Water Resources Data System Library
Wyoming Water Development Commission Projects and Studies

In June 2008, WRDS began a major review of all electronic documents in its WWDC "Project Report and Studies" collection. Each electronic document will be checked for completeness, and optimized to ensure compatibility with all commonly used versions of the Adobe Acrobat reader. Until this project is completed, some electronic documents may not be available online. However, the majority of these files may still be obtained by contacting the WRDS Librarian at library@wrds.uwyo.edu or 307-766-6661.

Uinta County


Austin & Wall
Sunrise Engineering, Austin & Wall Canals Level I Study, Final Report, Nov, 2009 (178,375 kb)
Sunrise Engineering, Austin & Wall Canals Level I Study, Executive Summary, Nov, 2009 (323 kb)
Sunrise Engineering, Austin & Wall Canals and Reservoir Level II Study, Final Report, Sep, 2011 (36,964 kb)
Sunrise Engineering, Austin & Wall Canals and Reservoir Level II Study, Executive Summary, Sep, 2011 (1,184 kb)
Sunrise Engineering, Austin & Wall Canals and Reservoir Level II Study, Appendices, Sep, 2011 (170,446 kb)
Sunrise Engineering, Austin & Wall Canals Level II Phase II Study, Final Report, Aug, 2013 (22,638 kb)
Sunrise Engineering, Austin & Wall Canals Level II Phase II Study, Executive Summary, Aug, 2013 (481 kb)
HDR Engineering, Inc., Austin and Wall Canals Level II Study Wall Reservoir Rehabilitation, Final Report , Jun, 2015 (30,031 kb)
HDR Engineering, Inc., Austin and Wall Canals Level II Study Wall Reservoir Rehabilitation, Executive Summary , Jun, 2015 (1,676 kb)

Bear River
Forsgren and Associates, Bear River Basin Plan, Final Report, Jan, 2001 (3,234 kb)
Forsgren and Associates, Bear River Basin Plan, Executive Summary, Jan, 2001 (532 kb)
Forsgren and Associates, Bear River Basin Plan, Appendix, Book 2 of 2, Jan, 2001 ( kb)
Forsgren and Associates, Bear River Basin Plan, Appendix, Book 1 of 2, Jan, 2001 ( kb)
Wyoming Water Development Commission, 2011 Bear River Basin Plan Update Technical Update, Oct, 2011 ( kb)
Wyoming Water Development Commission, 2011 Bear River Basin Plan Update Technical Update, Jun, 2012 ( kb)
Wyoming State Geological Survey, Bear River Basin Water Plan Update Groundwater Study Level I (2010-2014) Available Groundwater Determination Technical Memorandum No. 6, Mar, 2014 ( kb)
Wyoming State Geological Survey, Bear River Basin Water Plan Update Groundwater Study Level I (2010-2014) Available Groundwater Determination Technical Memorandum No. 6, Plates, Apr, 2014 ( kb)
Wyoming State Geological Survey, Bear River Basin Water Plan Update Groundwater Study Level I (2010-2014) Available Groundwater Determination Technical Memorandum No. 6, Executive Summary, Apr, 2014 ( kb)
HDR Engineering, Inc., Bear River Watershed Study Level I, Final Report, Feb, 2017 (180,748 kb)
HDR Engineering, Inc., Bear River Watershed Study Level I, Executive Summary, Feb, 2017 (247 kb)
HDR Engineering, Inc., Bear River Watershed Study Level I, Appendices, Feb, 2017 (208,681 kb)
Western EcoSystems Technology, Inc., Bear River Basin Plan Update Environmental and Recreational Water Use Analysis for the Bear River Basin, Wyoming, Sep, 2017

Blacks Fork
Anderson Consulting Engineers, Inc., Blacks Fork River Watershed Study, Level I, Executive Summary, Jan, 2015 (487 kb)
Anderson Consulting Engineers, Inc., Blacks Fork River Watershed Study, Level I Basinwide, Final Report, Jan, 2015 (28,748 kb)
Anderson Consulting Engineers, Inc., Blacks Fork River Watershed Study Level I Phase III, Lower Blacks Fork, Final Report, Jan, 2015 (22,348 kb)
Anderson Consulting Engineers, Inc., Blacks Fork River Watershed Study Level I Phase II, Upper Blacks Fork, Final Report, Jan, 2015 (30,992 kb)
Anderson Consulting Engineers, Inc., Blacks Fork River Watershed Study Level I Phase I, Hams Fork, Final Report, Jan, 2015 (22,017 kb)

Bridger Valley
Forsgren Associates, Bridger Valley Water Supply Study Level I, Executive Summary, Nov, 1991 (1,887 kb)
Forsgren Associates, Bridger Valley Water Supply Study Level I, Nov, 1991 (11,733 kb)
Forsgren Associates, Bridger Valley Water Treatment Plant Analysis, Addition of Pioneer Water and Sewer District, Dec, 1993 (12,078 kb)
Forsgren Associates, Bridger Valley Water Supply Level II Study Executive Summary, Aug, 1995 (1,284 kb)
Forsgren Associates, Bridger Valley Water Supply Level II Study, Aug, 1995 (27,386 kb)
ECI, Bridger Valley Reservoir Level II Study Executive Summary, Jul, 2004 (5,167 kb)
ECI, Bridger Valley Reservoir Level II Study, Jul, 2004 (33,209 kb)
Gannett Fleming, Bridger Valley Reservoir Level II Phase II Study Final Report, Nov, 2006 (13,478 kb)
Gannett Fleming, Bridger Valley Reservoir Level II Phase II Study Executive Summary, Nov, 2006 (1,942 kb)
Short Elliott Hendrickson Inc., Bridger Valley Reservoir Project Level II Study, Final Report, Sep, 2008 (33,687 kb)
Short Elliott Hendrickson Inc., Bridger Valley Reservoir Project Level II Study, Executive Summary, Sep, 2008 (3,594 kb)

Evanston
Sunrise Engineering, Evanston Water System Master Plan Level II Study, Executive Summary, Nov, 1997 (4,025 kb)
Sunrise Engineering, Evanston Water System Master Plan Level II Study, Nov, 1997 (13,236 kb)
Sunrise Engineering, Evanston/Bear River Regional Pipeline Level II Study, Executive Summary, Jul, 2005 (232 kb)
Sunrise Engineering, Evanston/Bear River Regional Pipeline Level II Study, Jul, 2005 (38,200 kb)
Resource Consultants, Sediment Transport Studies of the Little Snake, Yampa, and Green River Systems, Aug, 1991 (8,782 kb)

Meeks Cabin
TriHydro Corporation, Meeks Cabin Dam Enlargement Level II Study, Phase I, Executive Summary, Jun, 2017 (4,830 kb)
TriHydro Corporation, Meeks Cabin Dam Enlargement Level II Study, Phase I Final Summary Report, Jun, 2017 (137,836 kb)

North Uinta
Forsgren Associates, North Uinta County Improvement and Service District Water Supply Master Plan Level I, Final Report, Sep, 2000 (17,153 kb)
TriHydro Corporation, North Uinta Water Supply Project Level II Feasibility Study, Bear River, Wyoming, Final Report, Mar, 2003 (20,163 kb)
TriHydro Corporation, North Uinta Water Supply Project Level II Feasibility Study, Bear River, Wyoming, Executive Summary, Mar, 2003 (1,871 kb)

Sulphur Creek
Woodward-Clyde Consultants, Level III Design Services, Interim Report, Sulphur Creek Reservoir Enlargement Near Evanston, Wyoming, Nov, 1984 (124,905 kb)
Woodward-Clyde Consultants, Executive Summary, Phase I of Level III Design Services Sulphur Creek Reservoir Enlargement Near Evanston, Wyoming, Dec, 1984 (2,003 kb)
Wyoming Water Development Commission, Sulphur Creek Level III, Mill Creek Division Alternative, A Preliminary Analysis, Apr, 1985 (1,828 kb)
Woodward-Clyde Consultants, Executive Summary, Level III Design Sulphur Creek Reservoir Enlargement Near Evanston, Wyoming, Dec, 1985 (8,549 kb)

Upper Bear
Forsgren-Perkins Engineering, PA, Water Source Investigation of the Upper Bear River Drainage Level I Study, Jan, 1983 (10,771 kb)
Forsgren-Perkins Engineering, PA, Upper Bear River Drainage Water Resource Investigation Level II Feasibility Study, Executive Summary Report, Jan, 1984 (6,150 kb)
Forsgren-Perkins Engineering, PA, Upper Bear River Drainage Water Resource Investigation Level II Feasibility Study , Mar, 1984 (75,558 kb)

Wyoming
Kaiser and Company, Wyoming Water Development Program Project Evaluations, Dec, 1982 (3,635 kb)
Boyle Engineering Corporation, State Water Planning Process Feasibility Report, Executive Summary, Oct, 1998 (1,027 kb)
Boyle Engineering Corporation, State Water Planning Process Feasibility Report, Oct, 1998 (11,576 kb)
States West Water Resources Corporation, Guidelines for Development of Basin Plans, State of Wyoming Water Basin Planning Process, Feb, 2001 (28,286 kb)
Weather Modification, Inc, Wyoming Level II Weather Modification Feasibility Study, Executive Summary, Mar, 2005 (1,219 kb)
Weather Modification, Inc, Wyoming Level II Weather Modification Feasibility Study, Mar, 2005 (6,849 kb)
WWC Engineering, Wyoming Framework Water Plan, Volume II, Planning Recommendations , Oct, 2007 ( kb)
WWC Engineering, Wyoming Framework Water Plan, Volume I , Oct, 2007 ( kb)
WWC Engineering, Wyoming Framework Water Plan, a Summary, Oct, 2007 ( kb)
Ruckelshaus Institute of Environment and Natural Resources, Impacts of Wyoming Water Development Commission Regional Water System Projects on Land Use: An Analysis of Two Case Studies, Oct, 2008 (14,522 kb)
Lowham Engineering LLC, Estimating Streamflow from Concurrent Discharge Measurements, May, 2009 (629 kb)
Harvey Economics, Environmental and Recreational Water Use Study, Final Report, Apr, 2012 (1,221 kb)
Harvey Economics, Environmental and Recreational Water Use Handbook, Apr, 2012 (597 kb)
Applied Weather Associates, LLC, Probable Maximum Precipitation Study for Wyoming, Appendix F : Storm Analysis Data, Dec, 2014 ( kb)
Applied Weather Associates, LLC, Probable Maximum Precipitation Study for Wyoming, Appendices A-E, G-N : Maps, Dec, 2014 ( kb)
Applied Weather Associates, LLC, Probable Maximum Precipitation Study for Wyoming, Dec, 2014 ( kb)
TriHydro Corporation, GIS Data Framework Plan, Jan, 2018 ( kb)
TriHydro Corporation, GIS Standards Technical Memorandum, Jan, 2018 ( kb)
Weather Modification, Inc, Airborne Cloud Seeding in Northern Colorado as an Extension of Seeding Operations Conducted for Southern Wyoming, Phase II Report, Feb, 2018 (5,920 kb)

Water Resources Data System Library | Water Resources Data System Homepage