UW Home | Wyo Web | About UW | A-Z Directory | Phone/E-mail | Search UW

Reference
  River Basin Plans
  Ground Water Characteristics
  Reference Shelf
  Links

Online Documents
  Water Development Reports
  WWDC Watershed Studies
  Historical Planning Documents
  Instream Flow Reports
  Water Resources Publications
  Water Resources Series
  Research Briefs
  Theses
  UW-WRP Projects

Contact Us

Water Resources Data System

Library Homepage

  


Water Resources Data System Library
Wyoming Water Development Commission Watershed Studies

The purpose of the Wyoming Water Development Commission (WWDC) Small Water Project Program (SWPP) is to participate with land management agencies and sponsoring entities in providing incentives for improving watershed condition and function. Projects eligible for SWPP grant funding assistance include the construction or rehabilitation of small reservoirs, wells, pipelines and conveyance facilities, springs, solar platforms, irrigation works, windmills and wetland developments. To read more about the Small Water Projects program at the Wyoming Water Development Office, see here


Badwater
Anderson Consulting Engineers, Inc., Badwater/Poison Creek Watershed Level I Study, Final Report, Feb, 2014 (34,406 kb)
Anderson Consulting Engineers, Inc., Badwater/Poison Creek Watershed Level I Study, Executive Summary, Feb, 2014 (2,293 kb)

Bear River
HDR, Bear River Watershed Study Level I, Final Report, Feb, 2017 (180,726 kb)
HDR, Bear River Watershed Study Level I, Executive Summary, Feb, 2017 (247 kb)
HDR, Bear River Watershed Study Level I, Appendices, Feb, 2017 (208,681 kb)

Beaver Creek
Olsson Associates, Beaver Creek Watershed Study Level I, Final Report, Nov, 2018 (73,032 kb)
Olsson Associates, Beaver Creek Watershed Study Level I, Executive Summary, Nov, 2018 (1,617 kb)

Belle Fourche
RESPEC, Belle Fourche River Watershed Study Basin Wide Watershed Management Plan, Final Report, V. 1, Mar, 2015 (84,500 kb)
RESPEC, Belle Fourche River Watershed Study Basin Wide Watershed Management Plan, Final Report, V. 2, Mar, 2015 (8,038 kb)
RESPEC, Belle Fourche River Watershed Study Basin Wide Watershed Management Plan, Executive Summary, Mar, 2015 (2,256 kb)
RESPEC, Belle Fourche River Watershed Study Redwater Subbasin Watershed Management Plan, Final Report, Mar, 2015 (28,059 kb)
RESPEC, Belle Fourche River Watershed Study Subbasin Above Keyhole Reservoir Watershed Management Plan, Final Report, Mar, 2015 (28,315 kb)
RESPEC, Belle Fourche River Watershed Study Subbasin Below Keyhole Reservoir Watershed Management Plan, Final Report, Mar, 2015 (31,798 kb)

Big Sandy Watershed
Rio Verde Engineering, Big Sandy Watershed Level I Study, Final Report, Oct, 2019 (211,243 kb)
Rio Verde Engineering, Big Sandy Watershed Level I Study, Executive Summary, Oct, 2019 (365 kb)

Bitter Creek
Anderson Consulting Engineers, Inc., Bitter Creek/East Flaming Gorge Watershed Study Level I, Final Report, Nov, 2018 (163,602 kb)
Anderson Consulting Engineers, Inc., Bitter Creek/East Flaming Gorge Watershed Study Level I, Executive Summary, Nov, 2018 (1,149 kb)

Blacks Fork
Anderson Consulting Engineers, Inc., Blacks Fork River Watershed Study, Level I Basinwide, Final Report, Jan, 2015 (28,748 kb)
Anderson Consulting Engineers, Inc., Blacks Fork River Watershed Study, Level I, Executive Summary, Jan, 2015 (487 kb)
Anderson Consulting Engineers, Inc., Blacks Fork River Watershed Study Level I Phase I, Hams Fork, Final Report, Jan, 2015 (22,017 kb)
Anderson Consulting Engineers, Inc., Blacks Fork River Watershed Study Level I Phase II, Upper Blacks Fork, Final Report, Jan, 2015 (30,992 kb)
Anderson Consulting Engineers, Inc., Blacks Fork River Watershed Study Level I Phase III, Lower Blacks Fork, Final Report, Jan, 2015 (22,348 kb)

Buffalo Creek
Anderson Consulting Engineers, Inc., Buffalo Creek Watershed Study Level I, Final Report, Mar, 2012 (57,714 kb)
Anderson Consulting Engineers, Inc., Buffalo Creek Watershed Study Level I, Executive Summary, Mar, 2012 (5,894 kb)

Clear Creek
States West Water Resources Corporation, Clear Creek Watershed Level I Study, Final Report, Mar, 2011 (243,192 kb)
States West Water Resources Corporation, Clear Creek Watershed Level I Study, Executive Summary, Mar, 2011 (19,896 kb)
States West Water Resources Corporation, Clear Creek Watershed Level I Study, Appendices, Mar, 2011 (143,256 kb)

Cottonwood-Grass Creek
Short Elliott Hendrickson Inc., Cottonwood/Grass Creek Watershed Management Plan Level I Study, Executive Summary, Oct, 2007 (5,928 kb)
Short Elliott Hendrickson Inc., Cottonwood/Grass Creek Watershed Management Plan Level I Study, Final Report, Oct, 2007 (94,212 kb)

Crazy Woman Watershed
HKM Associates, Crazy Woman Watershed Project Level II, Phase I, Rehabilitation Plan and Phase II Conceptual Design and Cost Estimates, Executive Summary, Nov, 1991 (783 kb)
HKM Associates, Crazy Woman Watershed Project Level II, Phase I, Rehabilitation Plan and Phase II Conceptual Design and Cost Estimates, Final Report, Nov, 1991 (31,904 kb)

Goose Creek
EnTech Inc., Goose Creek Watershed Level I Study, Final Report, Nov, 2018 (209,082 kb)
EnTech Inc., Goose Creek Watershed Level I Study, Executive Summary, Nov, 2018 (9,768 kb)

Greybull
Woodard & Curran, Greybull River Watershed Level I Study, Final Report, Nov, 2018 (248,298 kb)
Woodard & Curran, Greybull River Watershed Level I Study, Executive Summary, Nov, 2018 (3,318 kb)

Highline Watershed
Anderson Consulting Engineers, Inc., Highline Watershed Improvement District Ditch Rehabilitation Project Level II, Final Report, Nov, 1999 (80,371 kb)
Anderson Consulting Engineers, Inc., Highline Watershed Improvement District Ditch Rehabilitation Project Level II, Executive Summary, Nov, 1999 (2,539 kb)

Hoback River Watershed
Rio Verde Engineering, Hoback River Watershed Level I Study, Executive Summary, Nov, 2022 (174,930 kb)
Rio Verde Engineering, Hoback River Watershed Level I Study, Final Report, Nov, 2022 (2,641 kb)

Hopkins Producers Irrigation District
States West Water Resources Corporation, Hopkins Producers Irrigation District Watershed/Water Storage Project Level I, Final Report, Oct, 2008 (149,341 kb)
States West Water Resources Corporation, Hopkins Producers Irrigation District Watershed/Water Storage Project Level I, Executive Summary, Oct, 2008 (9,402 kb)

Horse Creek
Anderson Consulting Engineers, Inc., Horse Creek Watershed Level I Study, Final Report, Dec, 2019 (150,152 kb)
Anderson Consulting Engineers, Inc., Horse Creek Watershed Level I Study, Executive Summary, Dec, 2019 (2,309 kb)

Kirby
Sunrise Engineering, Kirby Creek Watershed Plan Level I Study, Executive Summary, Sep, 2005 (2,500 kb)
Sunrise Engineering, Kirby Creek Watershed Plan Level I Study, Final Report, Sep, 2005 (11,332 kb)
PBS&J, Kirby Creek Watershed Level I Study, Final Report, Sep, 2010 (129,051 kb)
PBS&J, Kirby Creek Watershed Level I Study, Executive Summary, Sep, 2010 (9,822 kb)

Lake Adelaide-Shell Valley
ESA Geotechnical Consultants, Shell Valley Watershed Level III, Phase 1, Interim Report on Conceptual Design, Lake Adelaide Enlargement, Executive Summary (see Shell), Jan, 1986 (1,118 kb)
ESA Geotechnical Consultants, Shell Valley Watershed Level III, Phase 1, Interim Report on Conceptual Design, Lake Adelaide Enlargement (see Shell), Jan, 1986 (20,912 kb)
ESA Geotechnical Consultants, Shell Valley Watershed Level III, Phase II, Lake Adelaide Enlargement, Executive Summary (see Shell), Dec, 1986 (1,719 kb)

Little Snake
Anderson Consulting Engineers, Inc., Little Snake River/Vermillion Creek Watershed Study Level I, Final Report, Sep, 2013 (70,986 kb)
Anderson Consulting Engineers, Inc., Little Snake River/Vermillion Creek Watershed Study Level I, Executive Summary, Sep, 2013 (1,049 kb)

Lower Laramie River Watershed
Anderson Consulting Engineers, Inc., Lower Laramie River Watershed Level I Study, Final Report, Nov, 2019 (104,778 kb)
Anderson Consulting Engineers, Inc., Lower Laramie River Watershed Level I Study, Executive Summary, Nov, 2019 (2,407 kb)

Medicine Bow
RESPEC, Medicine Bow River Watershed Study, Watershed Management Plan, Final Report, Feb, 2016 (423,051 kb)
RESPEC, Medicine Bow River Watershed Study, Watershed Management Plan, Executive Summary, Feb, 2016 (4,637 kb)

Middle Big Horn
Y2 Consultants, Middle Big Horn Watershed Study, Level I Study, Report, Jan, 2021 (11,653 kb)

New Fork River
Tetra Tech, Inc., New Fork River Watershed Level I Study, Executive Summary, Apr, 2018 (1,841 kb)
Tetra Tech, Inc., New Fork River Watershed Level I Study, Final Report, Apr, 2018 (154,446 kb)

Niobrara
RESPEC, Niobrara-Lower North Platte Rivers Watershed Study Level I Watershed Management Plan, Final Report, Apr, 2019 (177,740 kb)
RESPEC, Niobrara-Lower North Platte Rivers Watershed Study Level I Watershed Management Plan, Executive Summary, Apr, 2019 (3,051 kb)

North Platte
RESPEC, Middle North Platte Watershed Study Watershed Management Plan, Final Report, Feb, 2014 (118,852 kb)
RESPEC, Middle North Platte Watershed Study Watershed Management Plan, Executive Summary, Feb, 2014 (2,557 kb)
RESPEC, Middle North Platte River - Glendo Watershed Study, Watershed Management Plan, Final Report, Nov, 2016 (90,883 kb)
RESPEC, Middle North Platte River - Glendo Watershed Study, Watershed Management Plan, Executive Summary, Nov, 2016 (651 kb)
Anderson Consulting Engineers, Inc., Upper North Platte River Watershed Study Level I, Final Report, Dec, 2015 (52,064 kb)
Anderson Consulting Engineers, Inc., Upper North Platte River Watershed Study Level I, Executive Summary, Dec, 2015 (1,031 kb)

Nowood River
Anderson Consulting Engineers, Inc., Nowood River Storage/Watershed Study Level I, Executive Summary, Mar, 2010 (1,218 kb)
Anderson Consulting Engineers, Inc., Nowood River Storage/Watershed Study Level I, Final Report, Mar, 2010 (172,117 kb)

Owl Creek
Lowham Walsh Engineering & Environmental, Owl Creek Watershed Level I Study, Final Report, Dec, 2017 (78,171 kb)
Lowham Walsh Engineering & Environmental, Owl Creek Watershed Level I Study, Executive Summary, Dec, 2017 (2,921 kb)

Pinedale
Johnson-Fermelia Company, Inc., Watershed Management Control Plan, Pinedale Water Supply Project Level II, Sep, 1993 (9,461 kb)

Popo Agie Watershed
Anderson Consulting Engineers, Inc., Popo Agie River Watershed Study Level I, Final Report, Jul, 2003 (22,968 kb)
Anderson Consulting Engineers, Inc., Popo Agie River Watershed Study Level I, Executive Summary, Jul, 2003 (3,132 kb)
Olsson Associates, Popo Agie Watershed Study Level I Phase II, Final Report, Nov, 2019 (83,558 kb)
Olsson Associates, Popo Agie Watershed Study Level I Phase II, Executive Summary, Nov, 2019 (1,389 kb)

Prairie Dog
EnTech, Inc, Executive Summary for Prairie Dog Creek Watershed Master Plan Level I Study, Nov, 2001 (4,303 kb)
EnTech, Inc, Final Report for Prairie Dog Creek Watershed Master Plan Level I Study, Nov, 2001 (112,794 kb)
EnTech, Inc, Final Report for Prairie Dog Creek Watershed Master Plan Level I Study, Nov, 2001 (112,794 kb)
EnTech, Inc, Executive Summary for Prairie Dog Creek Watershed Master Plan Level I Study, Nov, 2001 (4,303 kb)

Shell Valley
HKM Engineering, Shell Valley Watershed Level II Study, Final Report, Jan, 1985 (24,038 kb)
ESA Geotechnical Consultants, Shell Valley Watershed, Level III, Phase 1, Interim Report on Conceptual Design, Lake Adelaide Enlargement (see Lake Adelaide), Jan, 1986 (20,912 kb)
ESA Geotechnical Consultants, Shell Valley Watershed, Level III, Executive Summary, Phase 1, Interim Report on Conceptual Design, Lake Adelaide Enlargement (see Lake Adelaide), Jan, 1986 (1,118 kb)
Morrison-Mairle, Inc, Final Report, Shell Valley Deep Well Project with Results of Aquifer Tests for Shell Valley Watershed Supply Project, Feb, 1986 (13,691 kb)
ESA Geotechnical Consultants, Executive Summary, Phase II: Lake Adelaide Enlargement, Shell Valley Watershed Level III (see Lake Adelaide), Dec, 1986 (1,719 kb)
Engineering Associates, Shell Valley Watershed Plan Level I Study, Final Report, Mar, 2010 (16,370 kb)
Engineering Associates, Shell Valley Watershed Plan Level I Study, Executive Summary, Mar, 2010 (3,115 kb)
Engineering Associates, Shell Valley Watershed Plan Level I Study, Appendices, Mar, 2010 (193,906 kb)

Shoshone River
Biota Research and Consulting, Inc, Lower Shoshone River Level I Watershed Study, Final Report, Mar, 2022 (141,779 kb)
Biota Research and Consulting, Inc, Lower Shoshone River Level I Watershed Study, Executive Summary, Mar, 2022 (1,757 kb)

South Platte River
Dahlgren Consulting, Inc., South Platte River Watershed Level I Study, Final Report, Jun, 2018 (172,869 kb)
Dahlgren Consulting, Inc., South Platte River Watershed Level I Study, Executive Summary, Jun, 2018 (1,795 kb)

Sweetwater River
Anderson Consulting Engineers, Inc., Sweetwater River Watershed Study Basinwide Watershed Management Plan Level I, Final Report, Apr, 2012 (53,651 kb)
Anderson Consulting Engineers, Inc., Sweetwater River Watershed Study Basinwide Watershed Management Plan Level I, Executive Summary, Apr, 2012 (1,894 kb)
Anderson Consulting Engineers, Inc., Sweetwater River Watershed Study Phase I Long Creek Watershed Management Plan, Final Report, Apr, 2012 (47,874 kb)
Anderson Consulting Engineers, Inc., Sweetwater River Watershed Study Phase II Muddy Creek and Horse Creek Watershed Management Plan, Final Report, Apr, 2012 (46,752 kb)
Anderson Consulting Engineers, Inc., Sweetwater River Watershed Study Phase III Alkali Creek/Crooks Creek/Buffalo Creek Watershed Management Plan, Final Report, Apr, 2012 (46,875 kb)
Anderson Consulting Engineers, Inc., Sweetwater River Watershed Study Phase IV Willow Creek/Sage Hen Creek/Dry Creek Watershed Management Plan, Final Report, Apr, 2012 (44,228 kb)

Three Horses
EnTech, Inc, Final Report for Three Horses Watershed Plan Level I Study, Dec, 2002 (102,170 kb)
EnTech, Inc, Executive Summary for Three Horses Watershed Plan Level I Study, Dec, 2002 (3,132 kb)

Thunder Basin
Olsson Associates, Thunder Basin Watershed Management Plan Level I Watershed Study, Executive Summary, Nov, 2009 (81,148 kb)
Olsson Associates, Thunder Basin Watershed Management Plan Level I Watershed Study, Final Report, Volume I, Nov, 2009 (58,541 kb)
Olsson Associates, Thunder Basin Watershed Management Plan Level I Watershed Study, Final Report, Volume II, Nov, 2009 (221,486 kb)
Olsson Associates, Thunder Basin Phase II Watershed Management Plan Level I Watershed Study, Lance and Lightning Creek, Final Report, Volume I , Sep, 2011 (20,565 kb)
Olsson Associates, Thunder Basin Phase II Watershed Management Plan Level I Watershed Study, Lance and Lightning Creek, Volume II, Maps , Sep, 2011 (83,240 kb)
Olsson Associates, Thunder Basin Phase II Watershed Management Plan Level I Watershed Study, Lance and Lightning Creek, Executive Summary, Sep, 2011 (9,641 kb)

Upper Green
Sunrise Engineering, Upper Green Watershed Study Level I, Final Report, Nov, 2014 (162,122 kb)
Sunrise Engineering, Upper Green Watershed Study Level I, Executive Summary, Nov, 2014 (5,113 kb)
Sunrise Engineering, Upper Green Watershed Study Level I, Appendix, Nov, 2014 (376,933 kb)

Upper Laramie River
Anderson Consulting Engineers, Inc., Upper Laramie River Watershed Study Level I, Final Report, Nov, 2016 (95,026 kb)
Anderson Consulting Engineers, Inc., Upper Laramie River Watershed Study Level I, Executive Summary, Nov, 2016 (4,607 kb)

Upper Snake River
Olsson Associates, Upper Snake River Level I Watershed Study, Final Report, Nov, 2016 (18,435 kb)
Olsson Associates, Upper Snake River Level I Watershed Study, Executive Summary, Nov, 2016 (2,754 kb)
Olsson Associates, Upper Snake River Level I Watershed Study, V. II, Nov, 2016 (445,043 kb)

Water Resources Data System Library | Water Resources Data System Homepage


[an error occurred while processing this directive]