WRDS Library [Home]
Digital Library Publications Videos Card Catalog
 
Match: Format:

Water Resources Data System Library
Wyoming Water Development Commission Projects and Studies

In June 2008, WRDS began a major review of all electronic documents in its WWDC "Project Report and Studies" collection. Each electronic document will be checked for completeness, and optimized to ensure compatibility with all commonly used versions of the Adobe Acrobat reader. Until this project is completed, some electronic documents dating to 2004 or earlier will not be available online. However, the majority of these files may still be obtained by contacting the WRDS Librarian at library@wrds.uwyo.edu or 307-766-6661.


Afton
Forsgren Associates, Afton Municipal Water Supply Level II Study, Final Report, Nov, 1990 (15,372 kb)
Forsgren Associates, Afton Municipal Water Supply Level II Study, Executive Summary, Nov, 1990 (3,119 kb)
BRS, Inc., Afton Water Supply Project Level II, Executive Summary, Nov, 1999 (4,226 kb)
BRS, Inc., Afton Water Supply Project Level II, Final Report, Nov, 1999 (8,160 kb)
Sunrise Engineering, Sitting, Construction and Testing of the Town of Afton New Municipal East Alley Well, Feb, 2006 (19,552 kb)

Airport Bench
Engineering Associates, Airport Bench Water Supply Project Phase II Report, Nov, 1990 (2,306 kb)
Engineering Associates, Airport Bench Water Supply Project Phase II, Executive Summary, Nov, 1990 (559 kb)

Aladdin
Soda Butte Services, Inc., Aladdin Water Supply Project Level I, Final Report, Oct, 1994 (2,839 kb)
Soda Butte Services, Inc., Aladdin Water Supply Project Level I, Executive Summary, Oct, 1994 (1,838 kb)
Soda Butte Services, Inc., Well Construction, Testing and Conceptual Design for the Aladdin Water Supply Project Level II, Executive Summary, Oct, 1995 (1,432 kb)
Soda Butte Services, Inc., Well Construction, Testing and Conceptual Design for the Aladdin Water Supply Project Level II, Final Report, Oct, 1995 (70,863 kb)

Albany County
Anderson & Kelly, Inc., Hydrogeologic Evaluation of the Casper Aquifer (Drilling Program No. 1) Albany County, Wyoming, Dec, 1982

Albin
Benchmark Engineers, P.C., Town of Albin Well and Water Supply Study Level II, Oct, 2005 (53,372 kb)
Benchmark Engineers, P.C., Town of Albin Water and Well Supply Study Level II, Executive Summary, Oct, 2005 (62 kb)

Alliance Lateral Ditch
Centennial Engineering & Research, Inc., Alliance Lateral Ditch Level II Rehabilitation Feasibility Study, Final Report, Oct, 1986 (36,027 kb)
Centennial Engineering & Research, Inc., Alliance Lateral Ditch Level II Rehabilitation Feasibility Study, Executive Summary, Nov, 1986 (2,085 kb)

Alpine
Sunrise Engineering, Alpine Junction Water Level I Study, Executive Summary, Oct, 1995 (2,966 kb)
Sunrise Engineering, Alpine Junction Water Level I Study, Oct, 1995 (10,295 kb)
Rio Verde Engineering, Executive Summary for the Alpine Spring Irrigation Supply Project, Oct, 2001 (2,089 kb)
Rio Verde Engineering, Final Report for the Alpine Spring Irrigation Supply Project, Oct, 2001 (7,766 kb)

Alta
Rendezvous Engineering, PC, Executive Summary for Level I Alta Master Plan, Nov, 2002 (4,320 kb)
Rendezvous Engineering, PC, Final Report for Level I Alta Master Plan, Nov, 2002 (9,440 kb)
Rendezvous Engineering, PC, Level II Alta Groundwater Supply Study, Executive Summary, Feb, 2007 (1,541 kb)
Rendezvous Engineering, PC, Level II Alta Groundwater Supply Study, Final Report, Feb, 2007

Baggs
Weston Groundwater Engineering, Town of Baggs, Wyoming Alluvial Well Project, Executive Summary, Jan, 2000 (863 kb)
Weston Groundwater Engineering, Town of Baggs, Wyoming Alluvial Well Project, Final Report, Jan, 2000 (4,066 kb)
AVI, Town of Baggs, Wyoming Water Supply Project Level II, Final Report, Nov, 2000 (33,865 kb)
AVI, Town of Baggs, Wyoming Water Supply Project Level II, Executive Summary, Nov, 2000 (832 kb)
AVI Professional Corporation, Town of Baggs, Wyoming Water Master Plan Level I, Executive Summary, Nov, 2002 (1,056 kb)
AVI Professional Corporation, Town of Baggs, Wyoming Water Master Plan Level I, Final Report, Nov, 2002 (33,461 kb)
Donnell & Allred, Inc., Baggs Water & Raw Water Supply Level II Report, Executive Summary, Nov, 2004 (175 kb)
Donnell & Allred, Inc., Baggs Water & Raw Water Supply Level II Report , Nov, 2004 (10,772 kb)

Bairoil
Hydro-Search, Inc., Bairoil, Wyoming Groundwater Development Feasibility Exploration Program, Nov, 1983 (70,753 kb)
Lidstone and Associates, Inc., Executive Summary of Final Report, Bairoil Water Supply Project Level II, May, 2000 (643 kb)
Lidstone and Associates, Inc., Bairoil Water Supply Project Level II, Final Report, May, 2000 (14,615 kb)
Lidstone and Associates, Inc., Bairoil Water Supply Project Level II, Phase IV, Final Report, Oct, 2001 (12,638 kb)
Lidstone and Associates, Inc., Executive Summary of Final Report, Bairoil Water Supply Project Level II, Phase V, May, 2003 (1,022 kb)
Lidstone and Associates, Inc., Town of Bairoil Water Supply Project Level II, Phase V Report, May, 2003 (21,241 kb)

Basin-Big Horn
Crank Companies, Inc., Executive Summary for Basin/Big Horn Rehabilitation Project Level II, Nov, 1990 (595 kb)
Crank Companies, Inc., Final Report for Basin/Big Horn Rehabilitation Project Level II, Nov, 1990 (30,344 kb)

Bear River
Forsgren and Associates, Bear River Basin Plan, Final Report, Jan, 2001 (3,234 kb)
Forsgren and Associates, Bear River Basin Plan, Appendix, Book 1 of 2, Jan, 2001 ( kb)
Forsgren and Associates, Bear River Basin Plan, Appendix, Book 2 of 2, Jan, 2001 ( kb)
Forsgren and Associates, Bear River Basin Plan, Executive Summary, Jan, 2001 (532 kb)

Beaver Creek
Bearlodge Ltd, Inc., Beaver Creek Dam and Reservoir Project Level II, Final Report, Aug, 1991 (42,738 kb)
Bearlodge Ltd, Inc., Beaver Creek Dam and Reservoir Project Level II, Executive Summary, Aug, 1991 (565 kb)
Bearlodge Ltd, Inc., Beaver Creek Dam and Reservoir Level I , Oct, 1989 (20,323 kb)
Bearlodge Ltd, Inc., Beaver Creek Dam and Reservoir Project Level II, Phase I Investigation, Aug, 1990 (6,765 kb)

Bedford
Forsgren-Perkins Engineering, PA, Bedford Water Supply Study Level I, Executive Summary, Oct, 1986 (8,549 kb)
Forsgren-Perkins Engineering, PA, Bedford Water Supply Study Level I, Final Report, Oct, 1986 (23,362 kb)
Forsgren-Perkins Engineering, PA, Bedford Water Supply Study Level II, Final Report, Nov, 1987 (9,850 kb)
Forsgren-Perkins Engineering, PA, Bedford Water Supply Study Level II, Executive Summary, Nov, 1987 (1,015 kb)

Bench Canal
Nelson Engineering, Bench Canal Rehabilitation Project Level II, Nov, 1991 (55,129 kb)

Beulah
Weston Engineering, Inc., Beulah Level I Water Supply Study, Final Report, Nov, 2003 (24,148 kb)
Weston Engineering, Inc., Beulah Level I Water Supply Study, Executive Summary, Nov, 2003 (5,704 kb)

Big Goose Creek
MSE-HKM, Final Report for the Big Goose Creek Diversion (Sheridan Raw Water Intake Facilities) Level II, Nov, 1999 (21,450 kb)
MSE-HKM, Executive Summary for the Big Goose Creek Diversion (Sheridan Raw Water Intake Facilities) Level II, Nov, 1999 (2,869 kb)

Big Horn Basin
ESA Geotechnical Consultants, Big Horn Basin-Clarks Fork Level II Study, Interim Report on Geotechnical Analysis Phase I, Jan, 1985 (26,726 kb)
ESA Geotechnical Consultants, Big Horn Basin-Clarks Fork Level II Study, Final Report on Project Analysis, May, 1986 (30,605 kb)
ESA Geotechnical Consultants, Big Horn Basin-Clarks Fork Level II Study, Executive Summary, May, 1986 (1,174 kb)
HDR Engineering, Inc., Guidebook for Water Resources Management & Development, Big Horn & Clarks Fork Basins, Final Report , Oct, 1988 (22,099 kb)
Engineering Associates, Big Horn Basin Rural Water Supply, Phase 1 Report, Jan, 1989 (76,993 kb)
Engineering Associates, Big Horn Basin Rural Water Supply Phase II, Executive Summary, Dec, 1990 (2,265 kb)
Engineering Associates, Big Horn Basin Rural Water Supply Phase II, Final Report, Dec, 1990 (44,848 kb)
Engineering Associates, Big Horn Basin Rural Water Supply Project Phase II Final Report, Appendix J, Expanded Systems Analysis, May, 1992 (94,710 kb)
Nelson Engineering, Big Horn Canal Feasibility Analysis Level II, Executive Summary, Jun, 1994 (702 kb)
Nelson Engineering, Big Horn Canal Feasibility Analysis Level II, Phase II Final Report, Jun, 1994 (30,648 kb)
A & H Consulting, Inc., Irrigation Hydropower Study Level II, May, 2003 (13,173 kb)
A & H Consulting, Inc., Irrigation Hydropower Study Level II, Executive Summary, May, 2003 (732 kb)
Anderson Consulting Engineers, Inc., Final Report for Big Horn Canal Rehabilitation Level II Study, Apr, 2007 (624 kb)
Anderson Consulting Engineers, Inc., Executive Summary for Big Horn Canal Rehabilitation Level II Study, Apr, 2007 (22,317 kb)

Big Piney-Marbleton
Jorgensen Engineering and Land Surveying, Big Piney/Marbleton Level II Water Supply Project Report, Final Report, Nov, 1994 (8,519 kb)
Jorgensen Engineering and Land Surveying, Big Piney/Marbleton Level II Water Supply Project Report, Executive Summary, Nov, 1994 (874 kb)

Big Sandy River
Rick Blatchley, Class III Archeological Investigations Conducted for the Big Sandy River Unit Desalinization Study Sweetwater County, Wyoming, Draft, Nov, 1982 (2,700 kb)
Greenhorne & O'Mara, Inc., Big Sandy Salinity Control, Design Review and Alternative Investigation, Dec, 1982 (1,847 kb)
State of Wyoming, Big Sandy River Unit, Colorado River Water Quality Improvement Program, Dec, 1982 (3,916 kb)
Fox Consulting Engineers, Lower Big Sandy Reservoir and Dam Geotechnical and Geological Feasibility Investigation, Feb, 1983 (4,736 kb)
Greenhorne & O'Mara, Inc., Big Sandy Salinity Control Reservoir Planning, Final Report, Mar, 1984 (5,855 kb)
Nelson Engineering, Big Sandy Water Supply Project Level II, Final Design Report, Oct, 1993 (9,319 kb)
Nelson Engineering, Big Sandy Water Supply Project Level II, Final Design Report, Executive Summary, Oct, 1993 (238 kb)

Big Valley
James Gores and Associates, P.C., Big Valley and Crossed Arrows Improvement District Water Supply Level II Study, Executive Summary, Feb, 2006 (738 kb)
James Gores and Associates, P.C., Big Valley and Crossed Arrows Improvement District Water Supply Level II Study, Final Report, Feb, 2006 (12,116 kb)

Bitter Creek
Johnson-Fermelia Company, Inc., Rock Springs, Wyoming Flood Control Project, Bitter Creek Tributaries Level II Feasibility Study, Phase 1A Report, Feb, 1989 (19,039 kb)
Johnson-Fermelia Company, Inc., Bitter Creek Channel Improvement Study, Executive Summary, Sep, 1991 (307 kb)
Johnson-Fermelia Company, Inc., Bitter Creek Channel Improvement Study, Level II for the City of Rock Springs, Sep, 1991 (9,547 kb)
Johnson-Fermelia Company, Inc., Bitter Creek Tributary Flood Study, Rock Springs, Wyoming Level II Feasibility Study, Phase II Report, Nov, 1991 (6,694 kb)
Johnson-Fermelia Company, Inc., Bitter Creek Tributary Flood Study, Rock Springs, Wyoming Level II Feasibility Study, Phase II Report Executive Summary, Nov, 1991 (279 kb)
Johnson-Fermelia Company, Inc., Supplement to Level II Report Bitter Creek Channel Improvement Study, September, 1991, and Level II, Phase II Report, Bitter Creek Tributary Flood Study, Nov, 1991 (139 kb)

Black Willow
BRS, Inc., Black Willow Water Supply Project, Thermopolis, Wyoming Level I Final Report, Nov, 1995 (2,958 kb)
BRS, Inc., Black Willow Water Supply Project, Thermopolis, Wyoming Level I Executive Summary, Nov, 1995 (692 kb)

Boulter Lake
Rio Verde Engineering, Executive Summary on the Boulter Lake Enlargement Level II Study, May, 2007 (4,370 kb)
Rio Verde Engineering, Report on the Boulter Lake Enlargement Level II Study, May, 2007 (29,329 kb)

Bridger Valley
Forsgren Associates, Bridger Valley Water Supply Study Level I Executive Summary, Nov, 1991 (1,898 kb)
Forsgren Associates, Bridger Valley Water Supply Study Level I, Nov, 1991 (11,904 kb)
Forsgren Associates, Bridger Valley Water Treatment Plan Analysis, Addition of Pioneer Water and Sewer District, Dec, 1993 (12,140 kb)
Forsgren Associates, Bridger Valley Water Supply Level II Study, Aug, 1995 (27,717 kb)
Forsgren Associates, Bridger Valley Water Supply Level II Study Executive Summary, Aug, 1995 (1,298 kb)
ECI, Bridger Valley Reservoir Level II Study, Jul, 2004 (33,422 kb)
ECI, Bridger Valley Reservoir Level II Study Executive Summary, Jul, 2004 (5,172 kb)
Gannett Fleming, Bridger Valley Reservoir Level II Phase II Study Final Report, Nov, 2006 (13,722 kb)
Gannett Fleming, Bridger Valley Reservoir Level II Phase II Study Executive Summary, Nov, 2006 (2,014 kb)

Buffalo Valley
Jorgensen Engineering and Land Surveying, Buffalo Valley Level I Water Supply Project Report, Teton County, Wyoming, Executive Summary, Nov, 1996 (4,408 kb)
Jorgensen Engineering and Land Surveying, Buffalo Valley Level I Water Supply Project Report, Teton County, Wyoming, Final Report, Nov, 1996 (8,577 kb)
Hinckley Consulting, Buffalo Valley Water Supply Project Level II Teton County, Wyoming, Final Report, Dec, 1997 (7,668 kb)
Hinckley Consulting, Buffalo Valley Water Supply Project Level II Teton County, Wyoming, Executive Summary, Dec, 1997 (1,153 kb)

Buffalo
Plains Engineering, Buffalo Hydrogeologic Reconnaissance, Jan, 1982 (8,672 kb)
Western Water Consultants, Municipal Water Supply Study for the City of Buffalo, Wyoming Level I Reconnaissance Study, Jan, 1982 (12,556 kb)
Tipton and Kalmbach, Inc., Level I Reconnaissance Study of Supplemental Municipal Water Supply for the City of Buffalo, Wyoming, Part I Report, Nov, 1984 (13,543 kb)
Tipton and Kalmbach, Inc., Level I Reconnaissance Study of Supplemental Municipal Water Supply for the City of Buffalo, Wyoming, Appendices, Nov, 1984 (10,666 kb)
Tipton and Kalmbach, Inc., Level I Reconnaissance Study of Supplemental Municipal Water Supply for the City of Buffalo, Wyoming, Summary Report, Nov, 1984 (20,979 kb)
Wyoming Water Development Commission, City of Buffalo Water Supply Alternatives Summary Report, Dec, 1987 (2,427 kb)
States West Water Resources Corporation, Buffalo Municipal Reservoir Project, Interim Report, Oct, 1988 (1,172 kb)
States West Water Resources Corporation, Buffalo Municipal Reservoir Project Level II, Phase 1 Evaluation, Mar, 1989 (14,708 kb)
States West Water Resources Corporation, Buffalo Municipal Reservoir Project Level II, Phase 1 Appendices, Mar, 1989 (6,756 kb)
States West Water Resources Corporation, Buffalo Municipal Reservoir Project Level II, Phase 1 Evaluation Executive Summary, Mar, 1989 (590 kb)
Frontier Archaeology, Class III Cultural Resource Inventory of States West Water Resources Corporation, Buffalo Municipal Reservoir Project, Johnson County, Wyoming, Sep, 1990 (856 kb)
States West Water Resources Corporation, Buffalo Municipal Reservoir Project Level II, Phase III Evaluation, Mar, 1991 (5,359 kb)
States West Water Resources Corporation, Buffalo Municipal Reservoir Project Level II, Phase III Evaluation, Executive Summary, Mar, 1991 (714 kb)
States West Water Resources Corporation, Town of Buffalo Water Storage Tank Level II Project, Executive Summary, Oct, 2002 (1,118 kb)
States West Water Resources Corporation, Town of Buffalo Water Storage Tank Level II Project, Oct, 2002 (3,001 kb)
States West Water Resources Corporation, Town of Buffalo Water Storage Tank Level II Project, Environmental Report, Jan, 2003 (3,319 kb)

Burlington
MSE-HKM, Burlington Water Supply Project Level II, Technical Report, Dec, 1996 (18,430 kb)
MSE-HKM, Burlington Water Supply Project Level II, Executive Summary, Dec, 1996 (1,674 kb)
TST, Inc., Burlington Regional Water Master Plan Level II Study, Jan, 2007 (37,016 kb)
TST, Inc., Burlington Regional Water Master Plan Level II Study, Executive Summary, Jan, 2007 (13,916 kb)

Byron
Western Water Consultants, Town of Byron Ground Water Development Feasibility Study, Sep, 1982 (62,996 kb)
Western Water Consultants, Exploratory Ground Water Investigation of the Shoshone River Alluvium Near Byron, Wyoming, Apr, 1983 (7,052 kb)
Engineering Associates, Town of Byron Raw Water Supply Project Level II Study, Final Report, Nov, 2002 (13,933 kb)
Engineering Associates, Town of Byron Raw Water Supply Project Level II Study, Executive Summary, Nov, 2002 (76 kb)

Campbell County
Raymond P. Murphy, Campbell County Coal Bed Methane Monitor Well Program, Mar, 2000
Wester-Wetstein & Associates, Interim Report, Coal Bed Methane, Aquifer Storage and Retrieval Project Level II (see also Gillette), Sep, 2003

Casper
Wright Water Engineers, Inc., Feasibility of Obtaining Groundwater from Sediments on Casper Mountain and Vicinity, Nov, 1982
Morrison-Maierle, Inc., Casper Aquifer Drilling Program No. 2 With Results of Aquifer Tests, Final Report, Jun, 1984
Wyoming Water Development Commission, Casper Aquifer Exploration Program Summary Report, May, 1986
Wyoming Water Development Commission, Casper Raw Water Project (Prepared for Casper Parks Department), Nov, 1987
Worthington, Lenhart, Carpenter and Johnson, Casper Raw Water Supply System Level II Conceptual Design Report, Oct, 1988
Worthington, Lenhart, Carpenter and Johnson, Casper Raw Water Supply System Level II Conceptual Design Report, Executive Summary, Oct, 1988
Civil Engineering Professionals, Inc., Casper Zone 2 Supply Level II Study, Executive Study, Oct, 2001
Civil Engineering Professionals, Inc., Casper Zone 2 Supply Level II Study, Oct, 2001
Anderson Consulting Engineers, Inc., Executive Summary for Casper Alcova Irrigation District Computerized Irrigation Scheduling, May, 2003
Anderson Consulting Engineers, Inc., Final Report for Casper Alcova Irrigation District Computerized Irrigation Scheduling, May, 2003
Anderson Consulting Engineers, Inc., Executive Summary for Casper Alcova Irrigation District Rehabilitation Needs Analysis, Oct, 2003
Anderson Consulting Engineers, Inc., Final Report for Casper Alcova Irrigation District Rehabilitation Needs Analysis, Oct, 2003

Centennial
James M. Montgomery, Consulting Engineers, Centennial Water Supply Project Report, Jan, 1989
James M. Montgomery, Consulting Engineers, Conceptual Design and Cost Estimates for the Centennial Water Supply Project Level II, Sep, 1989
James M. Montgomery, Consulting Engineers, Executive Summary for the Centennial Water Supply Project Level II, Sep, 1989
James M. Montgomery, Consulting Engineers, Centennial Water Supply Project Report, 1990 Centennial Wells Nos 1 and 2 Aquifer Testing, Feb, 1992

Chamberlain Reservoir
Western Water Consultants, Chamberlain Reservoir Rehabilitation Project Level II, Phase I Report, Mar, 1990
Western Water Consultants, Chamberlain Reservoir Rehabilitation Project Level II, Phase II Report, Jun, 1990
Western Water Consultants, Chamberlain Reservoir Rehabilitation Project Level II, Phase II Report, Executive Summary, Jun, 1990

Cheyenne
Water Resources Research Institute, Cheyenne Water Project Feasibility Study, Nov, 1979
ESA Geotechnical Consultants, Cheyenne North Crow Rehabilitation Project Level II, Phase 1 Report, Jan, 1989
ESA Geotechnical Consultants, Cheyenne North Crow Rehabilitation Project Level II, Phase II Report, Nov, 1989
Civil Engineering Professionals, Inc., Cheyenne Stage I Pipeline Rehabilitation Level II Feasibility Study, Final Report, Mar, 1993
Civil Engineering Professionals, Inc., Cheyenne Stage I Pipeline Rehabilitation Level II Feasibility Study, Executive Summary, Apr, 1993
States West Water Resources Corporation, North Cheyenne Master Plan Level I Project, Executive Summary, Jul, 1993
States West Water Resources Corporation, North Cheyenne Master Plan Level I Project, Final Report, Jul, 1993
States West Water Resources Corporation, North Cheyenne Master Plan Level I Project, Appendices, Jul, 1993
Black & Veatch, Cheyenne Water Supply Master Plan Level I, Volume I, Executive Summary, Jul, 1994
Black & Veatch, Cheyenne Water Supply Master Plan Level I, Volume 2, Chapter 2 through Chapter 6, Jul, 1994
Black & Veatch, Cheyenne Water Supply Master Plan Level I, Volume 3, Chapter 7 through Chapter 14, Jul, 1994
States West Water Resources Corporation, Volume 1, Final Report, Cheyenne Water Supply Level II Project, Nov, 1996
States West Water Resources Corporation, Volume 2, Appendices to Accompany Cheyenne Water Supply Level II Project, Nov, 1996
States West Water Resources Corporation, Volume 3, Appendix 8.1 Pipeline Corrosion Investigation Cheyenne Water Supply Level II Project, Nov, 1996
States West Water Resources Corporation, Volume 4, SCADA Report by KNS Communication Consultants, Cheyenne Water Supply Level II Project, Nov, 1996
States West Water Resources Corporation, Volume 5, Executive Summary, Cheyenne Water Supply Level II Project, Nov, 1996
CH2M Hill, Cheyenne Aquifer Storage Recovery Test Project, Jun, 1998
ECI, Cheyenne South Crow Diversion Project Phase II, Final Report, Aug, 2000
ECI, Cheyenne South Crow Diversion Project Phase II, Final Report, Executive Summary, Aug, 2000
ECI, Cheyenne Hydropower Feasibility Study Level II, Executive Summary, Oct, 2003
ECI, Cheyenne Hydropower Feasibility Study Level II, Final Report, Oct, 2003
JR Engineering, Cheyenne Belvoir Ranch Level II Study, Executive Summary, Dec, 2005 (5,082 kb)
JR Engineering, Cheyenne Belvoir Ranch Level II Study, Final Report, Dec, 2005 (12,799 kb)
JR Engineering, Cheyenne Belvoir Ranch Level II Study Appendix D, Dec, 2005 (28,242 kb)
JR Engineering, Cheyenne Belvoir Ranch Level II Study, Phase III-V, Executive Summary, Sep, 2007 (257 kb)
JR Engineering, Cheyenne Belvoir Ranch Level II Study, Phase III-V, Final Report, Sep, 2007 (38,855 kb)
JR Engineering, Belvoir Wells No. 5 & 6 Pumping Test Report, Aquifer Impact Report, Oct, 2007 (211,404 kb)

Chugwater
States West Water Resources Corporation, Town of Chugwater Water Supply Master Plan Level I Project, Dec, 1996

Church Reservoir
States West Water Resources Corporation, Executive Summary for the Green River ASR and Alternate Storage Project, Church Reservoir Investigation, Dec, 2002
States West Water Resources Corporation, Final Report for the Green River ASR and Alternate Storage Project, Church Reservoir Investigation, Dec, 2002

Clarks Fork
Wyoming Water Development Commission, Pre-Level I Analysis of Water Development Potential, Clarks Fork River, Jan, 1983

Clear Creek
JFC Engineers/Surveyors, Report on the Instream Flow Feasibility for Clear Creek Segment #1, Clear Creek Segment #2, Final Report, Aug, 2005 (13,386 kb)

Clearview
Johnson-Fermelia Company, Inc., Domestic Water System Evaluation for Clearview Improvement and Services District, Final Report, Sep, 1989

Cody
J.M. Montgomery, Consulting Engineers, A Report on Lakeview Irrigation District Consumptive Use and Irrigation Demand at Cody, Wyoming, Apr, 1985
J.M. Montgomery, Consulting Engineers, A Report on Lakeview Irrigation District Value of Production with a Normal and Inadequate Water Supply at Cody, Wyoming, Jun, 1985
J.M. Montgomery, Consulting Engineers, Cody-Lakeview Irrigation Exchange Evaluation Draft Report, Oct, 1985
J.M. Montgomery, Consulting Engineers, Cody-Lakeview Irrigation Exchange Project Level II Investigation Report, Jan, 1986
Engineering Associates, Cody Area Level II Water Supply Project, Executive Summary, May, 1996
Engineering Associates, Cody Area Level II Water Supply Project, Final Report, May, 1996
Aqua Engineering, Inc., Cody Canal Irrigation District Rehabilitation and Hydropower Level II Study, Executive Summary, May, 2006 (280 kb)
Aqua Engineering, Inc., Cody Canal Irrigation District Rehabilitation and Hydropower Level II Study, Final Report, May, 2006 (6,843 kb)
Aqua Engineering, Inc., Cody Canal Irrigation District Rehabilitation and Hydropower Level II Study, Appendices, May, 2006 (52,172 kb)

Cokeville
Johnson-Fermelia Company, Inc., Phase 1 Report, Cokeville Water Supply Study Project Level I, Executive Summary, Nov, 1991
Johnson-Fermelia Company, Inc., Phase 1 Report, Cokeville Water Supply Study Project Level I, Nov, 1991
Forsgren Associates, Cokeville Water Supply Level II Study, Executive Summary, Nov, 1993
Forsgren Associates, Cokeville Water Supply Level II Study, Final Report, Nov, 1993
Forsgren Associates, Cokeville Water Supply Level II Study, Supplemental Reports, Nov, 1993
Lidstone & Anderson, Inc, Cokeville Tri-Diversion Structures, Level II Project, Executive Summary, Nov, 1995
Lidstone & Anderson, Inc, Cokeville Tri-Diversion Structures, Level II Project, Final Report, Nov, 1995
Sunrise Engineering, Executive Summary for Cokeville Reservoir Level I Study, Aug, 2004
Sunrise Engineering, Cokeville Reservoir Level I Study Final Report, Aug, 2004

Cook Road
HKM Associates, Final Report for a Proposed Water Supply System for Cook Road Water District, Campbell County, Wyoming, Oct, 1992
Soda Butte Services, Inc., Construction and Testing of CRWD-1 Well and Conceptual Design and Cost Estimation for Cook Road Water Supply Project Level II, Executive Summary, Jan, 1994
Soda Butte Services, Inc., Construction and Testing of CRWD-1 Well and Conceptual Design and Cost Estimation for Cook Road Water Supply Project Level II, Final Report, Jan, 1994

Corbett Dam
Harza, Corbett Dam and Tunnel Rehabilitation Study, Final Report to Shoshone and Deaver Irrigation District and Wyoming Water Development Commission, Sep, 1983

Corn Creek
CH2M Hill, Progress Report for the Corn Creek Irrigation Project, Jan, 1983
CH2M Hill, Interim Report for the Corn Creek Irrigation Project, May, 1983
CH2M Hill, Final Environmental Assessment, Corn Creek Irrigation Project, Nov, 1983

Corner Mountain
Coffey & Associates, Corner Mountain Water Supply Project, Water Supply Alternatives, Level I, Final Report, Nov, 1995
Coffey & Associates, Corner Mountain Water Supply Project, Water Supply Alternatives, Level I, Executive Summary, Nov, 1995
Coffey & Associates, Corner Mountain Water Supply Project Level II, Executive Summary, Sep, 1999
Coffey & Associates, Corner Mountain Water Supply Project Level II, Final Report, Sep, 1999
Coffey & Associates, Corner Mountain Water Supply Project Level II, Phase III, Jun, 2001

Cottonwood-Grass Creek
Short Elliott Hendrickson Inc., Cottonwood/Grass Creek Watershed Management Plan Level I Study, Executive Summary, Oct, 2007
Short Elliott Hendrickson Inc., Cottonwood/Grass Creek Watershed Management Plan Level I Study, Final Report, Oct, 2007

Cottonwood Lake
Sunrise Engineering, Cottonwood Lake Enlargement Level II Study, Executive Summary, Oct, 2006 (509 kb)
Sunrise Engineering, Cottonwood Lake Enlargement Level II Study, Oct, 2006 (22,797 kb)

Cowley
Western Water Consultants, Town of Cowley Ground Water Development Feasibility Study, Sep, 1982
Western Water Consultants, Final Report on Drilling and Testing Madison #1 Well for the Town of Cowley, Big Horn County, Wyoming, Oct, 1983

Crazy Woman Watershed
HKM Associates, Crazy Woman Watershed Project Level II, Phase I, Rehabilitation Plan and Phase II Conceptual Design and Cost Estimates, Executive Summary, Nov, 1991
HKM Associates, Crazy Woman Watershed Project Level II, Phase I, Rehabilitation Plan and Phase II Conceptual Design and Cost Estimates, Final Report, Nov, 1991

Crestview-Antelope Valley
Wester-Wetstein & Associates, Crestview/Antelope Valley Water Supply Project Level II, Final Report, Oct, 1999
Wester-Wetstein & Associates, Crestview/Antelope Valley Water Supply Project Level II, Executive Summary, Nov, 1999

Crook County
ESA Geotechnical Consultants, Crook County Reservoir Project Level I, Executive Summary, Jul, 1999
ESA Geotechnical Consultants, Crook County Reservoir Project Level I, Final Report, Jul, 1999
Short Elliott Hendrickson Inc., Crook County Reservoirs and Water Management Study Level I, Executive Summary, Feb, 2006
Short Elliott Hendrickson Inc., Crook County Reservoirs and Water Management Study Level I, Final Report, Feb, 2006

Crow Creek
Parsons-Brinckeroff, Prefeasibility Study of Crow Creek Hydroelectric Project (Draft), Dec, 1986
States West Water Resources Corporation, Crow Creek Flood Control Project, Level II Evaluation, Nov, 1989
States West Water Resources Corporation, Crow Creek Groundwater Recharge Project, Level II Evaluation, Mar, 1990
States West Water Resources Corporation, Crow Creek Flood Control and Groundwater Recharge Project Level II, Phase IA Evaluation, Mar, 1990
States West Water Resources Corporation, Crow Creek Flood Control and Groundwater Recharge Project, Executive Summary, Mar, 1990

Crowheart Area-Dinwoody
Nelson Engineering, Crowheart Area/Dinwoody Canal System Level I Study, Final Report, Sep, 2005
Nelson Engineering, Crowheart Area/Dinwoody Canal System Level I Study, Executive Summary, Sep, 2005
Nelson Engineering, Crowheart Area-Dinwoody Canal System Level II Study, Final Report, Dec, 2007
Nelson Engineering, Crowheart Area-Dinwoody Canal System Level II Study, Executive Summary, Dec, 2007

Crystal Lake and Granite Springs
Woodward-Clyde Consultants, Engineering and Environmental Evaluation, Crystal Lake and Granite Springs Dams, Laramie County, Wyoming, Dec, 1983

Dayton
EnTech, Inc, Dayton Master Plan Level I Study, Final Report, Nov, 2000
EnTech, Inc, Dayton Master Plan Level I Study, Executive Summary, Nov, 2000
EnTech, Inc, Executive Summary for Dayton Water Supply Project Level II Study, Nov, 2001
EnTech, Inc, Final Report for Dayton Water Supply Project Level II Study, Nov, 2001
EnTech, Inc, Final Report for Dayton Water Supply Project Level II Study, Appendix, May, 2002
EnTech, Inc, Executive Summary for Dayton Groundwater Exploration Project, Apr, 2003
EnTech, Inc, Final Report for Dayton Groundwater Exploration Project, Apr, 2003
EnTech, Inc, Final Report for Dayton Groundwater Exploration Project Acid Enhancement Program Level II Study Supplement, Jan, 2004

Deaver
Engineering Associates, Deaver Irrigation Rehabilitation Project Level II Study, Executive Summary, Nov, 2002
Engineering Associates, Deaver Irrigation Rehabilitation Project Level II Study, Final Report, Nov, 2002

Deer Creek
RW Beck and Associates, Deer Creek Project Feasibility Report, Volume 2 Appendices, Feb, 1984
RW Beck and Associates, Deer Creek Project Feasibility Report, Volume 1, Feb, 1984
Banner Associates, Inc, Deer Creek Level III, Executive Summary, Nov, 1984
Banner Associates, Inc, Deer Creek Level III Interim and Design Concept Report, Nov, 1984
Banner Associates, Inc, Deer Creek Level III Appendix 1: Hydrology Data and Computer Printouts, Nov, 1984
Banner Associates, Inc, Deer Creek Level III Appendix 2: Geological and Geotechnical Reports, Nov, 1984
Banner Associates, Inc, Deer Creek Dam Project, Appendix A: Technical Data-Subsurface Investigations, May, 1986
Banner Associates, Inc, Contract Documents and Specifications for Deer Creek Dam, May, 1986
Wyoming Recreation Commission, Recreation Benefits and Costs of the Proposed Deer Creek Reservoir, Apr, 1984
Wyoming Recreation Commission, Recreation Benefits and Costs of the Proposed Deer Creek Reservoir, Summary, Apr, 1984

Dixon
Lidstone & Anderson, Inc, Town of Dixon Water Supply Project Level I, Oct, 1991
Lidstone & Anderson, Inc, Dixon Water Supply Project Level I Study, Final Report, Nov, 1991
Lidstone & Anderson, Inc, Town of Dixon Water Supply Project Level I, Final Report, Executive Summary, Nov, 1991
Lidstone & Anderson, Inc, Executive Summary for Dixon Water Supply Project Level II, Jan, 1994
Lidstone & Anderson, Inc, Final Report for Dixon Water Supply Project Level II, Jan, 1994

Douglas
Sear-Brown Group, City of Douglas Water System Master Plan Level I, Jul, 1998
Civil Engineering Professionals, Inc., Executive Summary, Douglas Water Supply Rehabilitation Project Level II Study, Oct, 1999
Civil Engineering Professionals, Inc., Final Report, Douglas Water Supply Rehabilitation Project Level II Study, Oct, 1999

Downer
HKM Engineering, Downer Neighborhood Water Supply Level II, Executive Summary, Nov, 1998
HKM Engineering, Downer Neighborhood Water Supply Level II, Final Report, Nov, 1998

Dry Fork-Little Big Horn Creek
JFC Engineers/Surveyors, Report on the Instream Flow Feasibility for Dry Fork Tributary of the Little Big Horn Creek Segment, Final Report, Oct, 2004

Dubois
Nelson Engineering, Town of Dubois Groundwater Exploration Program, Final Report, Jan, 1992
James Gores and Associates, P.C., Dubois Area Water Master Plan Level I, Executive Summary, May, 1999
James Gores and Associates, P.C., Dubois Area Water Master Plan Level I, Final Report, May, 1999
Stetson Engineering, Inc, Level II Report Town of Dubois Water Supply Study Final, Aug, 2004
Stetson Engineering, Inc, Executive Summary for Dubois Water Supply Extended Level II Study, Feb, 2007 (4,837 kb)
Stetson Engineering, Inc, Dubois Test Well Drilling Project, Dubois Water Supply Extended Level II Study, Feb, 2007 (9,382 kb)

Edgerton-Midwest
TriHydro Corporation, Water Supply Project for the Towns of Edgerton and Midwest, Executive Summary, Mar, 1988
TriHydro Corporation, Water Supply Project for the Towns of Edgerton and Midwest, Report of Investigation, Mar, 1988
Worthington, Lenhart, Carpenter & Johnson, Edgerton/Midwest Water Supply Project Level II Conceptual Design Report, Dec, 1988
Worthington, Lenhart, Carpenter & Johnson, Edgerton/Midwest Water Supply Project Level II , Executive Summary, Jan, 1989
Worthington, Lenhart, Carpenter & Johnson, Edgerton/Midwest Water Supply Project Level II Conceptual Design Report Task 15, Alternative Water Source Evaluation, Aug, 1989
Western Water Consultants, Pre-Design Report and Cost Estimates for the Edgerton-Midwest Reverse Osmosis Plant, Aug, 1990
Worthington, Lenhart, Carpenter & Johnson, Level II Conceptual Design Report Task 10, Downsizing of the Edgerton/Midwest Water Supply Project, Aug, 1991

Eight Mile High
Wester Wetstein & Associates, Eight Mile High Plains Well Project Level II, Dec, 2004
Wester Wetstein & Associates, Report on the Eight Mile-High Plains Well Project Level II, Phase II, Feb, 2006
Wester Wetstein & Associates, Executive Summary of the Report on the Eight Mile-High Plains Well Project Level II, Phase II, Feb, 2006

Elk Mountain
Weston Engineering, Inc., Elk Mountain Water Supply Master Plan, Level I Report, Mar, 1995
Weston Engineering, Inc., Elk Mountain Water Supply Master Plan, Executive Summary, Mar, 1995
Weston Engineering, Inc., Elk Mountain Water Supply Project, Executive Summary, Dec, 1995
Weston Engineering, Inc., Elk Mountain Water Supply Project, Level II Final Report, Dec, 1995

Encampment
Howard Needles Tammen & Bergendoff, Level II Feasibility Study, Water Supply for Town of Encampment, Phase 1 Status Report, Evaluate Existing Water Supply, Oct, 1982
Howard Needles Tammen & Bergendoff, Level II Feasibility Study, Water Supply for Town of Encampment, Phase 2 Status Report, Identify and Prioritize Additional Water Supply Alternatives, Nov, 1982
Howard Needles Tammen & Bergendoff, Water Supply for Town of Encampment Level II Feasibility Study, Final Report, Apr, 1984
PMPC, Executive Summary, Level II Feasibility Study, Encampment Water Supply System, Nov, 1997
PMPC, Final Report, Level II Feasibility Study, Encampment Water Supply System, Nov, 1997
PMPC, Encampment Sierra Madre Well Level II Study, Summary Report, May, 2007

Etna
Lidstone & Anderson, Inc, Etna Diversion Dam Project Level II Study, Final Report, Oct, 1990
Lidstone & Anderson, Inc, Etna Diversion Dam Project Level II Study, Executive Summary, Oct, 1990

Evanston
Sunrise Engineering, Evanston Water System Master Plan Level II Study, Executive Summary, Nov, 1997
Sunrise Engineering, Evanston Water System Master Plan Level II Study, Nov, 1997
Sunrise Engineering, Evanston/Bear River Regional Pipeline Level II Study, Jul, 2005
Sunrise Engineering, Evanston/Bear River Regional Pipeline Level II Study, Executive Summary, Jul, 2005

Evansville
MSM Consultants, Evansville Groundwater Availability Study, Aug, 1982
Howard Needles Tammen & Bergendoff, Water Development Program for Town of Evansville, Natrona County, Wyoming, Feasibility Study, May, 1985
Howard Needles Tammen & Bergendoff, Evansville Casper Water System Final Feasibility Study, Jul, 1986
James M. Montgomery, Consulting Engineers, Evansville Groundwater Supply Project, Final Report, Jun, 1990

Farson
Johnson-Fermelia Company, Inc., Farson Water Supply Study, Level I, Final Report, Oct, 1990
Johnson-Fermelia Company, Inc., Farson Water Supply Study, Level I, Executive Summary, Oct, 1990

Fayette
Rio Verde Engineering, Fayette Irrigation District Rehabilitation Project, Final Report, Oct, 1999
Rio Verde Engineering, Fayette Irrigation District Rehabilitation Project, Executive Summary, Nov, 1999

Ferris Ditch
Eastern Wyoming Engineering and Surveying, Ferris Ditch Diversion Rehabilitation Project, Phase I Report, June 9, 1989, Jun, 1989
Eastern Wyoming Engineering and Surveying, Ferris Ditch Diversion Rehabilitation Project, Phase II Report, Final Report, Oct, 1989
Kennedy Engineering, Ferris Irrigation District Canal Improvements Project Level II Feasibility Report, Dec, 1990

Fish Creek
Rollins Brown and Gunnell, Fish Creek Dam, Geotechnical Study and Alternative Evaluations, Sep, 1984
Stone and Webster Engineering, Fish Creek Collection System Progress Report on the North Platte River Studies, Apr, 1986
Stone and Webster Engineering, Fish Creek Collection System, Interim Phase I Concept Design Report, Nov, 1986
Stone and Webster Engineering, Fish Creek Collection System Interim Phase I Concept Design, Report, Executive Summary, Nov, 1986

Frannie
Western Water Consultants, Potential Water-Well Sites for the Towns of Frannie and Deaver, Wyoming, Feb, 1985
Western Water Consultants, Final Report, Drilling and Testing of Frannie-Deaver Test Well #1, Sep, 1986
Falcon Consulting Services L.L.C., Frannie Well Rehabilitation Level II Study (Kirk #1) Frannie, Wyoming, Final Report, Oct, 2005

Freedom
TriHydro Corporation, Construction and Testing Report Freedom No. 2 Test Well Freedom, Wyoming, Feb, 1993

Fremont Lake Dam
Rio Verde Engineering, Rehabilitation of Fremont Lake Dam, Sep, 1980

Gillette
James M. Montgomery, Consulting Engineers, City of Gillette Madison Well Field, Well M-3 Enhancement, May, 1992
HKM Associates, Phase I Interim Report for Gillette Area Master Plan, Gillette, Wyoming, May, 1993
HKM Associates, Phase II Final Report for Gillette Area Master Plan, Gillette, Wyoming, Feb, 1994
Wester Wetstein & Associates, Report for Gillette Wells Project Level II Feasibility Study-Rehabilitation, Nov, 1994
Wyoming State Engineer's Office, Fort Union Formation Aquifer Monitoring Plan and Preliminary Aquifer Management Plan, Nov, 1995
Stetson Engineering, Inc, City of Gillette Water System Evaluation, Executive Summary, Oct, 1999
Stetson Engineering, Inc, City of Gillette Water System Evaluation, Report, Oct, 1999
Wester Wetstein & Associates, Coal Bed Methane-Aquifer Storage and Retrieval Project Level II, Interim Report, Sep, 2003
Wester Wetstein & Associates, Coal Bed Methane-Aquifer Storage and Retrieval Project Level II Southern Ft. Union Well Field Exploration Program and Development Study, Executive Summary, Dec, 2004
Wester Wetstein & Associates, Coal Bed Methane-Aquifer Storage and Retrieval Project Level II Southern Ft. Union Well Field Exploration Program and Development Study, Final Report, Dec, 2004

Glendo
Morrison-Maierle, Inc., Glendo Groundwater Exploration Program Feasibility Study, Mar, 1984
Hibsman & Associates, Water Transmission System Level II Feasibility Study, Final Report, Nov, 1990

Glenrock
Nelson Engineering, A Plan to Drill and Test a Water Well South of the Town of Glenrock, Wyoming, Dec, 1982
Nelson Engineering, Glenrock Water Supply Design Report (Draft), Nov, 1985
Nelson Engineering, Glenrock Water Supply Design Report, Jan, 1986
Sunrise Engineering, Glenrock Raw Water Irrigation Project Level II Study, Phase 1, Oct, 1998
Sunrise Engineering, Glenrock Raw Water Irrigation Project Level II Study, Phase 1 Executive Summary, Oct, 1998
Sunrise Engineering, Glenrock Water Source Project Level II Study, Phase II, Executive Summary, Feb, 2000
Sunrise Engineering, Glenrock Water Source Project Level II Study, Phase II, Final Report, Feb, 2000
Weston Engineering, Inc., Glenrock Level II Well and Tank Feasibility Study, Interim Report, Oct, 2005
Weston Engineering, Inc., Glenrock Well and Tank Project Level II Feasibility Study, Water Tank and Pipeline Improvements, Interim Report, Jun, 2006
Weston Engineering, Inc., Glenrock Test Well No. 7 Groundwater Monitoring Report, Aug, 2007
Weston Engineering, Inc., Glenrock Level II Well and Tank Feasibility Study, Final Report, Oct, 2007
Weston Engineering, Inc., Glenrock Level II Well and Tank Feasibility Study, Executive Summary, Oct, 2007

Globe Canal
James Gores and Associates, P.C., Globe Canal Investigations Level II Rehabilitation Plan, Dec, 1989
James Gores and Associates, P.C., Globe Canal Investigations Level II, Executive Summary, Aug, 1990
James Gores and Associates, P.C., Globe Canal Investigations Level II, Final Report, Aug, 1990

Gooseberry Creek
Leonard Rice Consulting Water Engineers, Inc, Gooseberry Creek Water Resources Study, Jan, 1983
Western Water Consultants, Gooseberry Creek Water Development Project Level II Feasibility Study, Final Report, Feb, 1984
Western Water Consultants, Gooseberry Creek Water Development Project Level II Feasibility Study, Final Report, Appendices, Feb, 1984
Western Water Consultants, Feasibility Report for Formation of Gooseberry Creek Irrigation District, Gooseberry Creek Water Development Project, Apr, 1984
Morrison-Knudsen Engineers, Inc., Phase I Interim Report, Gooseberry Creek Level III Study, Feb, 1985
International Engineering Company, Inc, Phase I, Part II, Gooseberry Creek Interim Report, Level III Project, Jan, 1986
International Engineering Company, Inc, Gooseberry Level III Project, Executive Summary, Jan, 1986
Morrison-Knudsen Engineers, Inc., Gooseberry Level III Project, Phase II Summary Report, Feb, 1987
Lidstone & Associates, Inc, Gooseberry Creek Level I Study, Oct, 2005
Lidstone & Associates, Inc, Gooseberry Creek Level I Study, Executive Summary, Oct, 2005
Lidstone & Associates, Inc, Gooseberry Creek Storage Level II Study, Final Report, Feb, 2007 (98,753 kb)
Lidstone & Associates, Inc, Gooseberry Creek Storage Level II Study, Executive Summary, Feb, 2007

Goshen
Kennedy Engineering, Final Report on Goshen Irrigation District Rehabilitation Project, Nov, 1985
Lidstone & Anderson, Inc, Goshen Irrigation District Rehabilitation Project Level II, Final Report, Dec, 1991
Lidstone & Anderson, Inc, Goshen Irrigation District Rehabilitation Project Level II, Executive Summary, Dec, 1991
Lidstone & Anderson, Inc, Goshen Irrigation District Level II Rehabilitation Project, Siphons, Tunnels and Canal Evaluation, Final Report, Oct, 1992
Lidstone & Anderson, Inc, Goshen Irrigation District Level II Rehabilitation Project, Siphons, Tunnels and Canal Evaluation, Executive Summary, Oct, 1992
Lidstone & Anderson, Inc, Goshen Irrigation District Horse Creek Re-Regulating Reservoir, Level II Project, Executive Summary, Dec, 1993
Lidstone & Anderson, Inc, Final Report for Goshen Irrigation District Horse Creek Re-Regulating Reservoir, Level II Project, Dec, 1993
Lidstone & Anderson, Inc, Goshen Hole and Goshen Mutual Irrigation Canal Companies, Executive Summary, Jan, 1999
Lidstone & Anderson, Inc, Goshen Hole and Goshen Mutual Irrigation Canal Companies, Final Report, Jan, 1999
Anderson Consulting Engineers, Inc., Goshen Irrigation District Rehabilitation Project Level II, Executive Summary, Nov, 1999
Anderson Consulting Engineers, Inc., Goshen Irrigation District Rehabilitation Project Level II, Final Report, Nov, 1999

Granger
ARIX Corporation, Town of Granger, Wyoming Water Supply Project Level II Feasibility Study, Executive Summary, May, 1990
ARIX Corporation, Town of Granger, Wyoming Water Supply Project Level II Feasibility Study, May, 1990
Forsgren Associates, Granger Water Supply Master Plan Level I, Final Report, Oct, 2000
Forsgren Associates, Granger Rehabilitation Project Level II, Executive Summary, Dec, 2002
Forsgren Associates, Granger Rehabilitation Project Level II, Final Report, Dec, 2002

Green River
Western Wyoming College, WWC Water Quality Laboratory, Green River Basin Project, Jan, 1982
Larry Pochop, Robert Burman, Development of Evapotranspiration Crop Coefficients and Climatological Data and Evapotranspiration Models for the Upper Green River, Mar, 1987
JFC Engineers/Surveyors, Final Report on the Green River Tributaries #2 Instream Flow, Book 1 of 2, Dec, 2000
JFC Engineers/Surveyors, Final Report on the Green River Tributaries #2 Instream Flow, Book 2 of 2 (Maps, Exhibits, Appendices), Dec, 2000
States West Water Resources Corporation, Green River Basin Plan, Executive Summary, Jan, 2001
States West Water Resources Corporation, Green River Basin Plan, Final Report, Jan, 2001
States West Water Resources Corporation, Green River Basin Plan, Technical Memoranda, Jan, 2001
States West Water Resources Corporation, Green River Basin Plan, Technical Memoranda--AA, Irrigation Diversion Operation and Description , Jan, 2001
States West Water Resources Corporation, Executive Summary for Green River Ground Water Recharge and Alternate Storage Level I Project, Dec, 2001
States West Water Resources Corporation, Final Report for Green River Ground Water Recharge and Alternate Storage Level I Project, Dec, 2001
States West Water Resources Corporation, Executive Summary for the Green River ASR and Alternate Storage Project, Church Reservoir Investigation (see Church), Dec, 2002
States West Water Resources Corporation, Final Report for the Green River ASR and Alternate Storage Project, Church Reservoir Investigation (see Church), Dec, 2002
Nelson Engineering, Green River Supply Canal Report Phase I, Nov, 2003
Nelson Engineering, Green River Supply Canal Report Phase II, Conceptual Design-Rehabilitation, Dec, 2004
Nelson Engineering, Green River Supply Canal Report Seepage Study Report, Dec, 2004
Nelson Engineering, Final Report, Green River, Rock Springs, Sweetwater County, Joint Powers Water Board, Master Plan, Level I Study, Jan, 2007

Greybull
John W. Donnell & Associates, Application for Exploration and Feasibility Study Underground Water Supply for Town of Greybull, Wyoming, Aug, 1981
John W. Donnell & Associates, Feasibility Study on Supplementary Groundwater Supply for Town of Greybull, Wyoming, Jun, 1982
John W. Donnell & Associates, Town of Greybull Specifications and Contract Documents for Artesian Water Supply Well, Sep, 1982
Big Horn Engineering, Final Report on Groundwater Exploration Program for Town of Greybull, Wyoming, Sep, 1983
GEI Consultants, Phase I Draft Summary Report, Greybull Valley Dam and Reservoir Project, Jan, 1991
GEI Consultants, Phase II Summary Report, Enclosures 1 Through 3, Greybull Valley Dam and Reservoir Project, Aug, 1991
GEI Consultants, Greybull Valley Dam and Reservoir Project Level II, Phase III, Draft Conceptual Design Report, Aug, 1992
Bureau of Reclamation, Greybull Valley Dam and Reservoir, Wyoming, Economic Evaluation, Jan, 1994
GEI Consultants, Greybull Valley Dam and Reservoir Project Level II, Phase V, Executive Summary, Conceptual Design Report, Aug, 1994
GEI Consultants, Greybull Valley Dam and Reservoir Project Level II, Phase V, Final Report, Conceptual Design Report, Aug, 1994
Nelson Engineering, Greybull Water Supply Project Level II, Executive Summary, Nov, 1995
Nelson Engineering, Greybull Water Supply Project Level II, Final Design Report, Nov, 1995
Nelson Engineering, Greybull Water Supply Project Level II, Phase II and III, Exploration Well and Conceptual Design, Executive Summary, Sep, 1997
Nelson Engineering, Greybull Water Supply Project Level II, Phase II and III, Exploration Well and Conceptual Design, Final Report, Sep, 1997
Engineering Associates, Town of Greybull Water Supply Project Level II, Executive Summary, Apr, 1998
Engineering Associates, Town of Greybull Water Supply Project Level II, Final Report, Apr, 1998
ECI, Executive Summary Greybull Hydropower Study Level II Project, Mar, 2003
ECI, Final Greybull Hydropower Study Level II Project, Apr, 2003
Engineering Associates, Level II Study, Town of Greybull Raw Water Supply Project, Executive Summary, May, 2003
Engineering Associates, Level II Study, Town of Greybull Raw Water Supply Project, Final Report, May, 2003
Engineering Associates, Level II Study, Town of Greybull Raw Water Supply Project, Environmental Report, Jun, 2003
Rio Verde Engineering, Reports on the Feasibility of Providing Instream Flows on Greybull River Tributaries, Apr, 2006
Wyoming Groundwater, LLC, Greybull Wells Rehabilitation Level II Study, Well Evaluation, Rehabilitation, and Testing, Greybull Water Transmission Pipeline Evaluation Well Sitting Study, Executive Summary, Nov, 2006
Wyoming Groundwater, LLC, Greybull Wells Rehabilitation Level II Study, Well Evaluation, Rehabilitation, and Testing, Greybull Water Transmission Pipeline Evaluation Well Sitting Study, Volume I of II, Nov, 2006
Wyoming Groundwater, LLC, Greybull Wells Rehabilitation Level II Study, Well Evaluation, Rehabilitation, and Testing, Greybull Water Transmission Pipeline Evaluation Well Sitting Study, Volume II of II, Nov, 2006

Guernsey
Lidstone & Anderson, Inc, Final Report, Analysis of the Guernsey Reservoir Silt Run, Jan, 1993
TST Inc., Executive Summary, Town of Guernsey, WY Water Supply Master Plan, Level I, Nov, 1995
TST Inc., Guernsey Water Supply Master Plan, Level I Final, Nov, 1995
TST Inc., Guernsey Hydraulic Study Level II, Executive Summary, Nov, 2003
TST Inc., Guernsey Hydraulic Study Level II, Final Report, Nov, 2003
TST Inc., Guernsey Hydraulic Study Level II Technical Addendum I, Distribution Analysis & Preliminary Plans, Nov, 2003
TST Inc., Guernsey Hydraulic Study Level II Technical Addendum II, Environmental Impact Report, Nov, 2003

Gunbarrel Lateral Ditch
Kennedy Engineering, Gunbarrel Lateral Ditch Studies, Final Report, Rehabilitation Plan, Preferred Alternate B, Nov, 1995
Kennedy Engineering, Gunbarrel Lateral Ditch Studies, Executive Summary, Rehabilitation Plan, Preferred Alternate B, Nov, 1995

Hams Fork
Greenhorne & O'Mara, Inc., Hams Fork Basin Level II Investigations, Phase I Water Resources Analysis, Nov, 1984
Greenhorne & O'Mara, Inc., Hams Fork Basin Level II Investigations, Executive Summary, Phase I Water Resources Analysis, Nov, 1984

Hanna
Geotechnical Corp, Hanna, Wyoming Application for Ground Water Exploration Grant Funds, Jul, 1981
Black & Veatch, Hanna, Wyoming, Wyoming Water Development Commission Ground Water Exploration Program Progress Report, May, 1982
Black & Veatch, Hanna, Wyoming Groundwater Exploration Program, Wyoming Water Development Commission Exploratory Drilling Report, Apr, 1983
Black & Veatch, Hanna, Wyoming Report on Water Resource Development Alternatives, May, 1984

Hartville
TST Inc., Hartville Water Supply Master Plan Level I, Nov, 1995
TST Inc., Executive Summary, Town of Hartville, WY Water Supply Master Plan Level I, Nov, 1995

Hawk Springs
BRS Inc, Hawk Springs Water Supply Project, Final Report, Mar, 1996
BRS Inc, Hawk Springs Water Supply Project, Executive Summary, Mar, 1996
Banner Associates, Inc, Hawk Springs Reservoir Enlargement Analysis, May, 1992

Heart Mountain
Aqua Engineering, Inc., Heart Mountain Irrigation District Return Flow Level I Study, Executive Summary, May, 2006
Aqua Engineering, Inc., Heart Mountain Irrigation District Return Flow Level I Study, Final Report, May, 2006
Engineering Associates, Heart Mountain Screens Level II Study, Final Report, Apr, 2007 (125,365 kb)
Engineering Associates, Heart Mountain Screens Level II Study, Executive Summary, Apr, 2007 (203 kb)

Hidden Hills
EnTech, Inc, Final Report for Hidden Hills Water System Level I Study, Dec, 2001

Hidden Valley
Anderson Consulting Engineers, Inc., Final Report for Hidden Valley Pipeline Level II Feasibility Study, Nov, 2003
Anderson Consulting Engineers, Inc., Executive Summary for Hidden Valley Pipeline Level II Feasibility Study, Nov, 2003

High Savery
Wyoming Water Development Commission, High Savery Dam and Reservoir 2004 Monitoring Report, Jan, 2004
West, Inc, High Savery Reservoir Wetland Mitigation Monitoring Report, Appendix B, Photographs of Savery Wetland Mitigation Sites, Jan, 2004

Highland Hanover
Centennial Engineering & Research, Inc., Rehabilitation Feasibility Study, Highland Hanover Irrigation District, Final Report, Nov, 1988
Centennial Engineering & Research, Inc., Rehabilitation Feasibility Study, Highland Hanover Irrigation District, Executive Summary, Nov, 1988

Highline Canal
Sage Civil Engineering, Executive Summary of Final Report for the Highline Canal Level II, Nov, 2002
Sage Civil Engineering, Final Report for the Highline Canal Level II, Nov, 2002

Highline Ditch
Western Water Consultants, Highline Ditch Rehabilitation Project Level II Feasibility Study, Executive Summary, Oct, 1987
Western Water Consultants, Highline Ditch Rehabilitation Project Level II Feasibility Study, Oct, 1987

Highline Watershed
Anderson Consulting Engineers, Inc., Highline Watershed Improvement District Ditch Rehabilitation Project Level II, Final Report, Nov, 1999
Anderson Consulting Engineers, Inc., Highline Watershed Improvement District Ditch Rehabilitation Project Level II, Executive Summary, Nov, 1999

Hill Irrigation District
Lidstone & Anderson, Inc, Hill Irrigation District Improvements Level II Project, Final Report, Oct, 1997
Lidstone & Anderson, Inc, Hill Irrigation District Improvements Level II Project, Executive Summary, Oct, 1997

Hoback Junction
Nelson Engineering, Hoback Junction Water Supply Study Level I, Final Report Executive Summary, Mar, 2006
Nelson Engineering, Hoback Junction Water Supply Study Level I, Final Report, Mar, 2006

Horse Creek
Dames & Moore, Geotechnical Engineering Site Comparison Feasibility Level, Horse Creek Reservoir Project Near Torrington, Wyoming, Sep, 1986
HDR Infrastructure, Inc, Horse Creek Reservoir Level II Study, Executive Summary, Nov, 1986
HDR Infrastructure, Inc, Horse Creek Reservoir Level II Study, Final Report, Nov, 1986
PMPC, Horse Creek Conservation District Improvements Project Level II, Final Report, Dec, 1998
PMPC, Horse Creek Conservation District Improvements Project Level II, Executive Summary, Dec, 1998

Hot Springs
BRS Inc, Hot Springs Rural-Worland Pipeline Interim Report, Regional Water Supply Project Level II, Sep, 2002
Lidstone & Associates, Inc, Hot Springs State Park Master Plan Level I, Final Report, Feb, 2003
Lidstone & Associates, Inc, Hot Springs State Park Master Plan Level I, Executive Summary, Feb, 2003
Forsgren Associates, Hot Springs Rural-Worland Pipeline Regional Water Supply Project Level II Study, Final Report, Nov, 2004
Forsgren Associates, Hot Springs Rural-Worland Pipeline Regional Water Supply Project Level II Study, Executive Summary, Nov, 2004

Hudson
Morrison-Mairle, Inc, Phase I Feasibility and Phase II Groundwater Exploration Program, Town of Hudson, Jun, 1985

Hugus Mullison Ditch
PMPC, Hugus Mullison Ditch Project Level I, Final Report, Nov, 1999
PMPC, Hugus Mullison Ditch Project Level I, Executive Summary, Nov, 1999
PMPC, Hugus Mullison Ditch Rehabilitation Project Level II, Executive Summary, Nov, 2000
PMPC, Hugus Mullison Ditch Rehabilitation Project Level II, Final Report, Nov, 2000

Hulett
Bearlodge Ltd, Inc., Hulett Water Supply Level II, Final Report, Volume 2, Dec, 1991
Bearlodge Ltd, Inc., Hulett Water Supply Level II, Executive Summary, Dec, 1991
Bearlodge Ltd, Inc., Hulett Water Supply Level II, Final Report, Volume 1, Dec, 1991

Hunt Canal
Nelson Engineering, Hunt Canal Rehabilitation Project Level II, Final Design Report, Dec, 1989
Nelson Engineering, Hunt Canal Rehabilitation Project Level II, Executive Summary, Dec, 1989

Hyattville
Lidstone & Associates, Inc, Town of Hyattville Water Supply Project Level I Master Plan Report, Dec, 2002
Wester Wetstein & Associates, Hyattville Water Supply Level II Project, Executive Summary, Oct, 2006
Wester Wetstein & Associates, Hyattville Water Supply Level II Project, Final Report, Nov, 2006

Indian Springs
Hibsman & Associates, Indian Springs Improvement and Service District Level II Feasibility Study, Data Compilation, Water Transmission and Distribution System, Oct, 1991

Iron Creek
Harza, Level II Feasibility Study, Iron Creek Project Shoshone Irrigation District and Wyoming Water Development Commission, Aug, 1982
Harza, Interim Report to Shoshone and Heart Mountain Irrigation Districts and Wyoming Water Development Commission, Iron Creek Project Level II Feasibility Study, Dec, 1982

Jackson
Nelson Engineering, Jackson Water Feasibility Study, Oct, 1984
Nelson Engineering, Jackson Groundwater Exploration Program, Dec, 1993
Jorgenson Engineering, Rafter J Water Supply Level II Study, Final, Nov, 1998
Jorgenson Engineering, Rafter J Water Supply Level II Study, Executive Summary, Nov, 1998

Jon's Drop
Dahlgren Consulting, Inc, Jon's Drop Hydropower Level II Study, Executive Summary, Oct, 2006
Dahlgren Consulting, Inc, Jon's Drop Hydropower Level II Study, Final Report, Oct, 2006

Kaycee
Western Water Consultants, Ground Water Feasibility Study for Kaycee, Jan, 1983
Western Water Consultants, Final Report on Drilling and Testing of the Town of Kaycee Madison #1 Test Well, Johnson County, Wyoming, Apr, 1984
Grizzly Engineering, Inc, Town of Kaycee Water Supply Master Plan Level I, Oct, 1999
Grizzly Engineering, Inc, Town of Kaycee Water Supply Master Plan Level I, Executive Summary, Oct, 1999
Weston Engineering, Inc., Town of Kaycee Well and Tank Storage Improvements Level II Study, Final Report, Oct, 2006
Weston Engineering, Inc., Town of Kaycee Well and Tank Storage Improvements Level II Study, Executive Summary, Oct, 2006

Kemmerer
MSM Consultants, Groundwater Availability Study Town of Kemmerer, Wyoming Plates, Jan, 1982
MSM Consultants, Town of Kemmerer, Wyoming Groundwater Availability Study Vicinity of Kemmerer, Wyoming, Jul, 1982
MSM Consultants, City of Kemmerer, Wyoming Water Supply Alternatives Level I Reconnaissance Study, Dec, 1982
Greenhorne & O'Mara, Inc., Kemmerer City Reservoir Rehabilitation Project Level II Feasibility Study, Nov, 1986
Greenhorne & O'Mara, Inc., Kemmerer City Reservoir Rehabilitation Project Level II Feasibility Study, Executive Summary, Nov, 1986

Kennington Springs
Keller Associates, Kennington Springs Pipeline Company Level I Water System Reconnaissance Study, Final Report, Nov, 2003
Keller Associates, Kennington Springs Pipeline Company Level I Water System Reconnaissance Study, Executive Summary, Nov, 2003

Kirby
HDR Engineering, Inc., Kirby Dam and Reservoir Level I Reconnaissance Study, Jan, 1990
Sunrise Engineering, Kirby Creek Watershed Plan Level I Study, Executive Summary, Sep, 2005 (2,508 kb)
Sunrise Engineering, Kirby Creek Watershed Plan Level I Study, Final Report, Sep, 2005 (11,389 kb)
Anderson Consulting Engineers, Inc., Executive Summary for Kirby Area Water Supply Level I Study, Sep, 2005
Anderson Consulting Engineers, Inc., Final Report for Kirby Area Water Supply Level I Study, Sep, 2005
Engineering Associates, Level I Study Town of Kirby Water Supply Project, Executive Summary, Apr, 2006
Engineering Associates, Level I Study Town of Kirby Water Supply Project, Final Report, Apr, 2006

Lake Adelaide
ESA Geotechnical Consultants, Shell Valley Watershed Level III, Phase 1, Interim Report on Conceptual Design, Lake Adelaide Enlargement, Executive Summary (see Shell), Jan, 1986
ESA Geotechnical Consultants, Shell Valley Watershed Level III, Phase 1, Interim Report on Conceptual Design, Lake Adelaide Enlargement (see Shell), Jan, 1986
ESA Geotechnical Consultants, Shell Valley Watershed Level III, Phase II, Lake Adelaide Enlargement, Executive Summary (see Shell), Dec, 1986

Lake DeSmet
Texaco, Handout for Wyoming Water Development Commission Regarding the Lake DeSmet Project, Oct, 1982
Texaco, The Lake DeSmet Project, Jul, 1989
HKM Engineering, Lake DeSmet Level II Master Plan and Reservoir Rehabilitation Plan, Executive Summary, Dec, 2003
HKM Engineering, Lake DeSmet Level II Master Plan and Reservoir Rehabilitation Plan, Final Report, Dec, 2003
Lake Engineering Consultants, Inc, Lake DeSmet Level II Master Plan and Reservoir Rehabilitation Plan Phase 2, Final Report, Nov, 2004
Lake Engineering Consultants, Inc, Lake DeSmet Level II Master Plan and Reservoir Rehabilitation Plan Phase 2, Executive Summary, Nov, 2004

Lake Hattie
Western Water Consultants, Lake Hattie Rehabilitation Project Level II, Final Report, Mar, 1986
Western Water Consultants, Feasibility Report for the Formation of the Lake Hattie Irrigation District, Dec, 1986
Western Water Consultants, Lake Hattie Rehabilitation Project Level II, Phase II, Preliminary Designs and Report, Oct, 1987
Western Water Consultants, Lake Hattie Outlet Works Level II Study, Executive Summary, Nov, 2003
Western Water Consultants, Lake Hattie Outlet Works Level II Study, Final Report, Nov, 2003

Lakeview
JM Montgomery, Consulting Engineers, Lakeview Irrigation District Consumptive Use and Irrigation Demand at Cody, Wyoming (see Cody), Apr, 1985
JM Montgomery, Consulting Engineers, Lakeview Irrigation District Value of Production with a Normal and Inadequate Water Supply at Cody, Wyoming (see Cody), Jun, 1985
JFC Engineers/Surveyors, Executive Summary for Lakeview Water Supply Project Level II, Nov, 1998
JFC Engineers/Surveyors, Final Report for Lakeview Water Supply Project Level II, Nov, 1998
JFC Engineers/Surveyors, Addendum to: Final Report for Lakeview Water Supply Project Level II, Dec, 1998

Lance Creek
Western Water Consultants, Lance Creek Water Supply Master Plan Level I, Executive Summary, Nov, 1996
Western Water Consultants, Lance Creek Water Supply Master Plan Level I, Nov, 1996

Lander
ARIX Corporation, Lander Rehabilitation Project Level II Feasibility Study, Phase I, Flood Routing and Incremental Damage Analysis, Executive Summary, Nov, 1987
ARIX Corporation, Lander Rehabilitation Project Level II Feasibility Study, Phase I, Flood Routing and Incremental Damage Analysis, Nov, 1987
ARIX Corporation, Lander Rehabilitation Project Level II Feasibility Study, Phase II, Dec, 1988
ARIX Corporation, Lander Rehabilitation Project Level II Feasibility Study, Phase II, Executive Summary, Dec, 1988
ARIX Corporation, Lander Rehabilitation Project Level II Feasibility Study, Phase II, Geotechnical Investigation and Rehabilitation Plan, Appendix III, Geotechnical Data and Analysis, Dec, 1988
JFC Engineers/Surveyors, Lander Water Supply Master Plan Level I Report, Appendix, Jan, 1996
JFC Engineers/Surveyors, Lander Water Supply Master Plan Level I Report, Jan, 1996
Nelson Engineering, Lander Water Supply Project Level II, Phase II Report, Jul, 1998
Nelson Engineering, Lander Water Supply Project Level II, Phase II Report, Executive Summary, Jul, 1998
GEI Consultants, City of Lander Taylor Ditch Rehabilitation Project Level II Feasibility Study, Phase II Report, Nov, 1998
Nelson Engineering, Lander Water Supply Project Level II, Phase III, Final Report, Dec, 1999
Nelson Engineering, Lander Water Supply Project Level II, Phase III Final Report, Executive Summary, Dec, 1999
Weston Engineering, Inc., Lander Level II Paleozoic Aquifer Well Sitting Study, Final Report, Nov, 2002
Weston Engineering, Inc., Lander Level II Paleozoic Aquifer Well Sitting Study, Executive Summary, Nov, 2002
Weston Engineering, Inc., Lander Level II Water Supply Project, Executive Summary, Aug, 2004
Weston Engineering, Inc., Lander Level II Water Supply Project, Final Report, Aug, 2004
Weston Engineering, Inc., Lander Level II Water Supply Project, Exploration Well Deepening, Final Report, Oct, 2007
Weston Engineering, Inc., Lander Level II Water Supply Project, Exploration Well Deepening, Executive Summary, Oct, 2007 (2,452 kb)

LaPrele
Nelson Engineering, LaPrele Irrigation Project: Section I, Soils and Drainage, Section II, Seepage and Water Loss Study, Section III, Hydrologic Study, Sep, 1973
James Jacobs, Priority Improvements of the LaPrele Irrigation Project: Estimates of Increased Returns to Irrigators, Nov, 1983

Laramie County
Western Water Consultants, Ground Water Development Potential of the Paleozoic Aquifer Along the Flanks of the Laramie Range and Hartville Uplift, Dec, 1982

Laramie
Snowy Range Water Consultants, Inc, South Laramie Water Supply Study Level I, Executive Summary, Nov, 1991
Snowy Range Water Consultants, Inc, South Laramie Water Supply Study Level I, Final Report, Nov, 1991
Jack Noblitt & Associates, Laramie Regional Airport Water System Improvements Level II, Executive Summary, Dec, 1993
Jack Noblitt & Associates, Laramie Regional Airport Water System Improvements Level II Feasibility Study, Dec, 1993
Western Water Consultants, City of Laramie Water Supply Master Plan Level I, Phase II, Volume 2, Appendices, Nov, 1994
Western Water Consultants, City of Laramie Water Supply Master Plan, Executive Summary, Jan, 1995
Western Water Consultants, City of Laramie Water Supply Master Plan Level I, Jan, 1995
Kennedy Engineering, Task 'A' Laramie River Diversion Dam Evaluation and Rehabilitation Plan, Executive Summary, Jan, 1996
Kennedy Engineering, Task 'A' Laramie River Diversion Dam Evaluation and Rehabilitation Plan, Final Report, Jan, 1996
RBD, Inc, City of Laramie Water Supply Master Plan Level II, Executive Summary, Jun, 1996
RBD, Inc, City of Laramie Water Supply Master Plan Level II, Final Report, Jun, 1996
Banner Associates, Inc, Laramie West Water Supply Project Level II, Nov, 1998
Banner Associates, Inc, Laramie West Water Supply Project Level II, Executive Summary, Nov, 1998
Western Water Consultants, Laramie North Side Supply Project Level II, Executive Summary, Nov, 2000
Western Water Consultants, Laramie North Side Supply Project Level II, Nov, 2000
WWC Engineering, Laramie Water Management Plan Level II, Volume I of II, Aug, 2006
WWC Engineering, Laramie Water Management Plan Level II, Volume II of II, Appendices, Aug, 2006
WWC Engineering, Laramie Water Management Plan Level II, Executive Summary, Aug, 2006

LeClair
Crank Companies, Inc., LeClair Irrigation Rehabilitation Project Level II, Final Report, Dec, 1988
Crank Companies, Inc., LeClair Irrigation Rehabilitation Project Level II, Executive Summary, Dec, 1988
Nelson Engineering, Wind River Study, LeClair Canal and Riverton Valley (Wyoming No. 2 Canal) Rehabilitation Level I, Phase III, Executive Summary, Mar, 1993
Nelson Engineering, Wind River Study, LeClair Canal and Riverton Valley (Wyoming No. 2 Canal) Rehabilitation Level I, Phase III, Final Report, Mar, 1993
Apex Surveying, Inc, LeClair Irrigation District Laterals Rehabilitation Level II Summary, Nov, 2002
Apex Surveying, Inc, LeClair Laterals Rehabilitation No. 2, Level II Feasibility, Nov, 2002
States West Water Resources Corporation, LeClair/Riverton Valley Irrigation Storage Project Level II Study, Final Report, Oct, 2006
States West Water Resources Corporation, LeClair/Riverton Valley Irrigation Storage Project Level II Study, Executive Summary, Oct, 2006

Lingle
Benchmark of Torrington, Town of Lingle Water Supply Master Plan Level I Project, Final Report, Nov, 1998
Benchmark of Torrington, Town of Lingle Water Supply Master Plan Level I Project, Executive Summary, Nov, 1998

Little Big Horn
Wyoming Water Development Commission, Report to the Governor, Little Big Horn Project, Sep, 1981
Wyoming Water Development Commission, Agreement between the State of Wyoming Water Development Commission and the Sheridan-Little Horn Water Group Regarding the Development of the Little Big Horn River, Jan, 1982

Little Goose
Howard Needles Tammen & Bergendoff, Little Goose Domestic Water Supply Project, Volume II, Supplemental Groundwater Information, Jan, 1987
Howard Needles Tammen & Bergendoff, Little Goose Domestic Water Supply Project, Executive Summary, Jan, 1987
Howard Needles Tammen & Bergendoff, Little Goose Domestic Water Supply Project, Volume I, Report of Findings, Jan, 1987

Little Snake
Wyoming Water Development Commission, Report to the Legislature Cheyenne Project & Little Snake River Water Management Preliminary, Jan, 1980
Wyoming Game & Fish Department, Quantification of Trout Habitat that could be Impacted by Stage III of the Little Snake River Water Management Project, Oct, 1980
Banner Associates, Inc, Little Snake River Water Management Project Feasibility Study, Nov, 1980
Banner Associates, Inc, Little Snake River Water Management Project Substantiating Report, Nov, 1980
Wyoming Water Development Commission, Report to the Wyoming Legislature and Governor, Little Snake River Water Management Project, Jan, 1981
Wyoming Water Development Commission, Little Snake River Water Management Project, Examination of Alternatives Preliminary Report, Oct, 1981
Stone and Webster Engineering, Little Snake River Water Management Project, Technical Summary Report, Nov, 1984
Stone and Webster Engineering, Little Snake River Water Management Project, Technical Summary Report (Draft), Nov, 1984
Stone and Webster Engineering, Little Snake River Water Management Project, Executive Summary, Nov, 1984
Stone and Webster Engineering, Little Snake River Water Management Project, Fish Creek Collector System Yields, Jun, 1985
Western Water Consultants, Final Report on Little Snake River Depletions by Pot Hook, Three Forks and Powder Wash Rights, Jul, 1990
Resource Consultants, Sediment Transport Studies of the Little Snake, Yampa, and Green River Systems, Aug, 1991
Western Water Consultants, Little Snake River Basin Planning Study, Volume I, Executive Summary, Evaluation of the Baggs Water Supply, Treatment and Delivery System, Oct, 1992
Western Water Consultants, Little Snake River Basin Planning Study, Volume I, Final Report, Evaluation of the Baggs Water Supply, Treatment and Delivery System, Oct, 1992
Western Water Consultants, Little Snake River Basin Planning Study, Volume II, Executive Summary, Evaluation of Irrigation Diversion Dams and Principal Water Supply Ditches, Part A, Diversion Dams, Nov, 1992
Western Water Consultants, Little Snake River Basin Planning Study, Volume II, Final Report, Evaluation of Irrigation Diversion Dams and Principal Water Supply Ditches, Part A, Diversion Dams, Nov, 1992
Western Water Consultants, Little Snake River Basin Planning Study, Volume II, Executive Summary, Evaluation of Irrigation Diversion Dams and Principal Water Supply Ditches, Part B, Principal Ditches, Nov, 1992
Western Water Consultants, Little Snake River Basin Planning Study, Volume II, Final Report, Evaluation of Irrigation Diversion Dams and Principal Water Supply Ditches, Part B, Principal Ditches, Nov, 1992
Western Water Consultants, Little Snake River Basin Planning Study, Volume III, Executive Summary, Irrigation Reservoir Investigations, Dec, 1992
Western Water Consultants, Little Snake River Basin Planning Study, Volume III, Final Report, Irrigation Reservoir Investigations, Dec, 1992
Lidstone and Anderson, Little Snake River Basin Small Reservoir Development Project Level II, Final Report, Oct, 1998
Lidstone and Anderson, Little Snake River Basin Small Reservoir Development Project Level II, Executive Summary, Dec, 1998
Burns & McDonnell, Final Environmental Impact Statement, Little Snake Supplemental Irrigation Water Supply, Carbon County, Wyoming, Jan, 1999
Burns & McDonnell, Final Environmental Impact Statement, Little Snake Supplemental Irrigation Water Supply, Carbon County, Wyoming, Appendices, Jan, 1999
Gannett Fleming, Little Snake River Dams Level II Studies, Executive Summary, Jul, 2003
Gannett Fleming, Little Snake River Dams Level II Studies, Final Report, Jul, 2003

Lodgepole Aquifer
Dahlgren Consulting, Inc, Lodgepole Aquifer Storage and Retrieval Level I Study, Final Report, Nov, 2001
Dahlgren Consulting, Inc, Lodgepole Aquifer Storage and Retrieval Level I Study, Executive Summary, Nov, 2001

Lovell
A & H Consulting, Inc., Lovell Irrigation District Hydropower Study Level II, May, 2003
A & H Consulting, Inc., Lovell Irrigation District Hydropower Study Level II, Executive Summary, May, 2003

Lusk
Worthington, Lenhart, Carpenter, Inc, Town of Lusk Water Project Level I Master Plan Study, Final Report, Nov, 1994
Worthington, Lenhart, Carpenter, Inc, Executive Summary of Level I Master Plan Study of Town of Lusk's Water Supply System, Dec, 1994
MK Centennial, Lusk Water Supply Project Level II Lusk, Wyoming, Executive Summary, Nov, 1995
MK Centennial, Lusk Water Supply Project Level II Lusk, Wyoming, Final Report, Nov, 1995

Lysite
Stetson Engineering, Inc, Executive Summary for Lysite Water Supply Level I Study, Feb, 2006
Stetson Engineering, Inc, Final Report for Lysite Water Supply Level I Study, Feb, 2006
Stetson Engineering, Inc, Executive Summary for Lysite Water Supply Level II Study, Feb, 2008 (1,164 kb)
Stetson Engineering, Inc, Final Report for Lysite Water Supply Level II Study, Feb, 2008 (6,140 kb)

Manderson
Buell Winter Mousel and Associates, Feasibility Study for Water Well Supply, Town of Manderson, May, 1982
Buell Winter Mousel and Associates, Exploratory Drilling Program Report for Manderson, Wyoming, Feb, 1983
Western Water Consultants, Groundwater Feasibility for the Town of Manderson, May, 1983
Western Water Consultants, Final Report on Drilling and Testing Town of Manderson Well #3, Feb, 1984
Graham, Dietz & Associates, Manderson Level II Water Supply Study, Appendix, Nov, 1994
Graham, Dietz & Associates, Manderson Level II Water Supply Study, Final Report, Nov, 1994
Graham, Dietz & Associates, Manderson Level II Water Supply Study, Executive Summary, Nov, 1994

Manville
Western Water Consultants, Final Report on the Manville Water Supply Project Level II, Volume I, Jun, 1997
Western Water Consultants, Final Report on the Manville Water Supply Project Level II, Volume II, Jun, 1997
Western Water Consultants, Executive Summary for the Manville Water Supply Project Level II, Jun, 1997

Marbleton
JFC Engineers/Surveyors, Marbleton Municipal Water Well Number Six, Final Report of Drilling, Development and Testing, Jan, 2002
JFC Engineers/Surveyors, Marbleton Municipal Water Well Number Six, Executive Summary of Drilling, Development and Testing, Jan, 2002

McNutt
BRS Inc, McNutt Water Supply Project Level II, Final Report, Nov, 1998
BRS Inc, McNutt Water Supply Project Level II, Executive Summary, Nov, 1998

Meade
EnTech, Inc, Meade Creek Ditch Rehabilitation Level II Study, Executive Summary, Jun, 2005
EnTech, Inc, Meade Creek Ditch Rehabilitation Level II Study, Final Report, Jun, 2005

Medicine Bow
No Author, Municipal Water Supply Source Problems, Town of Medicine Bow, Wyoming, Jan, 1983
Banner Associates, Inc, Feasibility Study for Groundwater Development for the Town of Medicine Bow, Jun, 1983
Banner Associates, Inc, Construction and Testing of the Como #4 Well, Oct, 1984

Meeteetse
James Gores and Associates, P.C., Meeteetse Regional Water Supply Master Plan Level I, Final Report, Oct, 1995
James Gores and Associates, P.C., Meeteetse Regional Water Supply Master Plan Level I, Executive Summary, Oct, 1995
Sear-Brown Group, Meeteetse Water Supply Project Level II, Executive Summary, Nov, 1997
Sear-Brown Group, Meeteetse Water Supply Project Level II, Final Report, Nov, 1997

Middle Fork Powder River Basin
Wright Water Engineers, Inc., Middle Fork Rural Water District Domestic Water System Level I, Reconnaissance Study, Nov, 1984
Wright Water Engineers, Inc., Middle Fork Rural Water District Domestic Water System Level I, Executive Summary, Nov, 1984
Harza, Middle Fork Powder River Dam and Reservoir Project, Interim Report, Executive Summary, Jan, 1985
Harza, Middle Fork Powder River Dam and Reservoir Project, Interim Report, Main Report and Appendices, Jan, 1985
TriHydro Corporation, Level II Exploratory Drilling Program for the Middle Fork Rural Water District, Nov, 1985
Harza, Middle Fork Powder River Dam and Reservoir Project, Draft Conceptual Design Report, Volume I, Main Report, Nov, 1985
Wyoming Water Development Commission, Synopsis Report Middle Fork Powder River Dam and Reservoir Project, Jan, 1986
Harza, Middle Fork Powder River Dam and Reservoir Project, Conceptual Design Report, Volume I, Main Report, Jan, 1986
Harza, Middle Fork Powder River Dam and Reservoir Project, Conceptual Design Report, Volume II, Appendices A-C, Jan, 1986
Harza, Middle Fork Powder River Dam and Reservoir Project, Conceptual Design Report, Volume III, Appendix D, Jan, 1986
Harza, Middle Fork Powder River Dam and Reservoir Project, Conceptual Design Report, Volume IV, Appendices E-G, Jan, 1986
Harza, Middle Fork Powder River Dam and Reservoir Project, Conceptual Design Report, Executive Summary, Jan, 1986
Wyoming Water Development Commission, Report on the Feasibility of Providing Instream Flow in a Segment of the Middle Fork Powder River, Jun, 1987

Midvale
Anderson Consulting Engineers, Inc., Midvale Conservation Program Level II Final Report, Jun, 2007 (155,051 kb)
Anderson Consulting Engineers, Inc., Midvale Conservation Program Level II Executive Summary, Jun, 2007 (456 kb)

Moorcroft
Weston Engineering, Inc., Moorcroft Water Study Level I, Oct, 1991
Weston Engineering, Inc., Moorcroft Water Study Level I, Executive Summary, Oct, 1991
Weston Engineering, Inc., Moorcroft Water Study Level I, Apr, 1992
Weston Engineering, Inc., Moorcroft Water Study Level I, Executive Summary, Apr, 1992
Bearlodge Ltd, Inc., Moorcroft Water Supply Level II, Executive Summary, Jan, 1994
Bearlodge Ltd, Inc., Moorcroft Water Supply Level II, Final Report, Jan, 1994
Weston Engineering, Inc., Moorcroft Level II Water Supply Study, Executive Summary, Oct, 2002
Weston Engineering, Inc., Moorcroft Level II Water Supply Study, Final Report, Oct, 2002

Natrona
James M. Montgomery, Consulting Engineers, Natrona County Regional Water System Project Level I, Executive Summary, May, 1990
James M. Montgomery, Consulting Engineers, Natrona County Regional Water System Project Level I, May, 1990
Civil Engineering Professionals, Inc., Natrona County Regional Water Supply Project Level II Feasibility Study, Executive Summary, Nov, 1994
Civil Engineering Professionals, Inc., Natrona County Regional Water Supply Project Level II Feasibility Study, Final Report, Nov, 1994
Civil Engineering Professionals, Inc., Natrona County Regional Water Supply Project Level II Feasibility Study, Final Report, Amendment No. 1, Apr, 1995

Natural Bridge Well
ARIX Corporation, Hydrogeologic Evaluation of the Natural Bridge Well, Converse County, Wyoming, Jan, 1987

New Fork
Wyoming Water Development Commission, Report on the Feasibility of Providing Instream Flow in New Fork River Instream Flow Segment No. 1, Jan, 1990

Newcastle
RCH and Associates, Level I Water Supply Project, Salt Creek Water District, Newcastle, Wyoming, Executive Summary, Dec, 1996
RCH and Associates, Level I Water Supply Project, Salt Creek Water District, Newcastle, Wyoming, Final Report, Dec, 1996
Wester Wetstein & Associates, Newcastle Area Water Supply Master Plan Level II, Volume 2, Apr, 2000
Wester Wetstein & Associates, Newcastle Area Water Supply Master Plan Level II, Volume 1, Apr, 2000
Stetson Engineering, Inc, Final Level II Study Report for Canyon Improvement and Service District, Newcastle, Wyoming, Includes Canyon No. 1 Test Well Construction Report, Oct, 2005
Stetson Engineering, Inc, Executive Summary for Canyon Improvement and Service District, Level II Water Supply Study, Nov, 2005 (4,763 kb)
Stetson Engineering, Inc, Final Report Attachments, Canyon Improvement & Service District Level II Study, Nov, 2005

Nine Mile
Coffey & Associates, Nine Mile Water Supply Project Level I, Executive Summary, Nov, 1998
Coffey & Associates, Nine Mile Water Supply Project Level I, Final Report, Nov, 1998
Western Water Consultants, Executive Summary of the Level II Study for the Nine Mile Water and Sewer District, Nov, 1999
Western Water Consultants, Report of the Level II Study for the Nine Mile Water and Sewer District, Nov, 1999

North Alpine
Rendezvous Engineering, PC, Final Report for Level II North Alpine Water Supply Study, Nov, 2002
Rendezvous Engineering, PC, Executive Summary for Level II North Alpine Water Supply Study, Nov, 2002

North Canal
Aqua Engineering, Inc., North Canal Master Plan Level I, Executive Summary, Nov, 2003
Aqua Engineering, Inc., North Canal Master Plan Level I, Final Report, Nov, 2003

North End
Weston Engineering, Inc., Northend Water Users, Wellhead Protection Plan, Jan, 1989
Sunrise Engineering, North End Water Users Study Level I Study, Executive Summary, May, 1999
Sunrise Engineering, North End Water Users Study Level I Study, May, 1999

North Platte
Black & Veatch, Water Supply Needs Assessment for the North Platte and Little Snake River Drainages Phase I, Volume 1, Text, Jul, 1983
Black & Veatch, Water Supply Needs Assessment for the North Platte and Little Snake River Drainages Phase I, Volume 2, Appendices, Jul, 1983
Black & Veatch, Water Supply Needs Assessment for the North Platte and Little Snake River Drainages Phase II, Nov, 1984

Beaver Creek
Bearlodge Ltd, Inc., Beaver Creek Dam and Reservoir Level I, Oct, 1989
Bearlodge Ltd, Inc., Beaver Creek Dam and Reservoir Level II, Phase 1 Investigation, Aug, 1990
Bearlodge Ltd, Inc., Beaver Creek Dam and Reservoir Project Level II, Final Report, Aug, 1991
Bearlodge Ltd, Inc., Beaver Creek Dam and Reservoir Project Level II, Executive Summary, Aug, 1991

North Platte
Black & Veatch, Water Supply Needs Assessment for the North Platte and Little Snake River Drainages Phase II, Including Municipal and Agricultural Ability to Pay Analyses, Executive Summary, Dec, 1984
Black & Veatch, Municipal Ability to Pay Analysis and Agricultural Ability to Pay Analysis for the North Platte and Little Snake River Drainages, Dec, 1984

North Uinta
Forsgren Associates, North Uinta County Improvement and Service District Water Supply Master Plan Level I, Final Report, Sep, 2000
TriHydro Corporation, North Uinta Water Supply Project Level II Feasibility Study, Bear River, Wyoming, Executive Summary, Mar, 2003
TriHydro Corporation, North Uinta Water Supply Project Level II Feasibility Study, Bear River, Wyoming, Final Report, Mar, 2003

Northeast Wyoming River Basins
Wyoming Water Development Commission, Northeast Wyoming Level I Final Report, Sep, 1985
HKM Engineering, Northeast Wyoming River Basins Plan, Executive Summary, Feb, 2002
HKM Engineering, Northeast Wyoming River Basins Plan, Final Report, Feb, 2002
HKM Engineering, Northeast Wyoming River Basins Plan Technical Memoranda Volume I, A-J, Feb, 2002
HKM Engineering, Northeast Wyoming River Basins Plan Technical Memoranda Volume II, K-U, Feb, 2002

Oakley
Johnson-Fermelia Company, Inc., Phase I Report, Oakley Water Supply Project Level II, Feasibility Study, Aug, 1989
Johnson-Fermelia Company, Inc., Supplement to Phase I Report, Oakley Water Supply Project Level II, Feasibility Study, Sep, 1989
Johnson-Fermelia Company, Inc., Phase II Report, Oakley Water Supply Project Level II, Feasibility Study, Apr, 1990
Johnson-Fermelia Company, Inc., Phase II Report, Oakley Water Supply Project Level II, Feasibility Study, Executive Summary, Apr, 1990
Johnson-Fermelia Company, Inc., Phase II Report (Opal Pipeline), Oakley Water Supply Project Level II Feasibility Study, Apr, 1990
Johnson-Fermelia Company, Inc., Phase III Report (Opal Pipeline), Oakley Water Supply Project Level II Feasibility Study, Executive Summary, Apr, 1990
Johnson-Fermelia Company, Inc., Phase III Report (Opal Pipeline), Oakley Water Supply Project Level II Feasibility Study, Apr, 1990

Opal
Sunrise Engineering, Opal Regional System Level II Study, Executive Summary, Oct, 2000
Sunrise Engineering, Opal Regional System Level II Study, Oct, 2000
Sunrise Engineering, Opal Regional System Level II, Phase II Study, Sep, 2001
Sunrise Engineering, Opal Regional System Level II, Phase II Study, Executive Summary, Sep, 2001

Osage
Banner Associates, Inc, Osage Water Supply Project Level II, Final Report, Executive Summary, Jan, 1994
Banner Associates, Inc, Osage Water Supply Project Level II, Final Report, Jan, 1994
Banner Associates, Inc, Osage Water Supply Project Level II Extension, Executive Summary, Apr, 1996
Banner Associates, Inc, Osage Water Supply Project Level II Extension, Final Report, Apr, 1996

Owl Creek
Nelson Engineering, Owl Creek Master Plan Level I, Final Report, Sep, 2004
Nelson Engineering, Owl Creek Master Plan Level I, Executive Summary, Sep, 2004
Aqua Engineering, Inc., Owl Creek Irrigation District Conservation Study Level II, Executive Summary, Oct, 2006
Aqua Engineering, Inc., Owl Creek Irrigation District Conservation Study Level II, Final Report, Oct, 2006 (30,983 kb)
Engineering Associates, Owl Creek Rural Water Supply Level I Study, Final Report, Aug, 2007
Engineering Associates, Owl Creek Rural Water Supply Level I Study, Executive Summary, Aug, 2007

Park Reservoir Dam
Woodward-Clyde Consultants, Park Reservoir Dam Near Sheridan, Wyoming, Oct, 1980
Woodward-Clyde Consultants, Environmental Assessment for Replacement of Park Reservoir Dam, Jan, 1981
Wyoming Water Development Commission, Report to the Wyoming Legislature and the Governor, Reconstruction of Park Reservoir Dam, Jan, 1981

Pathfinder
Bureau of Reclamation, Pathfinder Modification Project Proposal, Hydrologic Evaluation, Aug, 1998
ECI, Pathfinder Modification Project Alternatives Analysis Report, Nov, 2004

Pine Bluffs
AVI, Pine Bluffs Level I Water Study, Nov, 1994
AVI, Pine Bluffs Level I Water Study, Executive Summary, Nov, 1994
Lidstone and Anderson, Executive Summary of the Final Report, Town of Pine Bluffs Water Supply Project Level II, Nov, 1995
Lidstone and Anderson, Final Report, Town of Pine Bluffs Water Supply Project Level II, Nov, 1995
Lidstone and Anderson, Town of Pine Bluffs Ground Water Exploration Grant Final Report, Aug, 2003
Dahlgren Consulting, Inc, Pine Bluffs Lance Fox Hills Well Level II Study, Executive Summary, Oct, 2005
Dahlgren Consulting, Inc, Pine Bluffs Lance Fox Hills Well Level II Study, Final Report, Oct, 2005

Pine Butte
Centennial Engineering & Research, Inc., Level I Reconnaissance Information, Pine Butte Improvement and Service District, Gillette, Wyoming, Dec, 1991
HKM Engineering, Final Report for a Proposed Water Supply System for Pine Butte Improvement and Service District, Oct, 1992
Wester Wetstein & Associates, Construction, Testing and Conceptual Completion Design of the Pine Butte No. 1 Well for the Pine Butte Water Supply Project Level II, Dec, 1993
Wester Wetstein & Associates, Construction, Testing and Conceptual Completion Design of the Pine Butte No. 1 Well, Executive Summary for the Pine Butte Water Supply Project Level II, Jan, 1994

Pine Haven
Stetson Engineering, Inc, Pine Haven Master Plan Level I Reconnaissance Study, Final Report, Nov, 2000
Stetson Engineering, Inc, Pine Haven Master Plan Level I Reconnaissance Study, Executive Summary, Nov, 2000
Wester Wetstein & Associates, Pine Haven Well Project Level II, Executive Summary, Jun, 2003
Wester Wetstein & Associates, Pine Haven Well Project Level II, Final Report, Jun, 2003

Pinedale
Johnson-Fermelia Company, Inc., Pinedale Water Supply Project Level II, Phase II Report, Sep, 1993
Johnson-Fermelia Company, Inc., Watershed Management Control Plan, Pinedale Water Supply Project Level II, Sep, 1993
Johnson-Fermelia Company, Inc., Pinedale Water Supply Project Level II, Phase I Report, Sep, 1993
TST Inc., Town of Pinedale Water Supply Master Plan Level I, Phase 1 and Phase 2, Executive Summary, Nov, 1995
TST Inc., Town of Pinedale Water Supply Master Plan Level I, Phase 1 and Phase 2, Nov, 1995
Sunrise Engineering, Pinedale Hydropower Study Level II, Final Report, May, 2003
Sunrise Engineering, Pinedale Hydropower Study Level II, Executive Summary, May, 2003

Pioneer Canal
Western Water Consultants, Pioneer Canal Improvements Project Level II, Phase II Report, Executive Summary, Dec, 1991
Western Water Consultants, Pioneer Canal Improvements Project Level II, Phase II Report, Final Report, Dec, 1991

Platte
Lidstone and Associates, Inc., Platte Goshen Regional Master Plan Level I Study, Sep, 2004
Lidstone and Associates, Inc., Platte Goshen Regional Master Plan Level I Study, Executive Summary, Sep, 2004
TriHydro Corporation, Platte River Basin Plan, Final Report, May, 2006
TriHydro Corporation, Platte River Basin Plan, Executive Summary, May, 2006
TriHydro Corporation, Platte River Basin Plan, Technical Memorandums 1.1-2.1.4, Vol. I, May, 2006
TriHydro Corporation, Platte River Basin Plan, Technical Memorandums 2.1.5-5.3, Vol. II, May, 2006

Poison Spider
Civil Engineering Professionals, Inc., Poison Spider Water Supply Project Level II Feasibility Study, Final Report, Nov, 1994
Civil Engineering Professionals, Inc., Poison Spider Water Supply Project Level II Feasibility Study, Executive Summary, Nov, 1994

Popo Agie River
Anderson Consulting Engineers, Inc., Popo Agie River Watershed Study Level I, Final Report, Jul, 2003
Anderson Consulting Engineers, Inc., Popo Agie River Watershed Study Level I, Executive Summary, Jul, 2003

Porto Canal
Sunrise Engineering, Porto Canal Rehabilitation Project Level II Study, Final Report, Oct, 1994
Sunrise Engineering, Porto Canal Rehabilitation Project Level II Study, Executive Summary, Oct, 1994

Powder River
Harza, Powder River Level I Reconnaissance Study, Status Report to Wyoming Legislature, Nov, 1982
Harza, Storage Developments for Water Supply, Powder River Basin in Wyoming, Level I Reconnaissance Study (Draft), Mar, 1983
Harza, Storage Developments for Water Supply, Powder River Basin in Wyoming, Level I Reconnaissance Study, Volume 1, Main Report, Sep, 1983
Harza, Storage Developments for Water Supply, Powder River Basin in Wyoming, Level I Reconnaissance Study, Volume II, Appendices, Sep, 1983

Town of Powder River
Banner Associates, Inc, Powder River Water Supply Level I Study, Executive Summary, Dec, 2002
Banner Associates, Inc, Powder River Water Supply Level I Study, Dec, 2002

Powder-Tongue River Basin
HKM Engineering, Powder/Tongue River Basin Plan, Final Report, Feb, 2002
HKM Engineering, Powder/Tongue River Basin Plan, Technical Memoranda, Vol. I, A-I, Feb, 2002
HKM Engineering, Powder/Tongue River Basin Plan, Technical Memoranda, Vol. II, J-K, Feb, 2002
HKM Engineering, Powder/Tongue River Basin Plan, Technical Memoranda, Vol. III, L-U, Feb, 2002
HKM Engineering, Powder/Tongue River Basin Plan, Executive Summary, Feb, 2002

Powell
Engineering Associates, Powell Master Plan Level I Study, Final Report, Oct, 2000
Engineering Associates, Powell Master Plan Level I Study, Executive Summary, Oct, 2000

Prairie Dog
HDR, Prairie Dog Level I Hydropower Feasibility Study, Executive Summary, Dec, 1984
HDR, Prairie Dog Level I Hydropower Feasibility Study, Final Report, Dec, 1984
EnTech, Inc, Executive Summary for Prairie Dog Creek Watershed Master Plan Level I Study, Nov, 2001
EnTech, Inc, Final Report for Prairie Dog Creek Watershed Master Plan Level I Study, Nov, 2001

Ranchester
EnTech, Inc, Final Report for Ranchester Master Plan Level I Study, Nov, 2002
EnTech, Inc, Executive Summary for Ranchester Master Plan Level I Study, Nov, 2002
EnTech, Inc, Ranchester Master Plan Level II Study, Executive Summary, Nov, 2004
EnTech, Inc, Ranchester Master Plan Level II Study, Final Report, Nov, 2004

Rawlins
James M. Montgomery, Consulting Engineers, City of Rawlins, Wyoming Hydrogeologic and Water Supply Study Task Report No. 1, Phase I, May, 1982
James M. Montgomery, Consulting Engineers, City of Rawlins, Wyoming Hydrogeologic and Water Supply Study Task Report No. 2, Phase II, III, IV, Jul, 1982
James M. Montgomery, Consulting Engineers, City of Rawlins Water Development Master Plan Draft Report Summary for Public Hearing, Dec, 1982
James M. Montgomery, Consulting Engineers, City of Rawlins Water Development Master Plan V. I, May, 1983
James M. Montgomery, Consulting Engineers, City of Rawlins Water Development Master Plan V. II, Background Data and Reports, May, 1983
Anderson & Kelly, Inc., Hydrogeologic Evaluation of the Nugget Aquifer Near Rawlins, Wyoming Level II Feasibility Study, Nov, 1984
James M. Montgomery, Consulting Engineers, Rawlins Groundwater Project Level III, Summary of Interim Report and Nugget Aquifer Report, Jan, 1986
James M. Montgomery, Consulting Engineers, Rawlins Groundwater Project Level III, Interim Report, Feb, 1986
James M. Montgomery, Consulting Engineers, Rawlins Groundwater Project Level III, Nugget Aquifer Report, Feb, 1986
Jeffrey L. Hauff, Report of a Class III Cultural Resource Inventory, Rawlins Groundwater Project, Lower Sage Creek Transmission Line, Carbon County, Wyoming, Jul, 1986
James M. Montgomery, Consulting Engineers, City of Rawlins, Wyoming Sage Creek Water Transmission Pipeline and Wellfield Facilities, Legislative Executive Summary, Dec, 1986
Western Water Consultants, City of Rawlins Water Supply Project Level II, Phase I Report, Nov, 1997
Western Water Consultants, City of Rawlins Water Supply Project Level II, Executive Summary, Jun, 1998
Western Water Consultants, City of Rawlins Water Supply Project Level II, Phase II Report, Jun, 1998
Western Water Consultants, Rawlins Raw Water Storage Level II, Phase I and II Report, Oct, 2006
Western Water Consultants, Rawlins Raw Water Storage Level II, Phase I and II Report, Executive Summary, Oct, 2006

Ray Lake
Gannett Fleming, Ray Lake Enlargement Level II Study, Executive Summary, Jul, 2005
Gannett Fleming, Ray Lake Enlargement Level II Study, Final Report, Jul, 2005

Red Lane
Civil Engineering Professionals, Inc., Red Lane Rehabilitation Project Level II Feasibility Study, Phase I, Inventory Report, Sep, 1989
Civil Engineering Professionals, Inc., Red Lane Rehabilitation Project Level II Feasibility Study, Executive Summary, Sep, 1990
Civil Engineering Professionals, Inc., Red Lane Rehabilitation Project Level II Feasibility Study, Final Report, Sep, 1990

Ridgewater
Centennial Engineering & Research, Inc., Ridgewater Water Supply Project Level II, Phase I Report, Aug, 1989
TriHydro Corporation, Ridgewater Water Supply Project Level II, Phase II Report, Nov, 1990
Centennial Engineering & Research, Inc., Ridgewater Water Supply Project Level II, Final Report, Dec, 1991
Centennial Engineering & Research, Inc., Ridgewater Water Supply Project Level II, Executive Report, Dec, 1991

Riverside
S