mile-Hi
609 Consulting, LLC, Mile-Hi Water Supply Level II Study, Final Report, Jun, 2009
609 Consulting, LLC, Mile-Hi Water Supply Level II Study, Executive Summary, Jun, 2009

Moorcroft
Weston Engineering, Inc., Moorcroft Water Study Level I, Executive Summary, Oct, 1991
Weston Engineering, Inc., Moorcroft Water Study Level I, Oct, 1991
Weston Engineering, Inc., Moorcroft Water Study Level I, Executive Summary, Apr, 1992
Weston Engineering, Inc., Moorcroft Water Study Level I, Apr, 1992
Bearlodge Ltd, Inc., Moorcroft Water Supply Level II, Final Report, Jan, 1994
Bearlodge Ltd, Inc., Moorcroft Water Supply Level II, Executive Summary, Jan, 1994
Weston Engineering, Inc., Moorcroft Level II Water Supply Study, Final Report, Oct, 2002
Weston Engineering, Inc., Moorcroft Level II Water Supply Study, Executive Summary, Oct, 2002
HDR Engineering, Inc., Town of Moorcroft Master Plan Level I Study, Final Report, Sep, 2015
HDR Engineering, Inc., Town of Moorcroft Master Plan Level I Study, Executive Summary, Sep, 2015

Natrona
James M. Montgomery, Consulting Engineers, Natrona County Regional Water System Project Level I, Executive Summary, May, 1990
James M. Montgomery, Consulting Engineers, Natrona County Regional Water System Project Level I, May, 1990
Civil Engineering Professionals, Inc., Natrona County Regional Water Supply Project Level II Feasibility Study, Final Report, Nov, 1994
Civil Engineering Professionals, Inc., Natrona County Regional Water Supply Project Level II Feasibility Study, Executive Summary, Nov, 1994
Civil Engineering Professionals, Inc., Natrona County Regional Water Supply Project Level II Feasibility Study, Final Report, Amendment No. 1, Apr, 1995

Natural Bridge Well
ARIX Corporation, Hydrogeologic Evaluation of the Natural Bridge Well, Converse County, Wyoming, Jan, 1987

New Fork Lake
RJH Consultants, Inc., New Fork Lake Dam Enlargement, Level II, Phase I Study, Final Report, Apr, 2017
RJH Consultants, Inc., New Fork Lake Dam Enlargement, Level II, Phase I Study, Executive Summary, Apr, 2017
RJH Consultants, Inc., New Fork Lake Dam Enlargement, Level II, Phase II Study, Final Report, Jan, 2023
RJH Consultants, Inc., New Fork Lake Dam Enlargement, Level II, Phase II Study, Executive Summary, Jan, 2023

New Fork River
Tetra Tech, New Fork River Watershed Level I Study, Final Report, Apr, 2018
Tetra Tech, New Fork River Watershed Level I Study, Executive Summary, Apr, 2018

Newcastle
RCH and Associates, Level I Water Supply Project, Salt Creek Water District, Newcastle, Wyoming, Final Report, Dec, 1996
RCH and Associates, Level I Water Supply Project, Salt Creek Water District, Newcastle, Wyoming, Executive Summary, Dec, 1996
Wester Wetstein & Associates, Newcastle Area Water Supply Master Plan Level II, Volume 2, Apr, 2000
Wester Wetstein & Associates, Newcastle Area Water Supply Master Plan Level II, Volume 1, Apr, 2000
Wester Wetstein & Associates, Newcastle Area Water Supply Master Plan Level II, Executive Summary, Apr, 2000
Stetson Engineering, Inc, Final Level II Study Report for Canyon Improvement and Service District, Newcastle, Wyoming, Includes Canyon No. 1 Test Well Construction Report, Oct, 2005
Stetson Engineering, Inc, Final Report Attachments, Canyon Improvement & Service District Level II Study, Nov, 2005
Stetson Engineering, Inc, Executive Summary for Canyon Improvement and Service District, Level II Water Supply Study, Nov, 2005
Wester Wetstein & Associates, Newcastle Madison Well Level II Project, Final Report, Oct, 2017
Wester Wetstein & Associates, Newcastle Madison Well Level II Project, Executive Summary, Oct, 2017

Nine Mile
Coffey & Associates, Nine Mile Water Supply Project Level I, Final Report, Nov, 1998
Coffey & Associates, Nine Mile Water Supply Project Level I, Executive Summary, Nov, 1998
Western Water Consultants, Report of the Level II Study for the Nine Mile Water and Sewer District, Nov, 1999
Western Water Consultants, Executive Summary of the Level II Study for the Nine Mile Water and Sewer District, Nov, 1999

Niobrara
RESPEC, Niobrara-Lower North Platte Rivers Watershed Study Level I Watershed Management Plan, Final Report, Apr, 2019
RESPEC, Niobrara-Lower North Platte Rivers Watershed Study Level I Watershed Management Plan, Executive Summary, Apr, 2019

Nordic Ranches
Forsgren Associates, Nordic Ranches Water Master Plan, Level I Final Report, Aug, 2022
Forsgren Associates, Nordic Ranches Water Master Plan, Level I Executive Summary, Aug, 2022

North Alpine
Rendezvous Engineering, PC, Final Report for Level II North Alpine Water Supply Study, Nov, 2002
Rendezvous Engineering, PC, Executive Summary for Level II North Alpine Water Supply Study, Nov, 2002

North Canal
Aqua Engineering, Inc., North Canal Master Plan Level I, Final Report, Nov, 2003
Aqua Engineering, Inc., North Canal Master Plan Level I, Executive Summary, Nov, 2003

North End
Weston Engineering, Inc., Northend Water Users, Wellhead Protection Plan, Jan, 1999
Sunrise Engineering, North End Water Users Study Level I Study, Executive Summary, May, 1999
Sunrise Engineering, North End Water Users Study Level I Study, May, 1999

North Platte
Black & Veatch, Water Supply Needs Assessment for the North Platte and Little Snake River Drainages Phase I, Volume 2, Appendices, Jul, 1983
Black & Veatch, Water Supply Needs Assessment for the North Platte and Little Snake River Drainages Phase I, Volume 1, Text, Jul, 1983
Black & Veatch, Water Supply Needs Assessment for the North Platte and Little Snake River Drainages Phase II, Nov, 1984
Black & Veatch, Water Supply Needs Assessment for the North Platte and Little Snake River Drainages Phase II, Including Municipal and Agricultural Ability to Pay Analyses, Executive Summary, Dec, 1984
Black & Veatch, Municipal Ability to Pay Analysis and Agricultural Ability to Pay Analysis for the North Platte and Little Snake River Drainages, Dec, 1984
TriHydro Corporation, Task 7 Groundwater Exploration Programs Split Rock and Shirley Mountains Groundwater Prospects North Platte River Groundwater Assessment Study Project Report, Jun, 2004
TriHydro Corporation, Environmental Report Casper Pipeline Feasibility Study, Split Rock Groundwater Development Project, Jun, 2006
TriHydro Corporation, Task 7 Groundwater Exploration Programs Split Rock and Shirley Mountains Groundwater Prospects North Platte River Groundwater Assessment Study Project Report, Executive Summary, Feb, 2007
TriHydro Corporation, Project Report Task 1 Through Task 6 North Platte River Groundwater Assessment Study Southeastern Wyoming, Apr, 2007
TriHydro Corporation, Executive Summary Task 1 Through Task 6 North Platte River Groundwater Assessment Study Southeastern Wyoming, Apr, 2007
TriHydro Corporation, Project Report Split Rock Groundwater Development Project Phase IV Feasibility Study for Pumping Stations and Pipeline to Casper, Jul, 2007
TriHydro Corporation, Project Report Well Construction and Testing Split Rock Groundwater Development Project , May, 2008
TriHydro Corporation, Hydrologic Connection Report Split Rock Groundwater Development Project, May, 2008
TriHydro Corporation, Executive Summary Well Construction and Testing Split Rock Groundwater Development Project, May, 2008
TriHydro Corporation, Executive Summary North Platte River Groundwater Assessment Study Split Rock Groundwater Development Project Including Hydrologic Connection Report Casper Pipeline Feasibility Study, Jun, 2008
METI Inc., The Effect of Insect Mortality and Other Disturbances on Water Yield in the North Platte River Basin, Jan, 2014
RESPEC, Middle North Platte Watershed Study Watershed Management Plan, Final Report, Feb, 2014
RESPEC, Middle North Platte Watershed Study Watershed Management Plan, Executive Summary, Feb, 2014
Anderson Consulting Engineers, Inc., Upper North Platte River Watershed Study Level I, Final Report, Dec, 2015
Anderson Consulting Engineers, Inc., Upper North Platte River Watershed Study Level I, Executive Summary, Dec, 2015
RESPEC, Middle North Platte River - Glendo Watershed Study, Watershed Management Plan, Final Report, Nov, 2016
RESPEC, Middle North Platte River - Glendo Watershed Study, Watershed Management Plan, Executive Summary, Nov, 2016
Platte Alliance, Platte Alliance Water Supply Level II Study, Final Report, Vol 1, Dec, 2019
Platte Alliance, Platte Alliance Water Supply Level II Study, Final Report, Vol 2, Dec, 2019
Platte Alliance, Platte Alliance Water Supply Level II Study, Final Report, Vol 3, Dec, 2019
Platte Alliance, Platte Alliance Water Supply Level II Study, Executive Summary, Dec, 2019

North Uinta
Forsgren Associates, North Uinta County Improvement and Service District Water Supply Master Plan Level I, Final Report, Sep, 2000
TriHydro Corporation, North Uinta Water Supply Project Level II Feasibility Study, Bear River, Wyoming, Final Report, Mar, 2003
TriHydro Corporation, North Uinta Water Supply Project Level II Feasibility Study, Bear River, Wyoming, Executive Summary, Mar, 2003

Northeast Wyoming River Basins
Wyoming Water Development Commission, Northeast Wyoming Level I Final Report, Sep, 1985
HKM Engineering, Northeast Wyoming River Basins Plan, Final Report, Feb, 2002 (25,190 kb)
HKM Engineering, Northeast Wyoming River Basins Plan, Executive Summary, Feb, 2002 (1,576 kb)
HKM Engineering, Northeast Wyoming River Basins Plan Technical Memoranda Volume II, K-U, Feb, 2002 ( kb)
HKM Engineering, Northeast Wyoming River Basins Plan Technical Memoranda Volume I, A-J, Feb, 2002 ( kb)
Wyoming State Geological Survey, Northeast River Basins Water Plan Update Groundwater Study Level I (2002-2016) Available Groundwater Determination Technical Memorandum No. 8, Final Report, Dec, 2019 (116,135 kb)
Wyoming State Geological Survey, Northeast River Basins Water Plan Update Groundwater Study Level I (2002-2016) Available Groundwater Determination Technical Memorandum No. 8, Executive Summary, Dec, 2019 (4,236 kb)

Northern Arapaho
James Gores and Associates, P.C., Northern Arapaho Groundwater Level II Study Master Plan, Executive Summary, Oct, 2009
James Gores and Associates, P.C., Northern Arapaho Groundwater Level II Study Master Plan, Oct, 2009

Northwest
DOWL, Northwest Rural Water District Master Plan Level I Study, Final Report, Aug, 2017
DOWL, Northwest Rural Water District Master Plan Level I Study, Executive Summary, Aug, 2017

Nowood
Sage Civil Engineering, Lower Nowood Rural Water Supply Level I, Final Report, Oct, 2012
Sage Civil Engineering, Lower Nowood Rural Water Supply Level I, Executive Summary, Oct, 2012
Sage Civil Engineering, Lower Nowood Rural Water Supply Level II, Final Report, Sep, 2014
Sage Civil Engineering, Lower Nowood Rural Water Supply Level II, Executive Summary, Sep, 2014
Sage Civil Engineering, Lower Nowood Rural Water Supply Level II Study, Environmental Study, Oct, 2014

Nowood River
Anderson Consulting Engineers, Inc., Nowood River Storage/Watershed Study Level I, Final Report, Mar, 2010
Anderson Consulting Engineers, Inc., Nowood River Storage/Watershed Study Level I, Executive Summary, Mar, 2010
TriHydro Corporation, Nowood River Storage Level II Study Phase I, Executive Summary, Dec, 2013
TriHydro Corporation, Nowood River Storage Level II Study Phase I Summary Report Volume II, Appendices, Dec, 2013
Trihydro Corporation, Nowood River Storage Level II Study Phase I Summary Report Volume I, Report, Tables, Figures, Sheets, Dec, 2013
TriHydro Corporation, Nowood River Storage Level II Study Phase II Summary Report, Executive Summary, Jan, 2016
TriHydro Corporation, Nowood River Storage Level II Study Phase II Summary Report Volume II, Appendices, Jan, 2016
TriHydro Corporation, Nowood River Storage Level II Study Phase II Summary Report Volume I, Report, Tables, Figures, Sheets, Jan, 2016
Bureau of Land Management, Alkali Creek Reservoir, NEPA Analysis, Oct, 2019 ( kb)

Oakley
Johnson-Fermelia Company, Inc., Phase I Report, Oakley Water Supply Project Level II, Feasibility Study, Aug, 1989
Johnson-Fermelia Company, Inc., Supplement to Phase I Report, Oakley Water Supply Project Level II, Feasibility Study, Sep, 1989
Johnson-Fermelia Company, Inc., Phase III Report (Opal Pipeline), Oakley Water Supply Project Level II Feasibility Study, Executive Summary, Apr, 1990
Johnson-Fermelia Company, Inc., Phase III Report (Opal Pipeline), Oakley Water Supply Project Level II Feasibility Study, Apr, 1990
Johnson-Fermelia Company, Inc., Phase II Report, Oakley Water Supply Project Level II, Feasibility Study, Executive Summary, Apr, 1990
Johnson-Fermelia Company, Inc., Phase II Report, Oakley Water Supply Project Level II, Feasibility Study, Apr, 1990

Oasis Ditch
Short Elliott Hendrickson Inc., Big Laramie River Oasis Ditch Diversion Rehabilitation Project Level II Study, Final Report, Aug, 2019
Short Elliott Hendrickson Inc., Big Laramie River Oasis Ditch Diversion Rehabilitation Project Level II Study, Executive Summary, Aug, 2019

Opal
Sunrise Engineering, Opal Regional System Level II Study, Executive Summary, Oct, 2000
Sunrise Engineering, Opal Regional System Level II Study, Oct, 2000
Sunrise Engineering, Opal Regional System Level II, Phase II Study, Executive Summary, Sep, 2001
Sunrise Engineering, Opal Regional System Level II, Phase II Study, Sep, 2001
Forsgren Associates, Town of Opal Master Plan Level I, Final Report, Sep, 2016
Forsgren Associates, Town of Opal Master Plan Level I, Executive Summary, Sep, 2016

Osage
Banner Associates, Inc, Osage Water Supply Project Level II, Final Report, Executive Summary, Jan, 1994
Banner Associates, Inc, Osage Water Supply Project Level II, Final Report, Jan, 1994
Banner Associates, Inc, Osage Water Supply Project Level II Extension, Final Report, Apr, 1996
Banner Associates, Inc, Osage Water Supply Project Level II Extension, Executive Summary, Apr, 1996
Jorgensen Associates, P.C., Osage Water Master Plan Level I Study, Final Report, Jun, 2019
Jorgensen Associates, P.C., Osage Water Master Plan Level I Study, Executive Summary, Jun, 2019

Owl Creek
Nelson Engineering, Owl Creek Master Plan Level I, Final Report, Sep, 2004
Nelson Engineering, Owl Creek Master Plan Level I, Executive Summary, Sep, 2004
Aqua Engineering, Inc., Owl Creek Irrigation District Conservation Study Level II, Final Report, Oct, 2006
Aqua Engineering, Inc., Owl Creek Irrigation District Conservation Study Level II, Executive Summary, Oct, 2006
Engineering Associates, Owl Creek Rural Water Supply Level I Study, Final Report, Aug, 2007
Engineering Associates, Owl Creek Rural Water Supply Level I Study, Executive Summary, Aug, 2007
Short Elliott Hendrickson Inc., Owl Creek Irrigation District Storage Level II Study, Final Report, Jul, 2008
Short Elliott Hendrickson Inc., Owl Creek Irrigation District Storage Level II Study, Executive Summary, Jul, 2008
Anderson Consulting Engineers, Inc., Final Report for Owl Creek Irrigation District Lucerne Master Plan Level I Study, Sep, 2021
Anderson Consulting Engineers, Inc., Executive Summary for Owl Creek Irrigation District Lucerne Master Plan Level I Study, Sep, 2021
Engineering Associates, Owl Creek Rural Water Supply Level II Study, Final Report, Jul, 2009
Engineering Associates, Owl Creek Rural Water Supply Level II Study, Executive Summary, Jul, 2009
Lowham Walsh Engineering & Environmental, Owl Creek Watershed Level I Study, Final Report, Dec, 2017
Lowham Walsh Engineering & Environmental, Owl Creek Watershed Level I Study, Executive Summary, Dec, 2017

Park Reservoir Dam
Woodward-Clyde Consultants, Park Reservoir Dam Near Sheridan, Wyoming, Oct, 1980
Wyoming Water Development Commission, Report to the Wyoming Legislature and the Governor, Reconstruction of Park Reservoir Dam, Jan, 1981
Woodward-Clyde Consultants, Environmental Assessment for Replacement of Park Reservoir Dam, Jan, 1981

Pathfinder
Bureau of Reclamation, Pathfinder Modification Project Proposal, Hydrologic Evaluation, Aug, 1998
ECI, Pathfinder Modification Project Alternatives Analysis Report, Nov, 2004

Pavillion
James Gores and Associates, P.C., Pavillion Area Water Supply Level I Study, Final Report, Oct, 2011
James Gores and Associates, P.C., Pavillion Area Water Supply Level I Study, Executive Summary, Oct, 2011
James Gores and Associates, P.C., Pavillion Area Water Supply Level I Study Extension, Aug, 2012
James Gores and Associates, P.C., Pavillion Area Water Supply Level II Study, Final Report, Jan, 2013
James Gores and Associates, P.C., Pavillion Area Water Supply Level II Study, Executive Summary, Jan, 2013
DOWL, Pavillion Water Master Plan, Level I Study, Final Report, Jul, 2021
DOWL, Pavillion Water Master Plan, Level I Study, Executive Summary, Jul, 2021

Pine Bluffs
AVI, Pine Bluffs Level I Water Study, Executive Summary, Nov, 1994
AVI, Pine Bluffs Level I Water Study, Nov, 1994
Lidstone and Anderson, Final Report, Town of Pine Bluffs Water Supply Project Level II, Nov, 1995
Lidstone and Anderson, Executive Summary of the Final Report, Town of Pine Bluffs Water Supply Project Level II, Nov, 1995
Lidstone and Anderson, Town of Pine Bluffs Ground Water Exploration Grant Final Report, Aug, 2003
Dahlgren Consulting, Inc, Pine Bluffs Lance Fox Hills Well Level II Study, Final Report, Oct, 2005
Dahlgren Consulting, Inc, Pine Bluffs Lance Fox Hills Well Level II Study, Executive Summary, Oct, 2005
JR Engineering, Master Plan Level I Study for the Town of Pine Bluffs, WY, Executive Summary, Sep, 2009
JR Engineering, Master Plan Level I Study for the Town of Pine Bluffs, WY , Sep, 2009

Pine Butte
Centennial Engineering & Research, Inc., Level I Reconnaissance Information, Pine Butte Improvement and Service District, Gillette, Wyoming, Dec, 1991
HKM Engineering, Final Report for a Proposed Water Supply System for Pine Butte Improvement and Service District, Oct, 1992
Wester Wetstein & Associates, Construction, Testing and Conceptual Completion Design of the Pine Butte No. 1 Well for the Pine Butte Water Supply Project Level II, Dec, 1993
Wester Wetstein & Associates, Construction, Testing and Conceptual Completion Design of the Pine Butte No. 1 Well, Executive Summary for the Pine Butte Water Supply Project Level II, Jan, 1994

Pine Haven
Stetson Engineering, Inc, Pine Haven Master Plan Level I Reconnaissance Study, Final Report, Nov, 2000
Stetson Engineering, Inc, Pine Haven Master Plan Level I Reconnaissance Study, Executive Summary, Nov, 2000
Wester Wetstein & Associates, Pine Haven Well Project Level II, Final Report, Jun, 2003
Wester Wetstein & Associates, Pine Haven Well Project Level II, Executive Summary, Jun, 2003
Bearlodge Ltd, Inc., Pine Haven Master Plan Level I Study, Final Report, Dec, 2009
Bearlodge Ltd, Inc., Pine Haven Master Plan Level I Study, Executive Summary, Dec, 2009
Baker & Associates, Inc., Pine Haven Tank & Well Level II Study, Final Report, Sep, 2014
Baker & Associates, Inc., Pine Haven Tank & Well Level II Study, Executive Summary, Sep, 2014

Pinedale
Johnson-Fermelia Company, Inc., Watershed Management Control Plan, Pinedale Water Supply Project Level II, Sep, 1993
Johnson-Fermelia Company, Inc., Pinedale Water Supply Project Level II, Phase II Report, Sep, 1993
Johnson-Fermelia Company, Inc., Pinedale Water Supply Project Level II, Phase I Report, Sep, 1993
TST Inc., Town of Pinedale Water Supply Master Plan Level I, Phase 1 and Phase 2, Executive Summary, Nov, 1995
TST Inc., Town of Pinedale Water Supply Master Plan Level I, Phase 1 and Phase 2, Nov, 1995
Sunrise Engineering, Pinedale Hydropower Study Level II, Final Report, May, 2003
Sunrise Engineering, Pinedale Hydropower Study Level II, Executive Summary, May, 2003
Rio Verde Engineering, Pinedale Master Plan 2007 Level I Study, Final Report, Mar, 2009
Rio Verde Engineering, Pinedale Master Plan 2007 Level I Study, Executive Summary, Mar, 2009
Applegate Group, Inc., Pinedale Hydropower Level II Study, Final Report, Sep, 2015
Applegate Group, Inc., Pinedale Hydropower Level II Study, Executive Summary, Sep, 2015
Forsgren Associates, Pinedale Water Master Plan, Level I, Final Report, Sep, 2021
Forsgren Associates, Pinedale Water Master Plan, Level I, Executive Summary, Sep, 2021

Piney Cruse
EnTech, Inc, Piney Cruse Diversion Level II Study, Final Report, May, 2016
EnTech, Inc, Piney Cruse Diversion Level II Study, Executive Summary, May, 2016

Pioneer
609 Consulting, LLC, Pioneer Rehabilitation Level II Study, Executive Summary, Nov, 2010
609 Consulting, LLC, Pioneer Rehabilitation Level II Study, Final Report, Nov, 2010

Pioneer Canal
Western Water Consultants, Pioneer Canal Improvements Project Level II, Phase II Report, Final Report, Dec, 1991
Western Water Consultants, Pioneer Canal Improvements Project Level II, Phase II Report, Executive Summary, Dec, 1991

Platte
Lidstone and Associates, Inc., Platte Goshen Regional Master Plan Level I Study, Executive Summary, Sep, 2004
Lidstone and Associates, Inc., Platte Goshen Regional Master Plan Level I Study, Sep, 2004
TriHydro Corporation, Platte River Basin Plan, Technical Memorandums 2.1.5-5.3, Vol. II, May, 2006 ( kb)
TriHydro Corporation, Platte River Basin Plan, Technical Memorandums 1.1-2.1.4, Vol. I, May, 2006 ( kb)
TriHydro Corporation, Platte River Basin Plan, Final Report, May, 2006 (57,075 kb)
TriHydro Corporation, Platte River Basin Plan, Executive Summary, May, 2006 (1,400 kb)
Wyoming State Geological Survey, Platte River Basin Water Plan Update Groundwater Study Level I (2009-2013) Available Groundwater Determination Technical Memorandum, Plates, Dec, 2013 ( kb)
Wyoming State Geological Survey, Platte River Basin Water Plan Update Groundwater Study Level I (2009-2013) Available Groundwater Determination Technical Memorandum, Executive Summary , Dec, 2013 (7,947 kb)
Wyoming State Geological Survey, Platte River Basin Water Plan Update Groundwater Study Level I (2009-2013) Available Groundwater Determination Technical Memorandum , Dec, 2013 (44,273 kb)
Wenck Associates, Inc., Platte River Basin Plan 2016 Update, Executive Summary, V. I, Dec, 2016 (18,861 kb)
Wenck Associates, Inc., Platte River Basin Plan 2016 Update, Surface Water Resources Analysis, V. 2, Dec, 2016 (3,328 kb)
Wenck Associates, Inc., Platte River Basin Plan 2016 Update, Basin Surface Water Use Profile, V. 3, Dec, 2016 (70,477 kb)
Wenck Associates, Inc., Platte River Basin Plan 2016 Update, Water Demand Projections, V. 4, Dec, 2016 (5,366 kb)
Wenck Associates, Inc., Platte River Basin Plan 2016 Update, Future Water Use Issues and Water Supply Strategies, V. 5, Dec, 2016 (16,094 kb)

Poison Spider
Civil Engineering Professionals, Inc., Poison Spider Water Supply Project Level II Feasibility Study, Final Report, Nov, 1994
Civil Engineering Professionals, Inc., Poison Spider Water Supply Project Level II Feasibility Study, Executive Summary, Nov, 1994
609 Consulting, LLC, Poison Spider Pipelines Level II Study, Final Report, Nov, 2010
609 Consulting, LLC, Poison Spider Pipelines Level II Study, Executive Summary, Nov, 2010

Popo Agie Watershed
Anderson Consulting Engineers, Inc., Popo Agie River Watershed Study Level I, Final Report, Jul, 2003
Anderson Consulting Engineers, Inc., Popo Agie River Watershed Study Level I, Executive Summary, Jul, 2003
Olsson Associates, Popo Agie Watershed Study Level I Phase II, Final Report, Nov, 2019
Olsson Associates, Popo Agie Watershed Study Level I Phase II, Executive Summary, Nov, 2019

Porto Canal
Sunrise Engineering, Porto Canal Rehabilitation Project Level II Study, Final Report, Oct, 1994
Sunrise Engineering, Porto Canal Rehabilitation Project Level II Study, Executive Summary, Oct, 1994

Powder River
Harza, Powder River Level I Reconnaissance Study, Status Report to Wyoming Legislature, Nov, 1982
Harza, Storage Developments for Water Supply, Powder River Basin in Wyoming, Level I Reconnaissance Study, Volume II, Appendices, Sep, 1983
Harza, Storage Developments for Water Supply, Powder River Basin in Wyoming, Level I Reconnaissance Study, Volume 1, Main Report, Sep, 1983

Powder-Tongue River Basin
HKM Engineering, Powder/Tongue River Basin Plan, Technical Memoranda, Vol. I, A-I, Feb, 2002 ( kb)
HKM Engineering, Powder/Tongue River Basin Plan, Technical Memoranda, Vol. II, J-K, Feb, 2002 ( kb)
HKM Engineering, Powder/Tongue River Basin Plan, Technical Memoranda, Vol. III, L-U, Feb, 2002 ( kb)
HKM Engineering, Powder/Tongue River Basin Plan, Final Report, Feb, 2002 (28,237 kb)
HKM Engineering, Powder/Tongue River Basin Plan, Executive Summary, Feb, 2002 (988 kb)
Wyoming State Geological Survey, Powder/Tongue River Basins Water Plan Update Groundwater Study Level I (2002-2016) Available Groundwater Determination Technical Memorandum No. 8, Final Report, Dec, 2019 (116,135 kb)
Wyoming State Geological Survey, Powder/Tongue River Basins Water Plan Update Groundwater Study Level I (2002-2016) Available Groundwater Determination Technical Memorandum No. 8, Executive Summary, Dec, 2019 (4,236 kb)

Powell
Engineering Associates, Powell Master Plan Level I Study, Final Report, Oct, 2000
Engineering Associates, Powell Master Plan Level I Study, Executive Summary, Oct, 2000
GDA Engineers, Powell Airport Water Supply Level I Study, Final Report, Feb, 2010
GDA Engineers, Powell Airport Water Supply Level I Study, Executive Summary, Feb, 2010

Prairie Dog
HDR, Prairie Dog Level I Hydropower Feasibility Study, Final Report, Dec, 1984
HDR, Prairie Dog Level I Hydropower Feasibility Study, Executive Summary, Dec, 1984
EnTech, Inc, Final Report for Prairie Dog Creek Watershed Master Plan Level I Study, Nov, 2001
EnTech, Inc, Executive Summary for Prairie Dog Creek Watershed Master Plan Level I Study, Nov, 2001

Rafter J
Jorgenson Engineering, Rafter J Water Supply Level II Study, Final, Nov, 1998
Jorgenson Engineering, Rafter J Water Supply Level II Study, Executive Summary, Nov, 1998

Ranchester
EnTech, Inc, Final Report for Ranchester Master Plan Level I Study, Nov, 2002
EnTech, Inc, Executive Summary for Ranchester Master Plan Level I Study, Nov, 2002
EnTech, Inc, Ranchester Water Supply Level II Study, Final Report, Nov, 2004
EnTech, Inc, Ranchester Water Supply Level II Study, Executive Summary, Nov, 2004

Rawlins
James M. Montgomery, Consulting Engineers, City of Rawlins, Wyoming Hydrogeologic and Water Supply Study Task Report No. 1, Phase I, May, 1982
James M. Montgomery, Consulting Engineers, City of Rawlins, Wyoming Hydrogeologic and Water Supply Study Task Report No. 2, Phase II, III, IV, Jul, 1982
James M. Montgomery, Consulting Engineers, City of Rawlins Water Development Master Plan V. II, Background Data and Reports, May, 1983
James M. Montgomery, Consulting Engineers, City of Rawlins Water Development Master Plan V. I, May, 1983
Anderson & Kelly, Inc., Hydrogeologic Evaluation of the Nugget Aquifer Near Rawlins, Wyoming Level II Feasibility Study, Nov, 1984
James M. Montgomery, Consulting Engineers, Rawlins Groundwater Project Level III, Summary of Interim Report and Nugget Aquifer Report, Jan, 1986
James M. Montgomery, Consulting Engineers, Rawlins Groundwater Project Level III, Nugget Aquifer Report, Feb, 1986
James M. Montgomery, Consulting Engineers, Rawlins Groundwater Project Level III, Interim Report, Feb, 1986
Jeffrey L. Hauff, Report of a Class III Cultural Resource Inventory, Rawlins Groundwater Project, Lower Sage Creek Transmission Line, Carbon County, Wyoming, Jul, 1986
James M. Montgomery, Consulting Engineers, City of Rawlins, Wyoming Sage Creek Water Transmission Pipeline and Wellfield Facilities, Legislative Executive Summary, Dec, 1986
Western Water Consultants, City of Rawlins Water Supply Project Level II, Phase I Report, Nov, 1997
Western Water Consultants, City of Rawlins Water Supply Project Level II, Phase II Report, Jun, 1998
Western Water Consultants, City of Rawlins Water Supply Project Level II, Executive Summary, Jun, 1998
Western Water Consultants, Rawlins Raw Water Storage Level II, Phase I and II Report, Executive Summary, Oct, 2006
Western Water Consultants, Rawlins Raw Water Storage Level II, Phase I and II Report, Oct, 2006
Western Water Consultants, Rawlins Raw Water Storage Level II, Phase III Report, Sep, 2008
Wester Wetstein & Associates, City of Rawlins Water Master Plan Level I, Final Report, May, 2010
Wester Wetstein & Associates, City of Rawlins Water Master Plan Level I, Executive Summary, May, 2010
PMPC, City of Rawlins Operations Level I Study, Final Report, Jun, 2013
PMPC, City of Rawlins Operations Level I Study, Executive Summary, Jun, 2013

Ray Lake
Western Water Consultants, Ray Lake Dam Rehabilitation and Enlargement 50% Conceptual Design of Enlargement Report, Aug, 1994
Gannett Fleming, Ray Lake Enlargement Level II Study, Final Report, Jul, 2005
Gannett Fleming, Ray Lake Enlargement Level II Study, Executive Summary, Jul, 2005

Red Lane
Civil Engineering Professionals, Inc., Red Lane Rehabilitation Project Level II Feasibility Study, Phase I, Inventory Report, Sep, 1989
Civil Engineering Professionals, Inc., Red Lane Rehabilitation Project Level II Feasibility Study, Final Report, Sep, 1990
Civil Engineering Professionals, Inc., Red Lane Rehabilitation Project Level II Feasibility Study, Executive Summary, Dec, 1990
Engineering Associates, Red Lane Master Plan Water Supply Project Level I Study, Final Report, Jul, 2010
Engineering Associates, Red Lane Master Plan Water Supply Project Level I Study, Executive Summary, Jul, 2010

Ridgewater
Centennial Engineering & Research, Inc., Ridgewater Water Supply Project Level II, Phase I Report, Aug, 1989
TriHydro Corporation, Ridgewater Water Supply Project Level II, Phase II Report, Nov, 1990
Centennial Engineering & Research, Inc., Ridgewater Water Supply Project Level II, Final Report, Dec, 1991
Centennial Engineering & Research, Inc., Ridgewater Water Supply Project Level II, Executive Report, Dec, 1991

Riverside
Simons, Li and Associates, Riverside Groundwater Resources Investigation and Development, Interim Report, May, 1982
Simons, Li and Associates, Riverside Groundwater Resources Investigation and Development, Final Report, Sep, 1982
PMPC, Level II Analysis Riverside Area Municipal Water Supply System Town Riverside, Carbon County, Wyoming, Interim Report, Feb, 1990
PMPC, Level II Analysis Riverside Municipal Water Supply System Town of Riverside, Carbon County, Wyoming, Volume II, Technical Appendix, Jun, 1992
PMPC, Level II Analysis Riverside Municipal Water Supply System Town of Riverside, Carbon County, Wyoming, Volume I, Final Report, Jun, 1992
PMPC, Level II Analysis Riverside Area Municipal Water Supply System Riverside, Wyoming, Executive Summary, Jun, 1992
PMPC, Groundwater Exploration Program Riverside No. 7 Well, Sierra Madre Water and Sewer Joint Powers Board, May, 2011

Riverton
Boyle Engineering Corporation, Project Status Report and Cost Estimate, Riverton Valley Irrigation District, Dec, 1982
James Gores and Associates, P.C., Riverton Regional Water Master Plan Level I, Final Report, Jun, 1998
James Gores and Associates, P.C., Riverton Regional Water Master Plan Level I, Executive Summary, Jun, 1998
Nelson Engineering, Riverton Water Supply Project Level II, Phase I, Jan, 2000
Nelson Engineering, Riverton Water Supply Project Level II, Phase II, Final Report, Jun, 2000
Nelson Engineering, Riverton Water Supply Project Level II, Phase II, Executive Summary, Jun, 2000
Inberg-Miller Engineers, Riverton Valley Rehabilitation No. 2 Level II, Final Report, Oct, 2001
Inberg-Miller Engineers, Riverton Valley Rehabilitation No. 2 Level II, Executive Summary, Oct, 2001
Nelson Engineering, Riverton East Irrigation Project Level II Feasibility Study, Final Report, Nov, 2001
Nelson Engineering, Riverton East Irrigation Project Level II Feasibility Study, Executive Summary, Nov, 2001
Inberg-Miller Engineers, Riverton Valley Rehabilitation No. 2 Level II, Phase II, Final Report, Oct, 2002
Inberg-Miller Engineers, Riverton Valley Rehabilitation No. 2 Level II, Phase II, Executive Summary, Oct, 2002
Apex Surveying, Inc, Riverton Valley Diversion Modifications Level II, Summary Report, Final Report, Aug, 2003
Apex Surveying, Inc, Riverton Valley Diversion Modifications Level II, Final Report, Aug, 2003
Keller Associates, Riverton Mountain View Acres Level II Study, Executive Summary, Aug, 2008
Keller Associates, Riverton Mountain View Acres Level II Study, Aug, 2008

Rock River
Wester Wetstein & Associates, Rock River Water Master Plan Level I Project, Final Report, Sep, 2017
Wester Wetstein & Associates, Rock River Water Master Plan Level I Project, Executive Summary, Sep, 2017

Rock Springs
JFC Engineers/Surveyors, Aquifer Testing of Ericson Formation for City of Rock Springs, Wyoming, Mar, 1984
JFC Engineers/Surveyors, Drilling and Aquifer Testing of the Ericson Formation Phase II for the City of Rock Springs, Wyoming, Jan, 1986
Forsgren Associates, Rock Springs Pipeline Level II Study, Phase I Report, Dec, 1988
Forsgren Associates, Rock Springs Pipeline Level II Study, Phase 2, Final Report, Executive Summary, Jan, 1989
Forsgren Associates, Rock Springs Pipeline Level II Study, Phase 2, Final Report, Jan, 1989
Forsgren Perkins, Rock Springs Pipeline Level II Study, Jan, 1989
Leon Kjellgren, Rock Springs East Water Supply Master Plan Level I, Final Report, Nov, 1995
Leon Kjellgren, Rock Springs East Water Supply Master Plan Level I, Executive Summary, Nov, 1995
Nelson Engineering, Westside/Rock Springs Water Supply Project Level II Study, Final Report, Oct, 1998
Nelson Engineering, Westside/Rock Springs Water Supply Project Level II Study, Executive Summary, Oct, 1998

Rolling Hills
James M. Montgomery, Consulting Engineers, Report of Drilling and Testing Rolling Hills Well No. 5, Jun, 1990
TriHydro Corporation, Level II Water Supply Project, Rolling Hills, Wyoming, Final Report, Feb, 1996
TriHydro Corporation, Level II Water Supply Project, Rolling Hills, Wyoming, Executive Summary, Feb, 1996
Civil Engineering Professionals, Inc., Rolling Hills Master Plan Level I Study, Final Report, Jan, 2012
Civil Engineering Professionals, Inc., Rolling Hills Master Plan Level I Study, Executive Summary, Jan, 2012
Weston Engineering, Inc., Town of Rolling Hills Well 2-2R, Project Report, Sep, 2017
Weston Engineering, Inc., Rolling Hills Groundwater Supply Level II, Final Report, Oct, 2018
Weston Engineering, Inc., Rolling Hills Groundwater Supply Level II, Executive Summary, Oct, 2018

Ryan Park
Coffey & Associates, Ryan Park Water Supply Project Final Report, Water Supply Alternatives Level I, Nov, 1991
Coffey & Associates, Ryan Park Water Supply Project Executive Summary, Water Supply Alternatives Level I, Nov, 1991
PMPC, Level II Analysis Ryan Park Water Supply Project Ryan Park, Carbon County, Wyoming, Final Report, Executive Summary, Nov, 1994
PMPC, Level II Analysis Ryan Park Water Supply Project Ryan Park, Carbon County, Wyoming, Final Report, Nov, 1994

Sage Creek
Northern Engineering and Testing, Inc, Report of Geotechnical Investigation for Phase II Sage Creek Water Line, Jul, 1987

Sahara Ditch
HKM Engineering, Sahara Ditch Improvements Level II, Final Report, Oct, 1992
HKM Engineering, Sahara Ditch Improvements Level II, Executive Summary, Nov, 1992

Salt Creek
Morrison-Maierle, Salt Creek, Edgerton, Midwest Water Master Plan Level I Study, Final Report, Sep, 2020
Morrison-Maierle, Salt Creek, Edgerton, Midwest Water Master Plan Level I Study, Executive Summary, Sep, 2020

Sand Lake-Canyon Canal
Inberg-Miller Engineers, Sand Lake/Canon Canal Level II Feasibility Study, Final Report, Oct, 1997
Inberg-Miller Engineers, Sand Lake/Canon Canal Level II Feasibility Study, Executive Summary, Oct, 1997

Sandstone
Stone and Webster Engineering, Sandstone Dam and Reservoir Executive Summary of the Concept Design Report, Nov, 1986
Stone and Webster Engineering, Sandstone Dam and Reservoir Concept Design Report, Nov, 1986
Stone and Webster Engineering, Sandstone Dam and Reservoir Concept Design Project Appendices, Volume 2 of 2, Nov, 1986
Stone and Webster Engineering, Sandstone Dam and Reservoir Concept Design Project Appendices, Volume 1 of 2, Nov, 1986
Stone and Webster Engineering, Computer Modeling Study of the Water Temperature Within and Released from the Proposed Sandstone Reservoir, Jan, 1987
Stone and Webster Engineering, Streamflow Depletion Study Sandstone Reservoir, Feb, 1987
Stone and Webster Engineering, Sandstone Dam and Reservoir Salinity Study, Mar, 1987
Stone and Webster Engineering, Ground Water Development as an Alternative to the Proposed Sandstone Project, Mar, 1987
Stone and Webster Engineering, Sandstone Dam and Reservoir, 1987 Supplementary Geotechnical Studies, Dec, 1987
Western Research Corporation, Phase I Presentation for an Economic Analysis of Sandstone Dam and Reservoir, Aug, 1988
Mariah Associates, Inc., Test Excavations at Seven Sites for the Sandstone Reservoir Project Carbon County Wyoming, Oct, 1988
Stone and Webster Engineering, Task II-S, 1988 Monitoring Sandstone Dam, Carbon County, Wyoming, Little Snake River Water Management Project, Jan, 1989
Western Research Corporation, An Economic Analysis of Sandstone Dam and Reservoir, Final Report, Jan, 1989
Western Research Corporation, An Economic Analysis of Sandstone Dam and Reservoir, Executive Summary, Jan, 1989
Wyoming Water Development Commission, Project Summary Sandstone Dam, Jan, 1993
Stone and Webster Engineering, Sandstone Dam and Reservoir Supplementary Geotechnical Studies, Final Report, Dec, 1993
Michael W. West and Associates, Independent Technical Review Sandstone Dam Project Near Savery, Jan, 1994

Sandy Lake Estates
Civil Engineering Professionals, Inc., Sandy Lake Estates Water Supply Project Level II Feasibility Study, Final Report, Dec, 1991
Civil Engineering Professionals, Inc., Sandy Lake Estates Water Supply Project Level II Feasibility Study, Executive Summary, Dec, 1991

Saratoga
PMPC, Saratoga Master Plan Update and Level I Study, Final Report, Mar, 2003
PMPC, Saratoga Master Plan Update and Level I Study, Executive Summary, Mar, 2003
Hinckley Consulting, Saratoga Test Well Level II Study, Final Report, Jun, 2007
Hinckley Consulting, Saratoga Test Well Level II Study, Executive Summary, Jun, 2007
Forsgren Associates, Saratoga Water Master Plan Level I, Final Report, Jul, 2019
Forsgren Associates, Saratoga Water Master Plan Level I, Executive Summary, Jul, 2019

Savery Dam
Rollins, Brown and Gunnell Inc, Geotechnical Investigation and Design Analysis for Savery Dam, Aug, 1982

Shell
Black Willow Oars, LLC, Shell Water Master Plan Level I Study, Final Report, Oct, 2018
Black Willow Oars, LLC, Shell Water Master Plan Level I Study, Executive Summary, Oct, 2018

Shell Canal
Deere & Ault Consultants, Inc., Shell Canal Tunnel Level II Feasibility Study, Final Report, Oct, 2011
Deere & Ault Consultants, Inc., Shell Canal Tunnel Level II Feasibility Study, Executive Summary, Oct, 2011

Shell Valley
Crank Companies, Inc., Executive Summary, Shell Valley Domestic Water Supply Project, Level III, Jan, 1980
HKM Engineering, Shell Valley Watershed Level II Study, Final Report, Jan, 1985
HKM Engineering, Shell Valley Watershed Level II Study, Executive Summary, Jan, 1985
ESA Geotechnical Consultants, Shell Valley Watershed, Level III, Phase 1, Interim Report on Conceptual Design, Lake Adelaide Enlargement (see Lake Adelaide), Jan, 1986
ESA Geotechnical Consultants, Shell Valley Watershed, Level III, Executive Summary, Phase 1, Interim Report on Conceptual Design, Lake Adelaide Enlargement (see Lake Adelaide), Jan, 1986
Morrison-Mairle, Inc, Final Report, Shell Valley Deep Well Project with Results of Aquifer Tests for Shell Valley Watershed Supply Project, Feb, 1986
ESA Geotechnical Consultants, Executive Summary, Phase II: Lake Adelaide Enlargement, Shell Valley Watershed Level III (see Lake Adelaide), Dec, 1986
Engineering Associates, Shell Valley Watershed Plan Level I Study, Final Report, Mar, 2010
Engineering Associates, Shell Valley Watershed Plan Level I Study, Executive Summary, Mar, 2010
Engineering Associates, Shell Valley Watershed Plan Level I Study, Appendices, Mar, 2010
States West Water Resources Corporation, Shell Valley Storage Level II Study, Executive Summary, Feb, 2013
States West Water Resources Corporation, Shell Valley Storage Level II Study, Appendices, Feb, 2013
States West Water Resources Corporation, Project Report for the Shell Valley Storage Level II Study, Final Report, Feb, 2013
Wenck Associates, Inc., Shell Valley Storagel Level II, Phase II Study, Appendices, Jun, 2015
Wenck Associates, Inc., Shell Valley Storage Level II, Phase II Study, Final Report, Jun, 2015
Wenck Associates, Inc., Shell Valley Storage Level II, Phase II Study, Executive Summary, Jun, 2015
Bureau of Land Management, Leavitt Reservoir Expansion Project, NEPA Analysis, Oct, 2019 ( kb)

Sheridan
Western Water Consultants, Potential for Ground Water Development, City of Sheridan Feasibility Report, Dec, 1982
Howard Needles Tammen & Bergendoff, Sheridan Area Water Supply Investigation Level II, Volume II, Supplemental Groundwater Information, Nov, 1985
Howard Needles Tammen & Bergendoff, Sheridan Area Water Supply Investigation Level II, Volume I, Report of Findings, Nov, 1985
Howard Needles Tammen & Bergendoff, Sheridan Area Water Supply Investigation Level II, Executive Summary, Nov, 1985
Howard Needles Tammen & Bergendoff, Sheridan Area Water Supply Investigation Level II, Phase 2, 1986 Program, Final Report, Jan, 1987
Howard Needles Tammen & Bergendoff, Sheridan Area Water Supply Investigation Level II, Phase 2, 1986 Program, Executive Summary, Jan, 1987
HKM Engineering, Sheridan Little Goose Domestic Water Supply Level II, Phase 2, Interim Report, Dec, 1987
HKM Engineering, Swig/Sheridan Area Development Analysis Level II, Final Report, Nov, 1988
HKM Engineering, Swig/Sheridan Area Development Analysis Level II, Executive Summary, Nov, 1988
HKM Engineering, Swig/Sheridan Area Development Analysis Level II, Appendix, Nov, 1988
HKM Engineering, Final Report, Swig/Sheridan Area Water Supply Study Level II, Stage II, Executive Summary, Jan, 1990
HKM Engineering, Final Report, Swig/Sheridan Area Water Supply Study Level II, Stage II, Appendix, Jan, 1990
HKM Engineering, Final Report, Swig/Sheridan Area Water Supply Study Level II, Stage II, Jan, 1990
Centennial Engineering & Research, Inc., Sheridan Area Raw Water Supply Pipeline Level II, Executive Summary, Oct, 1992
Centennial Engineering & Research, Inc., Sheridan Area Raw Water Supply Pipeline Level II, Oct, 1992
MSE-HKM, Final Report for the Sheridan Raw Water Project (Cemetery Irrigation) Level II, Oct, 1998
MSE-HKM, Executive Summary for the Sheridan Raw Water Project (Cemetery Irrigation) Level II, Oct, 1998
HKM Engineering, Final Report for the Sheridan Hydropower Study (Big Goose Treated Water Pipeline) Level II, Oct, 2002
HKM Engineering, Executive Summary for the Sheridan Hydropower Study (Big Goose Treated Water Pipeline) Level II, Oct, 2002
HKM Engineering, Final Report for the City of Sheridan VA Medical Center Water Project Level II Study, Dec, 2005
HKM Engineering, Executive Summary for the City of Sheridan VA Medical Center Water Project Level II Study, Dec, 2005
DOWL HKM, Sheridan Supplemental Supply Study Level II, Phase I, Final Report, May, 2011
DOWL HKM, Sheridan Supplemental Supply Study Level II, Phase I, Executive Summary, May, 2011
EnTech Inc., Sheridan Supplemental Storage Level II Phase II Study, Final Report, Dec, 2013
EnTech Inc., Sheridan Supplemental Storage Level II Phase II Study, Executive Summary, Dec, 2013
DOWL, Sheridan Water System Level I Study, Final Report, Jun, 2019
DOWL, Sheridan Water System Level I Study, Executive Summary, Jun, 2019
Anchor Point Group, Sheridan Municipal Watershed Wildfire Hazard Mitigation Assessment, Final Report, Jun, 2019

Shoshone
Engineering Associates, Feasibility Study, Shoshone Municipal Pipeline Project, Jan, 1983
Engineering Associates, Feasibility Study, Shoshone Municipal Pipeline Project, Executive Summary, Jan, 1983
James M. Montgomery, Consulting Engineers, Shoshone/Lakeview Water Development Project, Project Status Report, Sep, 1985
James M. Montgomery, Consulting Engineers, Shoshone Municipal Water Supply Project Level II Investigation Report, Jan, 1986
Banner Associates, Inc, Shoshone Municipal Water Supply Project Level III Interim Report, Executive Summary, Dec, 1986
Banner Associates, Inc, Shoshone Municipal Water Supply Pipelines, Level III Interim Report, Dec, 1986
Sage Civil Engineering, Shoshone Irrigation District Rehabilitation and GIS Level II Study, Final Report, Nov, 2008
Sage Civil Engineering, Shoshone Irrigation District Rehabilitation and GIS Level II Study, Executive Summary, Nov, 2008
Lidstone and Associates, Inc., Shoshone Ground Water Development Level II Report, Nov, 2008
Lidstone and Associates, Inc., Shoshone Ground Water Development Level II Report, Executive Summary, Nov, 2008
TriHydro Corporation, Final Report Clarks Fork/Upper Shoshone Watershed Level I Study, Mar, 2024
TriHydro Corporation, Executive Summary Clarks Fork/Upper Shoshone Watershed Level I Study, Mar, 2024

Shoshone River
Biota Research and Consulting, Inc, Lower Shoshone River Level I Watershed Study, Final Report, Mar, 2022
Biota Research and Consulting, Inc, Lower Shoshone River Level I Watershed Study, Executive Summary, Mar, 2022

Shoshoni
Civil Engineering Professionals, Inc., Shoshoni Water Supply System Rehabilitation Project Level II Feasibility Study, Final Report, Jan, 1991
Civil Engineering Professionals, Inc., Shoshoni Water Supply System Rehabilitation Project Level II Feasibility Study, Executive Summary, Jan, 1991
James Gores and Associates, Inc., Shoshoni Master Plan, Level I Study, Final Report, Aug, 2021
James Gores and Associates, Inc., Shoshoni Master Plan, Level I Study, Executive Summary, Aug, 2021

Sidon Canal
Inberg-Miller Engineers, Interim Report for Marchant Wash Crossing, Sidon Canal Rehabilitation Project Level II, Oct, 1993
Inberg-Miller Engineers, Sidon Canal Rehabilitation Project Level II Project Report, Executive Summary, Sep, 1994
Inberg-Miller Engineers, Sidon Canal Rehabilitation Project Level II Project Report, Sep, 1994

Sinclair
States West Water Resources Corporation, Town of Sinclair Water Supply Master Plan Level I Project, Summary Report, Jun, 1995
States West Water Resources Corporation, Town of Sinclair Water Supply Master Plan Level I Project, Jun, 1995
States West Water Resources Corporation, Town of Sinclair and City of Rawlins Level I, Phase II Water Supply Project, Feb, 1996
PMPC, Sinclair Water Supply Project Level II Feasibility Study, Final Report, Jul, 2001
PMPC, Sinclair Water Supply Project Level II Feasibility Study, Executive Summary, Jul, 2001

Sinnard Reservoir
Banner Associates, Inc, Sinnard Reservoir Rehabilitation Project Level II Feasibility Study, Final Report, Mar, 1993
Banner Associates, Inc, Sinnard Reservoir Rehabilitation Project Level II Feasibility Study, Executive Summary, Mar, 1993

Skyline
Nelson Engineering, WWDC Level II Study for Skyline Improvement & Service District Water Supply, Jackson, WY, Final Report, Jul, 2021
Nelson Engineering, WWDC Level II Study for Skyline Improvement & Service District Water Supply, Jackson, WY, Executive Summary, Jul, 2021
Nelson Engineering, Final Report of Skyline Ranch Well #4 Groundwater Exploration Project for the Skyline Ranch Improvement and Service District, Teton County, Wyoming, Feb, 2024

Sleepy Hollow
Brown & Caldwell, Drilling, Construction, Development, and Testing of Sleepy Hollow Well No. 6, Feb, 2005

Smith's Fork
Banner Associates, Inc, Smith's Fork Drainage Level I Feasibility Study, Dec, 1983
GBR Consultants Group, Inc., Smith's Fork Project Level II Study, Final Report, Feb, 1985
GBR Consultants Group, Inc., Smith's Fork Project Level II Study, Final Report, Appendix, Feb, 1986
ARIX Corporation, Smith's Fork Irrigation Project Level II, Phase II, Conceptual Design, Nov, 1990
ARIX Corporation, Smith's Fork Irrigation Project Level II, Conceptual Design, Executive Summary, Nov, 1990

Snake-Salt River
Sunrise Engineering, Snake/Salt River Basin Plan, Technical Memoranda, Jan, 2003 ( kb)
Sunrise Engineering, Snake/Salt River Basin Plan, Final Report, Jan, 2003 (15,201 kb)
Sunrise Engineering, Snake/Salt River Basin Plan, Executive Summary, Jan, 2003 (3,532 kb)
Wyoming State Geological Survey, Snake/Salt River Basin Water Plan Update Groundwater Study Level I (2011-2014) Available Groundwater Determination Technical Memorandum No. 7, Plates, Jun, 2014 ( kb)
Wyoming State Geological Survey, Snake/Salt River Basin Water Plan Update Groundwater Study Level I (2011-2014) Available Groundwater Determination Technical Memorandum No. 7, Executive Summary, Jun, 2014 (6,030 kb)
Wyoming State Geological Survey, Snake/Salt River Basin Water Plan Update Groundwater Study Level I (2011-2014) Available Groundwater Determination Technical Memorandum No. 7, Jun, 2014 (98,154 kb)
Wyoming Water Development Office, 2012 Snake/Salt River Basin Plan Update, Volume 1, Nov, 2014 (15,646 kb)
Wyoming Water Development Office, 2012 Snake/Salt River Basin Plan Update, Technical Memorandum, Volume 2, Nov, 2014 ( kb)

South Big Horn County
DOWL, South Big Horn County Rural Water District Expansion Level II Study, Final Report, Nov, 2015
DOWL, South Big Horn County Rural Water District Expansion Level II Study, Executive Summary, Nov, 2015
DOWL, South Big Horn County Rural Water District Expansion Level II Study, Environmental Report, Nov, 2015

South Circle
609 Consulting, LLC, South Circle Master Plan Level I Study, Final Report, Nov, 2010
609 Consulting, LLC, South Circle Master Plan Level I Study, Executive Summary, Nov, 2010

South Garden Creek
CEPI, South Garden Creek Water Supply Level I Study, Executive Summary, Oct, 2002
CEPI, South Garden Creek Water Supply Level I Study, Oct, 2002

South Platte River
Dahlgren Consulting, Inc, South Platte River Watershed Level I Study, Final Report, Jun, 2018
Dahlgren Consulting, Inc, South Platte River Watershed Level I Study, Executive Summary, Jun, 2018

Squaw Creek
AVI Professional Corporation, Squaw Creek Water Supply Project Level I Study, Executive Summary, Oct, 1991
AVI Professional Corporation, Squaw Creek Water Supply Project Level I Study, Oct, 1991
Lidstone & Anderson, Inc, Final Report for Squaw Creek Water Supply Project Level II, Nov, 1994
Lidstone & Anderson, Inc, Executive Summary for Squaw Creek Water Supply Project Level II, Nov, 1994
Rendezvous Engineering, PC, Squaw Creek Water District Groundwater Exploration Grant, Final Report, Dec, 2009
AVI Professional Corporation, Squaw Creek Water Supply Level II Study, Final Report, Sep, 2012
AVI Professional Corporation, Squaw Creek Water Supply Level II Study, Executive Summary, Sep, 2012
AVI Professional Corporation, Squaw Creek Water Supply Level II Study, Phases II and III, Final Project Report, Nov, 2014

Star Valley
Forsgren Associates, Star Valley Municipal Water Supply Level I Study, Executive Summary, Jan, 1989
Forsgren Associates, Star Valley Municipal Water Supply Level I Study, Jan, 1989
TriHydro Corporation, Ground-Water Alternatives Investigation, Supplemental Report Exhibit B, Aug, 1990
TriHydro Corporation, Star Valley Appendix IV, Fairview, Wyoming, Jan, 1991
TriHydro Corporation, Star Valley Appendix III, Freedom, Wyoming, Jan, 1991
TriHydro Corporation, Star Valley Appendix II, Smoot, Wyoming, Jan, 1991
TriHydro Corporation, Star Valley Appendix I, Grover, Wyoming, Jan, 1991
TriHydro Corporation, Star Valley Water Supply Project Level II, Phase II Report, Supplemental Report Exhibit C, Nov, 1991
Forsgren Associates, Star Valley Municipal Water Supply Level II Study, Report of the Smoot Water Supply System, Final Report, Nov, 1991
Forsgren Associates, Star Valley Municipal Water Supply Level II Study, Report of the Osmond Water Supply System, Final Report, Nov, 1991
Forsgren Associates, Star Valley Municipal Water Supply Level II Study, Report of the Grover Water Supply System, Final Report, Nov, 1991
Forsgren Associates, Star Valley Municipal Water Supply Level II Study, Report of the Freedom Water Supply System, Final Report, Nov, 1991
Forsgren Associates, Star Valley Municipal Water Supply Level II Study, Report of the Fairview Water Supply System, Final Report, Nov, 1991
Forsgren Associates, Star Valley Municipal Water Supply Level II Study, Report of the Etna Water Supply System, Final Report, Nov, 1991
Forsgren Associates, Star Valley Municipal Water Supply Level II Study, Executive Summary, Nov, 1991
Forsgren Associates, Star Valley Level II Study, Freedom Water and Sewer District Water Supply System, Final Report, Dec, 1992
Forsgren Associates, Star Valley Level II Study, Freedom Water and Sewer District Water Supply System, Executive Summary, Dec, 1992
Forsgren Associates, Star Valley Level II Study, Etna Water and Sewer District Water Supply System, Final Report, Nov, 1993
Forsgren Associates, Star Valley Level II Study, Etna Water and Sewer District Water Supply System, Executive Summary, Nov, 1993
Forsgren Associates, Star Valley Ranch Master Plan, Final Report, Aug, 2008
Forsgren Associates, Star Valley Ranch Master Plan, Executive Summary, Aug, 2008
Weston Engineering, Inc., Star Valley Ranch Groundwater Level II Study, Final Report, Feb, 2009
Weston Engineering, Inc., Star Valley Ranch Groundwater Level II Study, Executive Summary, Feb, 2009
Sunrise Engineering, Star Valley Regional Master Plan, Water System Investigation & Evaluations, Book 2 of 2, Nov, 2009
Sunrise Engineering, Star Valley Regional Master Plan, Water System Investigation & Evaluations, Book 1 of 2, Nov, 2009
Sunrise Engineering, Star Valley Regional Master Plan, Final Report, Nov, 2009
Sunrise Engineering, Star Valley Regional Master Plan, Executive Summary, Nov, 2009

Stewart Creek
Forsgren Associates, Stewart Creek Irrigation Pipeline Level II Study, Final Report, Dec, 1993
Forsgren Associates, Stewart Creek Irrigation Pipeline Level II Study, Executive Summary, Dec, 1993

Stockade Beaver Creek Reservoir
Bearlodge Ltd, Inc., Stockade Beaver Creek Reservoir Level I, Final Report, Nov, 1986

Strawberry Canal
Forsgren Associates, Strawberry Canal Rehabilitation Project Level II Feasibility Study, Executive Summary, Nov, 1997
Forsgren Associates, Strawberry Canal Rehabilitation Project Level II Feasibility Study, Nov, 1997

Sublette Creek
Short Elliott Hendrickson Inc., Sublette Creek Reservoir and Covey/Mau Canal Rehabilitation Project Level II Study, Final Report, Feb, 2009
Short Elliott Hendrickson Inc., Sublette Creek Reservoir and Covey/Mau Canal Rehabilitation Project Level II Study, Executive Summary, Feb, 2009
RJH Consultants, Inc., Sublette Creek Reservoir Mau/Covey Canal Rehabilitation Level II Project, Preliminary Design Report, Volume 2 0f 2, Nov, 2010
RJH Consultants, Inc., Sublette Creek Reservoir Mau/Covey Canal Rehabilitation Level II Project, Preliminary Design Report, Volume 1 0f 2, Nov, 2010
RJH Consultants, Inc., Sublette Creek Reservoir Mau/Covey Canal Rehabilitation Level II Project, Preliminary Design Report, Executive Summary, Nov, 2010
RJH Consultants, Inc., Sublette Creek Reservoir Mau/Covey Canal Rehabilitation Level II, Phase II Project Lincoln County, Wyoming, Permitting and Hydrology Evaluation Report, Final Report, Jan, 2013
RJH Consultants, Inc., Sublette Creek Reservoir Mau/Covey Canal Rehabilitation Level II, Phase II Project Lincoln County, Wyoming, Permitting and Hydrology Evaluation Report, Executive Summary, Jan, 2013
RJH Consultants, Inc., Sublette Creek Reservoir Mau/Covey Canal Rehabilitation Level II, Phase II(a) Project, Lincoln County, Wyoming Permitting Report, Executive Summary, Mar, 2016
RJH Consultants, Inc., Sublette Creek Reservoir Mau/Covey Canal Rehabilitation Level II, Phase II(a) Project, Lincoln County, Wyoming Permitting Report, Mar, 2016

Sulphur Creek
Woodward-Clyde Consultants, Level III Design Services, Interim Report, Sulphur Creek Reservoir Enlargement Near Evanston, Wyoming, Nov, 1984
Woodward-Clyde Consultants, Executive Summary, Phase I of Level III Design Services Sulphur Creek Reservoir Enlargement Near Evanston, Wyoming, Dec, 1984
Wyoming Water Development Commission, Sulphur Creek Level III, Mill Creek Division Alternative, A Preliminary Analysis, Apr, 1985
Woodward-Clyde Consultants, Executive Summary, Level III Design Sulphur Creek Reservoir Enlargement Near Evanston, Wyoming, Dec, 1985

Sundance
Bearlodge Ltd, Inc., Report for the Sundance Groundwater Project Sundance No. 6 Well, Jun, 1986
TriHydro Corporation, Sundance Master Plan Level I, Crook County, Wyoming, Final Report, Sep, 2013
TriHydro Corporation, Sundance Master Plan Level I, Crook County, Wyoming, Final Executive Summary, Sep, 2013
TriHydro Corporation, Sundance Master Plan Level I, Crook County, Wyoming, Appendices, Sep, 2013
TriHydro Corporation, Sundance Water System Feasibility Level II Study, Crook County, Final Report, Aug, 2015
TriHydro Corporation, Sundance Water System Feasibility Level II Study, Crook County, Executive Summary, Aug, 2015

Sundance Meadows
CEPI, Sundance Meadows Water Supply Level II Study, Executive Summary, Sep, 2006
CEPI, Sundance Meadows Water Supply Level II Study, Sep, 2006

Sunset Ranch
Stetson Engineering, Inc, Final Report for Sunset Ranch Water Supply Level II Study, Sep, 2005
Stetson Engineering, Inc, Executive Summary for Sunset Ranch Water Supply Level II Study, Sep, 2005

Superior
Willard Owens Associates Inc, Hydrogeologic Report on the Water Supply Situation of the Town of Superior, Sweetwater County, Wyoming, Oct, 1981
Tudor Engineering Company, South Superior Ground Water Exploration Project Interim Report No. 2, Jan, 1982
Wyoming Water Development Commission, Superior Spring Project, Dec, 1988
James M. Montgomery, Consulting Engineers, Superior Well No. 19 Aquifer Testing Superior Water Supply Project, Jul, 1992

Sweetwater
Camp Creek Engineering, Inc., Sweetwater Water Supply Level I Reconnaissance Study, Final Report, Nov, 2010
Camp Creek Engineering, Inc., Sweetwater Water Supply Level I Reconnaissance Study, Executive Summary, Nov, 2010

Sweetwater River
Anderson Consulting Engineers, Inc., Sweetwater River Watershed Study Phase IV Willow Creek/Sage Hen Creek/Dry Creek Watershed Management Plan, Final Report, Apr, 2012
Anderson Consulting Engineers, Inc., Sweetwater River Watershed Study Phase III Alkali Creek/Crooks Creek/Buffalo Creek Watershed Management Plan, Final Report, Apr, 2012
Anderson Consulting Engineers, Inc., Sweetwater River Watershed Study Phase II Muddy Creek and Horse Creek Watershed Management Plan, Final Report, Apr, 2012
Anderson Consulting Engineers, Inc., Sweetwater River Watershed Study Phase I Long Creek Watershed Management Plan, Final Report, Apr, 2012
Anderson Consulting Engineers, Inc., Sweetwater River Watershed Study Basinwide Watershed Management Plan Level I, Final Report, Apr, 2012
Anderson Consulting Engineers, Inc., Sweetwater River Watershed Study Basinwide Watershed Management Plan Level I, Executive Summary, Apr, 2012

Ten Sleep
Lidstone & Associates, Inc, Town of Ten Sleep Water Supply Project Level I Master Plan Report, Dec, 2002
Lidstone & Associates, Inc, Final Report, Town of Ten Sleep Water Supply Project Level II Report, Jan, 2004
Lidstone & Associates, Inc, Executive Summary, Town of Ten Sleep Water Supply Project Level II Report, Jan, 2004

Teton
Nelson Engineering, Teton Village Water Supply Study Level I, Executive Summary, Oct, 1991
Nelson Engineering, Teton Village Water Supply Study Level I, Oct, 1991
Jorgenson Engineering, Teton County Level I Water Supply Master Plan, Executive Summary, Feb, 1999
Jorgenson Engineering, Teton County Level I Water Supply Master Plan, Appendices, Feb, 1999
Jorgenson Engineering, Teton County Level I Water Supply Master Plan, Feb, 1999

Thayne
Forsgren Associates, Thayne Area Water Supply, Executive Summary, Nov, 1995
Forsgren Associates, Thayne Area Water Supply Level I Study, Nov, 1995
Forsgren Associates, Thayne Water Supply Level II Study, Executive Summary, Nov, 1997
Forsgren Associates, Thayne Water Supply Level II Study, Nov, 1997
Forsgren Associates, Turnerville Water Supply System, Thayne Area Water Supply Level II Study, Final Report, Aug, 1998
Jorgenson Associates, PC, Thayne Storage Level II Study, Final Report, Oct, 2012
Jorgenson Associates, PC, Thayne Storage Level II Study, Executive Summary, Oct, 2012

Thermopolis
Anderson & Kelly, Inc., Preliminary Investigation for Proposed Geothermal Development, Thermopolis, Wyoming, Sep, 1982
Engineering Associates, Town of Thermopolis Storage and Raw Water Level II Study, Final Report, May, 2006
Engineering Associates, Town of Thermopolis Storage and Raw Water Level II Study, Executive Summary, May, 2006
Engineering Associates, South Thermopolis Water & Sewer District Water Supply Project Level I, Final Report, Sep, 2007
Engineering Associates, South Thermopolis Water & Sewer District Water Supply Project Level I, Executive Summary, Sep, 2007
Engineering Associates, South Thermopolis Water & Sewer District Water Supply Project Level II, Final Report, Jul, 2009
Engineering Associates, South Thermopolis Water & Sewer District Water Supply Project Level II, Executive Summary, Jul, 2009
Engineering Associates, Thermopolis Treated Water Line Size & Type Information from GIS for Field Use, Oct, 2015
Engineering Associates, Town of Thermopolis Master Plan Level I Study, Final Report, Nov, 2015
Engineering Associates, Town of Thermopolis Master Plan Level I Study, Executive Summary, Nov, 2015

Thirty-Three Mile
JFC Engineers/Surveyors, Final Report for Thirty-Three Mile Water Supply Project Level I, Nov, 1998
JFC Engineers/Surveyors, Executive Summary for Thirty-Three Mile Water Supply Project Level I, Nov, 1998
Civil Engineering Professionals, Inc., Thirty-Three Mile Water Supply Project Level II, Feasibility Study, Executive Summary, Oct, 1999
Civil Engineering Professionals, Inc., Thirty-Three Mile Water Supply Project Level II, Feasibility Study, Oct, 1999

Three Horses
EnTech, Inc, Final Report for Three Horses Watershed Plan Level I Study, Dec, 2002
EnTech, Inc, Executive Summary for Three Horses Watershed Plan Level I Study, Dec, 2002

Thunder Basin
Olsson Associates, Thunder Basin Watershed Management Plan Level I Watershed Study, Final Report, Volume II, Nov, 2009
Olsson Associates, Thunder Basin Watershed Management Plan Level I Watershed Study, Final Report, Volume I, Nov, 2009
Olsson Associates, Thunder Basin Watershed Management Plan Level I Watershed Study, Executive Summary, Nov, 2009
Olsson Associates, Thunder Basin Phase II Watershed Management Plan Level I Watershed Study, Lance and Lightning Creek, Volume II, Maps , Sep, 2011
Olsson Associates, Thunder Basin Phase II Watershed Management Plan Level I Watershed Study, Lance and Lightning Creek, Final Report, Volume I , Sep, 2011
Olsson Associates, Thunder Basin Phase II Watershed Management Plan Level I Watershed Study, Lance and Lightning Creek, Executive Summary, Sep, 2011

Tongue-Little Bighorn River Basin
Wyoming Water Development Commission, Water Development Potential in the Tongue River Basin, Level I Reconnaissance Study, Mar, 1984
Banner Associates, Inc, Tongue River Level I, Final Report, Jan, 1985

Torrington
Baker & Associates, Wellhead Protection Program, Torrington, Wyoming, Sep, 1994
Banner Associates, Inc, Torrington, Wyoming Water Master Plan Level I, Final Report, Nov, 1995
Banner Associates, Inc, Torrington, Wyoming Water Master Plan Level I, Executive Summary, Nov, 1995
Banner Associates, Inc, Torrington, Wyoming Water Master Plan Level I, Phase II, Final Report, Book 2 of 2, Nov, 1997
Banner Associates, Inc, Torrington, Wyoming Water Master Plan Level I, Phase II, Final Report, Nov, 1997
Banner Associates, Inc, Torrington, Wyoming Water Master Plan Level I, Phase II, Executive Summary, Nov, 1997
AVI Professional Corporation, City of Torrington Water Supply Level I Study, Final Report, Oct, 2020
AVI Professional Corporation, City of Torrington Water Supply Level I Study, Executive Summary, Oct, 2020
Hinckley Consulting, Torrington Groundwater Well #16, Dec, 2021

Town of Powder River
Banner Associates, Inc, Powder River Water Supply Level I Study, Executive Summary, Dec, 2002
Banner Associates, Inc, Powder River Water Supply Level I Study, Dec, 2002

Upper Bear
Forsgren-Perkins Engineering, PA, Water Source Investigation of the Upper Bear River Drainage Level I Study, Jan, 1983
Forsgren-Perkins Engineering, PA, Upper Bear River Drainage Water Resource Investigation Level II Feasibility Study, Executive Summary Report, Jan, 1984
Forsgren-Perkins Engineering, PA, Upper Bear River Drainage Water Resource Investigation Level II Feasibility Study , Mar, 1984

Upper Bluff
Donnell & Associates, Inc, Upper Bluff Rehabilitation Project Level II Feasibility Study, Final Report, Nov, 1988
Donnell & Associates, Inc, Upper Bluff Rehabilitation Project Level II Feasibility Study, Executive Summary, Nov, 1988

Upper Green
Wyoming Water Development Commission, Status Report to the Wyoming Legislature on the Upper Green Level II Feasibility Project, Jan, 1983
ARIX Corporation, A Report to the Wyoming Water Development Commission on the Pre-Feasibility Study of the Upper Green River Drainage Potential Reservoir Sites, Jan, 1983
Wyoming Water Development Commission, Upper Green Level II Storage Development Project Report to the Governor and Legislative Select Water Committee, Apr, 1983
Kleinfelder, Upper Green River Storage Level II Study, Executive Summary, Feb, 2007
Kleinfelder, Final Report for Upper Green River Storage Level II Study, Feb, 2007
Short Elliott Hendrickson Inc., Upper Green River Westside Storage Study, Level II, Final Report, Feb, 2009
Short Elliott Hendrickson Inc., Upper Green River Westside Storage Study, Level II, Executive Summary, Feb, 2009
Sunrise Engineering, Upper Green Watershed Study Level I, Final Report, Nov, 2014
Sunrise Engineering, Upper Green Watershed Study Level I, Executive Summary, Nov, 2014
Sunrise Engineering, Upper Green Watershed Study Level I, Appendix, Nov, 2014
Larry Pochop, Robert Burman, Development of Evapotranspiration Crop Coefficients , Climatological Data, and Evapotranspiration Models for the Upper Green River, Mar, 1987

Upper Hanover
Nelson Engineering, Upper Hanover Rehabilitation Project Level II, Final Design Report, Nov, 1990
Nelson Engineering, Upper Hanover Rehabilitation Project Level II, Executive Summary Report, Nov, 1990

Upper Laramie River
States West Water Resources Corporation, Upper Laramie River Basin Planning Study, Level I Investigation, Nov, 1991
Western Water Consultants, Report on Upper Laramie River Storage Projects Level II, Volume II, Dodge Dam and Reservoir, Feb, 1993
Western Water Consultants, Report on Upper Laramie River Storage Projects Level II, Volume I, Streamflow Modeling, Feb, 1993
Western Water Consultants, Report on Upper Laramie River Storage Projects Level II, Executive Summary, Volume I, Streamflow Modeling, Feb, 1993
Western Water Consultants, Final Report on Upper Laramie River Storage Project Level II, Volume III, City of Laramie Storage, Oct, 1993
Western Water Consultants, Executive Summary of Final Report on Upper Laramie River Storage Projects Level II, Volume III, City of Laramie Storage, Oct, 1993
Anderson Consulting Engineers, Inc., Upper Laramie River Watershed Study Level I, Final Report, Nov, 2016
Anderson Consulting Engineers, Inc., Upper Laramie River Watershed Study Level I, Executive Summary, Nov, 2016

Upper Little Warm Springs
Jorgenson Engineering, Final Level II Study Report, Upper Little Warm Springs Water Supply Project, Nov, 1993
Jorgenson Engineering, Executive Summary, Level II Study Report, Upper Little Warm Springs Water Supply Project, Nov, 1993
Jorgenson Engineering, Final Level II, (Phase III) Study Report, Upper Little Warm Springs Water Supply Project, Nov, 1995

Upper Savery
Banner Associates, Inc, Upper Savery Storage Project Hydrology Investigation, Apr, 1983
Banner Associates, Inc, Upper Savery Storage Project Hydrology Investigation, Phase II and III, Apr, 1984

Upper Snake River
Olsson Associates, Upper Snake River Level I Watershed Study, V. II, Nov, 2016
Olsson Associates, Upper Snake River Level I Watershed Study, Final Report, Nov, 2016
Olsson Associates, Upper Snake River Level I Watershed Study, Executive Summary, Nov, 2016

Upper Wind River
Short Elliott Hendrickson Inc., Upper Wind River Storage Project Level I Study, Final Report, Nov, 2001
Short Elliott Hendrickson Inc., Upper Wind River Storage Project Level I Study, Executive Summary, Nov, 2001

Upton
Weston Engineering, Inc., Upton Water Supply Project Level II, Executive Summary, May, 1991
Weston Engineering, Inc., Upton Water Supply Project Level II, May, 1991
McLaughlin Water Engineers, Ltd, Upton Well No. 6 Level II Study, Executive Summary, Sep, 2008
McLaughlin Water Engineers, Ltd, Upton Well No. 6 Level II Study, Sep, 2008
Wester Wetstein & Associates, Upton Improvement and Service District Well No 8 Project, Sep, 2006
Bearlodge Engineering & Surveying, Inc., Upton Master Plan Level I Study, May, 2023
Bearlodge Engineering & Surveying, Inc., Upton Master Plan Level I Study, May, 2023

Vista West
Baker & Associates, Vista West Water Supply Project Level I Study, Executive Summary, Oct, 1991
Baker & Associates, Vista West Water Supply Project Level I Study, Oct, 1991
Weston Engineering, Inc., Vista West Water Supply Project Level II, Final Report, Jan, 1994
Weston Engineering, Inc., Vista West Water Supply Project Level II, Executive Summary, Jan, 1994

Viva Naughton
Glenn M. Mason, Geotechnical Evaluation of Viva Naughton Reservoir, Dec, 1984
ECI, Viva Naughton Enlargement Level II Study, Final Report, Volume 2 of 2, Sep, 2004
ECI, Viva Naughton Enlargement Level II Study, Final Report, Volume 1 of 2, Sep, 2004
ECI, Viva Naughton Enlargement Level II Study, Executive Summary, Sep, 2004
Gannett Fleming, Viva Naughton Enlargement Level II, Phase II Study, Interim Report, Mar, 2007
Gannett Fleming, Viva Naughton Enlargement Level II, Phase II Study, Executive Summary for Interim Report, Mar, 2007
States West Water Resources Corporation, Viva Naughton Enlargement Study Level II, Phase II, Final Report, Jan, 2013
States West Water Resources Corporation, Viva Naughton Enlargement Study Level II, Phase II, Executive Summary, Jan, 2013
Wenck Associates, Inc., Nominal Raise of Viva Naughton Reservoir, a Supplement to the Viva Naughton Enlargement Study Level II, Phase II, Final Report, Mar, 2017
Wenck Associates, Inc., Nominal Raise of Viva Naughton Reservoir, a Supplement to the Viva Naughton Enlargement Study Level II, Phase II, Executive Summary, Mar, 2017

Wagoner Cherokee
PMPC, Wagoner Cherokee Irrigation District Level I Master Plan, Final Report, Nov, 2002
PMPC, Wagoner Cherokee Irrigation District Level I Master Plan, Executive Summary, Nov, 2002
PMPC, Wagoner Cherokee Irrigation District Level II, Phase 1 and Phase 2 Study, Final Report, Jan, 2005
PMPC, Wagoner Cherokee Irrigation District Level II, Phase 1 and Phase 2 Study, Executive Summary, Jan, 2005

Wamsutter
Sargent Irrigation Company, Report on Wamsutter Water Well Number 8, Feb, 1984
Weston Engineering, Inc., Wamsutter Water Supply Project Level II, Final Report, Nov, 1997
Weston Engineering, Inc., Wamsutter Water Supply Project Level II, Executive Summary, Nov, 1997
PMPC, Wamsutter Water Supply Level II Study, Final Report, May, 2010
PMPC, Wamsutter Water Supply Level II Study, Executive Summary, May, 2010

Washakie
Engineering Associates, Washakie Rural Water Supply Project Level I Study, Final Report, Executive Summary, Oct, 1995
Engineering Associates, Washakie Rural Water Supply Project Level I Study, Final Report, Oct, 1995
BRS, Inc, Washakie Rural Water Supply Project Level II, Final Report, Nov, 1998
BRS, Inc, Washakie Rural Water Supply Project Level II, Executive Summary, Nov, 1998
Nelson Engineering, Northern Washakie County Flood Control Study Level I, Nov, 1998
Engineering Associates, Washakie County Safety Level II Study, Final Report, Feb, 2007
Engineering Associates, Washakie County Safety Level II Study, Executive Summary, Feb, 2007

West Fork Dam and Reservoir
Rollins, Brown and Gunnell Inc, Supplementary Geotechnical Investigation, West Fork of the Bear River Dam Site, Dec, 1984
Rollins, Brown and Gunnell Inc, West Fork Dam & Reservoir Level III, Phase 1, Final Design, (Part 2), Nov, 1985
Rollins, Brown and Gunnell Inc, West Fork Dam & Reservoir Level III, Phase 1, Final Design, (Part 1), Nov, 1985
Rollins, Brown and Gunnell Inc, West Fork Dam & Reservoir Level III, Phase 1, Executive Summary, Dec, 1985

West Side Canal
States West Water Resources Corporation, West Side Canal Rehabilitation of the Jon's Drop Structure and the Four Mile Flume Level II Study, Executive Summary, Oct, 2002
States West Water Resources Corporation, West Side Canal Rehabilitation of the Jon's Drop Structure and the Four Mile Flume Level II Study, Oct, 2002

Westside
Bureau of Reclamation, Special Study on the Westside Irrigation Project (Wyoming), Sep, 1983
Nelson Engineering, Westside Project, Plan Formulation Working Document, Final Report, Jun, 1985
Bureau of Reclamation, Westside Irrigation Project Engineering Appendix to the Planning Report/Draft Environmental Statement , Oct, 1986
Bureau of Reclamation, Planning Report/Draft Environmental Statement on Westside Irrigation Project, Jan, 1988

Wheatland
Banner Associates, Inc, Wheatland Reservoir No. 2 Rehabilitation Project Level II Feasibility Study, Final Phase I Report, Feb, 1990
Banner Associates, Inc, Wheatland Reservoir No. 2 Rehabilitation Project Level II Feasibility Study, Final Phase II Report, Aug, 1990
Banner Associates, Inc, Wheatland Reservoir No. 2 Rehabilitation Project Level II Feasibility Study, Executive Summary, Aug, 1990
Civil Engineering Professionals, Inc., Wheatland Irrigation Canal Improvements Project Level II Feasibility Study, Final Report, Aug, 1990
Civil Engineering Professionals, Inc., Wheatland Irrigation Canal Improvements Project Level II Feasibility Study, Executive Summary, Aug, 1990
ESA Geotechnical Consultants, Wheatland Reservoir No. 1, Level II, Phase II Rehabilitation Study, Executive Summary, Dec, 1991
ESA Geotechnical Consultants, Wheatland Reservoir No. 1, Level II, Phase II Rehabilitation Study, Dec, 1991
States West Water Resources Corporation, Wheatland Irrigation District Conservation Study Level II, Final Report, Oct, 2005
States West Water Resources Corporation, Wheatland Irrigation District Conservation Study Level II, Executive Summary, Oct, 2005
States West Water Resources Corporation, Wheatland Irrigation District Conservation Study Level II, Phase 2, Re-Storage Reservoirs, Final Report, Sep, 2007
States West Water Resources Corporation, Wheatland Irrigation District Conservation Study Level II, Phase 2, Re-Storage Reservoirs, Executive Summary, Sep, 2007
States West Water Resources Corporation, Wheatland Irrigation District Conservation Study Level II, Phase 2, Polyacrylamide, Final Report, Sep, 2007
States West Water Resources Corporation, Wheatland Irrigation District Conservation Study Level II, Phase 2, Polyacrylamide, Executive Summary, Sep, 2007
Brian Story & Michael Urynowicz, Canal Seepage Reduction Using Anionic Polyacrylamide: Field and Bench-Scale Tests, Final Report, Sep, 2007
Brian Story & Michael Urynowicz, Canal Seepage Reduction Using Anionic Polyacrylamide: Field and Bench-Scale Tests, Executive Summary, Jun, 2008
Wester Wetstein & Associates, Wheatland Master Plan Level I Study, Final Report, Nov, 2010
Wester Wetstein & Associates, Wheatland Master Plan Level I Study, Executive Summary, Nov, 2010
Anderson Consulting Engineers, Inc., Wheatland Irrigation District Master Plan Level I, Executive Summary, Apr, 2011
Anderson Consulting Engineers, Inc., Wheatland Irrigation District Master Plan Level I, Final Report, Apr, 2011
Wenck Associates, Inc., Wheatland Irrigation District Tunnel Dam Rehabilitation Level II Study, Final Report, Aug, 2018
Wenck Associates, Inc., Wheatland Irrigation District Tunnel Dam Rehabilitation Level II Study, Executive Summary, Aug, 2018
Civil Engineering Professionals, Inc., Wheatland Master Plan Level I Study, Final Report, Feb, 2023
Civil Engineering Professionals, Inc., Wheatland Master Plan Level I Study, Executive Summary, Feb, 2023

Willwood
Stone and Webster Engineering, Willwood Hydroelectric Project Report on Feasibility Study, Oct, 1982
Engineering Associates, Willwood Dam Rehabilitation Project, Rehabilitation Plan, Aug, 1989
Engineering Associates, Willwood Dam Rehabilitation Project, Final Report, Executive Summary, Nov, 1989
Engineering Associates, Willwood Dam Rehabilitation Project, Final Report, Nov, 1989
Aqua Engineering, Inc., Willwood Irrigation District Master Plan Level I Study, Final Report, May, 2006
Aqua Engineering, Inc., Willwood Irrigation District Master Plan Level I Study, Executive Summary, May, 2006
Engineering Associates, Willwood Rehabilitation and GIS Level II Study, Geotechnical Silt Sediment Consultation, Apr, 2009
Engineering Associates, Willwood Rehabilitation and GIS Level II Study, Final Report, Jun, 2009
Engineering Associates, Willwood Rehabilitation and GIS Level II Study, Executive Summary, Jun, 2009
Sage Civil Engineering, Willwood Irrigation District Master Plan Update Level I Study, Final Report, Dec, 2015
Sage Civil Engineering, Willwood Irrigation District Master Plan Update Level I Study, Executive Summary, Dec, 2015

Wind River
Leonard Rice Consulting Water Engineers, Inc, Wind River, Blue Holes Reservoir, Hydrology and Water Rights Study, Mar, 1984
Natural Resources Consulting Engineers, Inc., Summary of the Wind River Basin Water Management Studies, Oct, 1994
BRS, Inc, Wind/Bighorn River Basin Plan, Technical Memoranda, Chapters I and II, Basin Water Use Profile, Oct, 2003 ( kb)
BRS, Inc, Wind/Bighorn River Basin Plan, Final Report, Oct, 2003 (4,237 kb)
BRS, Inc, Wind/Bighorn River Basin Plan, Executive Summary, Oct, 2003 (669 kb)
MWH Americas, Inc., Wind-Bighorn Basin Plan Update, Technical Memoranda, May, 2010 ( kb)
MWH Americas, Inc., Wind-Bighorn Basin Plan Update, Report, May, 2010 (113,300 kb)
MWH Americas, Inc., Wind-Bighorn Basin Plan Update, Executive Summary, May, 2010 (4,987 kb)
Wyoming State Geological Survey, Wind/Bighorn River Basin Water Plan Update Groundwater Study Level I (2008-2011), Available Groundwater Determination Technical Memorandum, May, 2012 (26,481 kb)
Tetra Tech, Little Wind River Drainage Level II Phase 1 Storage Feasibility Study, Executive Summary, Dec, 2016
Tetra Tech, Little Wind River Drainage Level II Phase 1 Storage Feasibility Study, Dec, 2016
Tetra Tech, Big Wind River Drainage Level II Phase 1 Storage Feasibility Study, Executive Summary, Dec, 2016
Tetra Tech, Big Wind River Drainage Level II Phase 1 Storage Feasibility Study, Dec, 2016
Western EcoSystems Technology, Inc., Wind/Bighorn River Basin Plan Update Environmental and Recreational Water Use Analysis for the Wind/Bighorn River Basin Plan Update, Sep, 2017 (13,325 kb)

Wind River Reservation
Wyoming Water Development Commission, Wind River Water Supply Project, Ground Water Exploration Program, Mar, 1996
ECI, Final Report for Wind River Export Study Level I, Phase I & II, Jan, 2002
ECI, Executive Summary for Wind River Export Study Level I, Phase I & II, Jan, 2002

Worland
Forsgren Associates, Worland Pipeline Project Level II Feasibility Study, Executive Summary, Dec, 1997
Forsgren Associates, Worland Pipeline Project Level II Feasibility Study, Dec, 1997
Anderson Consulting Engineers, Inc., Worland Area Irrigated Lands Geographic Information System (GIS) Level II Feasibility Study, Final Report, Mar, 2007
Anderson Consulting Engineers, Inc., Worland Area Irrigated Lands Geographic Information System (GIS) Level II Feasibility Study, Executive Summary, Mar, 2007
James Gores and Associates, P.C., South Worland Level I Master Plant Study, Executive Summary, Oct, 2017
James Gores and Associates, P.C., South Worland Level I Master Plan Study, Final Report, Oct, 2017

Wright
Anderson & Kelly, Inc., Wright Groundwater Supply Project Level III, Drilling and Testing of RJ-4 Well, Operating Plan and Preconstruction Report, Executive Summary, Jan, 1986
Anderson & Kelly, Inc., Wright Groundwater Supply Project Level III, Drilling and Testing of RJ-4 Well, Operating Plan and Preconstruction Report, Jan, 1986
Anderson & Kelly, Inc., Summary of Wright Groundwater Supply Project, Level III, Nov, 1986
Stetson Engineering, Inc, Wright Master Plan Level I Study, Final Report, Dec, 2009
Stetson Engineering, Inc, Wright Master Plan Level I Study, Executive Summary, Dec, 2009
HDR, Wright Water & Sewer District Water Supply Level II Study Well No. RJ-7, Final Report, Dec, 2012
HDR, Wright Water & Sewer District Water Supply Level II Study Well No. RJ-7, Executive Summary, Dec, 2012

Wyoming
Kaiser and Company, Wyoming Water Development Program Project Evaluations, Dec, 1982
Boyle Engineering Corporation, State Water Planning Process Feasibility Report, Executive Summary, Oct, 1998
Boyle Engineering Corporation, State Water Planning Process Feasibility Report, Oct, 1998
States West Water Resources Corporation, Guidelines for Development of Basin Plans, State of Wyoming Water Basin Planning Process, Feb, 2001
Weather Modification, Inc, Wyoming Level II Weather Modification Feasibility Study, Executive Summary, Mar, 2005
Weather Modification, Inc, Wyoming Level II Weather Modification Feasibility Study, Mar, 2005
North American Weather Consultants, Inc., Salt River and Wyoming Ranges Level II Weather Modification Feasibility Study, Final Report, Dec, 2006
North American Weather Consultants, Inc., Salt River and Wyoming Ranges Level II Weather Modification Feasibility Study, Executive Summary, Dec, 2006
WWC Engineering, Wyoming Framework Water Plan, Volume II, Planning Recommendations , Oct, 2007 (18,600 kb)
WWC Engineering, Wyoming Framework Water Plan, Volume I , Oct, 2007 (35,400 kb)
WWC Engineering, Wyoming Framework Water Plan, a Summary, Oct, 2007 (1,540 kb)
Ruckelshaus Institute of Environment and Natural Resources, Impacts of Wyoming Water Development Commission Regional Water System Projects on Land Use: An Analysis of Two Case Studies, Oct, 2008
Lowham Engineering LLC, Estimating Streamflow from Concurrent Discharge Measurements, May, 2009
Harvey Economics, Environmental and Recreational Water Use Study, Final Report, Apr, 2012
Harvey Economics, Environmental and Recreational Water Use Handbook, Apr, 2012
Applied Weather Associates, LLC, Probable Maximum Precipitation Study for Wyoming, Appendix F : Storm Analysis Data, Dec, 2014 (85,669 kb)
Applied Weather Associates, LLC, Probable Maximum Precipitation Study for Wyoming, Appendices A-E, G-N : Maps, Dec, 2014 (74,678 kb)
Applied Weather Associates, LLC, Probable Maximum Precipitation Study for Wyoming, Dec, 2014 (29,981 kb)
Weather Modification, Inc, Cloud Seeding Operations in the Wind River Mountains of Wyoming, 2014-2015 Season, Executive Summary, Oct, 2015
Weather Modification, Inc, Cloud Seeding Operations in the Wind River Mountains of Wyoming, 2014-2015 Season, Annual Report, Oct, 2015
Weather Modification, Inc, Cloud Seeding Operations in the Wind River Mountains of Wyoming, 2018-2019 Season, Annual Report, Aug, 2019
Weather Modification, Inc, Cloud Seeding Operations in the Wind River Mountains of Wyoming, 2018-2019 Season, Executive Summary, Aug, 2019
Weather Modification, Inc, Ground-Based Cloud Seeding Operations 2019-2020 Winter Operations Report for the Wind River Mountain Range, Wyoming, Nov, 2020
Weather Modification, Inc, Ground-Based Cloud Seeding Operations 2020-2021 Winter Operations Report for the Wind River Mountain Range, Wyoming, Dec, 2021
Weather Modification, Inc, Ground-Based Cloud Seeding Operations 2021-2022 Winter Operations Report for the Wind River Mountain Range, Wyoming, Dec, 2022
Weather Modification, Inc, Ground-Based Cloud Seeding Operations 2022-2023 Winter Operations Report for the Wind River Mountain Range, Wyoming, Nov, 2023
National Center for Atmospheric Research, Weather Modification Feasibility, Wyoming Range Level II, Phase II Study, Final Report, May, 2016
National Center for Atmospheric Research, Weather Modification Feasibility, Wyoming Range Level II, Phase II Study, Executive Summary, May, 2016
Weather Modification, Inc, Cloud Seeding Operations in the Wind River Mountains of Wyoming, 2015-2016 Season, Executive Summary, Sep, 2016
Weather Modification, Inc, Cloud Seeding Operations in the Wind River Mountains of Wyoming, 2015-2016 Season, Annual Report, Oct, 2016
Desert Research Institute, Weather Modification Laramie Range Siting and Design Levell III Feasibility Study, Final Report, Mar, 2017
Desert Research Institute, Weather Modification Laramie Range Siting and Design Levell III Feasibility Study, Executive Summary, Mar, 2017
National Center for Atmospheric Research, Weather Modification Bighorn Mountains Siting and Design Study, Executive Summary, Mar, 2017
National Center for Atmospheric Research, Weather Modification Bighorn Mountains Siting and Design Study, Final Report, Mar, 2017
Weather Modification, Inc, Cloud Seeding Operations in the Wind River Mountains of Wyomng, 2016-2017 Season, Executive Summary, Aug, 2017
Weather Modification, Inc, Cloud Seeding Operations in the Wind River Mountains of Wyoming, 2016-2017 Season, Annual Report, Aug, 2017
NCAR, Weather Modification Medicine Bow/Sierra Madre Ranges, Final Design and Permitting Study, Final Report, Dec, 2017
NCAR, Weather Modification Medicine Bow/Sierra Madre Ranges, Final Design and Permitting Study, Executive Summary, Dec, 2017
Weather Modification, Inc, Airborne Cloud Seeding Operations 2018-2019 Winter Operations Annual Report for the Sierra Madre and Medicine Bow Mountain Ranges, Wyoming, Never Summer Mountain Range, Colorado, Oct, 2019
Weather Modification, Inc, Airborne Cloud Seeding Operations 2019-2020 Winter Operations Report for the Sierra Madre, Medicine Bow, and Laramie Mountain Ranges, Wyoming, Never Summer Mountain Range, Colorado, Jul, 2020
Weather Modification, Inc, Airborne Cloud Seeding Operations 2020-2021 Winter Operations Report for the Sierra Madre, Medicine Bow, and Laramie Mountain Ranges, Wyoming, Never Summer Mountain Range, Colorado, Dec, 2021
Weather Modification, Inc, Airborne Cloud Seeding Operations 2021-2022 Winter Operations Report for the Sierra Madre, Medicine Bow, and Laramie Mountain Ranges, Wyoming, Never Summer Mountain Range, Colorado, Dec, 2022
Weather Modification, Inc, Airborne Cloud Seeding Operations 2022-2023 Winter Operations Report for the Sierra Madre and Medicine Bow Mountain Ranges, Wyoming, Never Summer Mountain Range, Colorado, Feb, 2024
TriHydro Corporation, GIS Standards Technical Memorandum, Jan, 2018 (3,005 kb)
TriHydro Corporation, GIS Data Framework Plan, Jan, 2018 (1,138 kb)
Weather Modification, Inc, Airborne Cloud Seeding in Northern Colorado as an Extension of Seeding Operations Conducted for Southern Wyoming, Phase II Report, Feb, 2018
Weather Modification, Inc, Cloud Seeding Operations in the Wind River Range of Wyoming, 2017-2018 Season, Executive Summary, Aug, 2018
Weather Modification, Inc, Cloud Seeding Operations in the Wind River Range of Wyoming, 2017-2018 Season, Annual Report, Aug, 2018
Weather Modification, Inc, Cloud Seeding Operations in the Wind River Range of Wyoming, 2018-2019 Season, Executive Summary, Aug, 2019
Weather Modification, Inc, Cloud Seeding Operations in the Wind River Range of Wyoming, 2018-2019 Season, Annual Report, Aug, 2019
Western EcoSystems Technology, Inc., River Basin Planning - Water Supply Index, Level I Study, Executive Summary, Nov, 2019
Wenck Associates, Inc., River Basin Planning - Water Supply Index, Level I Study, Point of Use Mapping Technical Memo, May, 2019
Wenck Associates, Inc., River Basin Planning - Water Supply Index, Level I Study, Agricultural, Municipal, Domestic, and Industrial Water Use Index Technical Memo, Dec, 2019
Confluence, Inc, GIS Data Model Implementation, Level I Study, Executive Summary, May, 2020
Confluence, Inc, GIS Data Model Implementation, Level I Study, Final Report, May, 2020

Yoder
Simons, Li and Associates, Yoder Groundwater Resources Investigation and Development, Final Report, Sep, 1982
TriHydro Corporation, Construction and Testing Report Yoder No. 2 Production Well, Yoder, Wyoming, Mar, 1990
Wyoming Groundwater, LLC, Yoder Groundwater Level II Study, Final Report, Oct, 2011
Wyoming Groundwater, LLC, Yoder Groundwater Level II Study, Executive Summary, Oct, 2011

York
Anderson Consulting Engineers, Inc., Final Report for York/South Side Ditch Master Plan Level I, Nov, 2002
Anderson Consulting Engineers, Inc., Executive Summary for York/South Side Ditch Master Plan Level I, Nov, 2002

Water Resources Data System Library | Water Resources Data System Homepage