Water Resources Data System Library
Wyoming Water Development Commission Projects and Studies

In June 2008, WRDS began a major review of all electronic documents in its WWDC "Project Report and Studies" collection. Each electronic document will be checked for completeness, and optimized to ensure compatibility with all commonly used versions of the Adobe Acrobat reader. Until this project is completed, some electronic documents may not be available online. However, the majority of these files may still be obtained by contacting the WRDS Librarian at library@wrds.uwyo.edu or 307-766-6661.

Campbell County


Belle Fourche
RESPEC, Belle Fourche River Watershed Study Basin Wide Watershed Management Plan, Final Report, V. 1, Mar, 2015 (84,500 kb)
RESPEC, Belle Fourche River Watershed Study Basin Wide Watershed Management Plan, Final Report, V. 2, Mar, 2015 (8,038 kb)
RESPEC, Belle Fourche River Watershed Study Basin Wide Watershed Management Plan, Executive Summary, Mar, 2015 (2,256 kb)
RESPEC, Belle Fourche River Watershed Study Redwater Subbasin Watershed Management Plan, Final Report, Mar, 2015 (28,059 kb)
RESPEC, Belle Fourche River Watershed Study Subbasin Above Keyhole Reservoir Watershed Management Plan, Final Report, Mar, 2015 (28,315 kb)
RESPEC, Belle Fourche River Watershed Study Subbasin Below Keyhole Reservoir Watershed Management Plan, Final Report, Mar, 2015 (31,798 kb)

Campbell County
Raymond P. Murphy, Campbell County Coal Bed Methane Monitor Well Program, Mar, 2000 (1,538 kb)

Cook Road
HKM Associates, Final Report for a Proposed Water Supply System for Cook Road Water District, Campbell County, Wyoming, Oct, 1992 (2,883 kb)
Soda Butte Services, Inc., Construction and Testing of CRWD-1 Well and Conceptual Design and Cost Estimation for Cook Road Water Supply Project Level II, Executive Summary, Jan, 1994 (1,249 kb)
Soda Butte Services, Inc., Construction and Testing of CRWD-1 Well and Conceptual Design and Cost Estimation for Cook Road Water Supply Project Level II, Final Report, Jan, 1994 (23,742 kb)

Crestview-Antelope Valley
Wester-Wetstein & Associates, Crestview/Antelope Valley Water Supply Project Level II, Final Report, Oct, 1999 (13,642 kb)
Wester-Wetstein & Associates, Crestview/Antelope Valley Water Supply Project Level II, Executive Summary, Nov, 1999 (909 kb)

Eight Mile High
Wester Wetstein & Associates, Eight Mile High Plains Well Project Level II, Dec, 2004 (11,262 kb)
Wester Wetstein & Associates, Report on the Eight Mile-High Plains Well Project Level II, Phase II, Feb, 2006 (72,167 kb)
Wester Wetstein & Associates, Executive Summary of the Report on the Eight Mile-High Plains Well Project Level II, Phase II, Feb, 2006 (1,595 kb)
HKM Associates, Phase I Interim Report for Gillette Area Master Plan, Gillette, Wyoming, May, 1993 (89,861 kb)
HKM Associates, Phase II Final Report for Gillette Area Master Plan, Gillette, Wyoming, Feb, 1994 (33,342 kb)
Wester Wetstein & Associates, Report for Gillette Wells Project Level II Feasibility Study-Rehabilitation, Nov, 1994 (19,450 kb)
Wyoming State Engineer's Office, Fort Union Formation Aquifer Monitoring Plan and Preliminary Aquifer Management Plan, Nov, 1995 (41,999 kb)
Stetson Engineering, Inc, City of Gillette Water System Evaluation, Executive Summary, Oct, 1999 (21,212 kb)
Stetson Engineering, Inc, City of Gillette Water System Evaluation, Report, Oct, 1999 (49,069 kb)
Wester Wetstein & Associates, Coal Bed Methane-Aquifer Storage and Retrieval Project Level II, Interim Report, Sep, 2003 (15,035 kb)
Wester Wetstein & Associates, Coal Bed Methane-Aquifer Storage and Retrieval Project Level II Southern Ft. Union Well Field Exploration Program and Development Study, Executive Summary, Dec, 2004 (2,886 kb)
Wester Wetstein & Associates, Coal Bed Methane-Aquifer Storage and Retrieval Project Level II Southern Ft. Union Well Field Exploration Program and Development Study, Final Report, Dec, 2004 (124,808 kb)
HDR Engineering, Inc., Gillette Regional Master Plan Level I Study, Final Report, Oct, 2009 (62,768 kb)
HDR Engineering, Inc., Gillette Regional Master Plan Level I Study, Executive Summary, Oct, 2009 (624 kb)
WLC Engineering, Surveying & Planning, Gillette Regional Connections 2 Level II Study, Peoples Improvement & Service District, Final Report, Oct, 2012 (60,620 kb)
WLC Engineering, Surveying & Planning, Gillette Regional Connections 2 Level II Study, Peoples Improvement & Service District, Executive Summary, Oct, 2012 (16,007 kb)
EnTech, Inc, Gillette Regional Connections 1 Level II Study, Bennor Estates Connection, Final Report, Feb, 2013 (20,093 kb)
EnTech, Inc, Gillette Regional Connections 1 Level II Study, Bennor Estates Connection, Executive Summary, Feb, 2013 (10,087 kb)
WLC Engineering, Surveying & Planning, Gillette Regional Connections 2 Level II Study, South Fork Estates Improvement and Service District, Final Report, Jul, 2013 (90,764 kb)
WLC Engineering, Surveying & Planning, Gillette Regional Connections 2 Level II Study, South Fork Estates Improvement and Service District, Executive Summary, Jul, 2013 (495 kb)
WLC Engineering, Surveying & Planning, Gillette Regional Connections 2 Level II Study, Freedom Hills Improvement and Service District, Final Report, Aug, 2013 (31,767 kb)
WLC Engineering, Surveying & Planning, Gillette Regional Connections 2 Level II Study, Freedom Hills Improvement and Service District, Executive Summary, Aug, 2013 (5,589 kb)
EnTech, Inc., Gillette Regional Connections 1 Level II Study, Antelope Valley Connections, Final Report, Sep, 2013 (61,580 kb)
EnTech, Inc, Gillette Regional Connections 1 Level II Study, Antelope Valley Connections, Executive Summary, Sep, 2013 (21,896 kb)
DOWL, Gillette Regional Connection Level II Study, Means First Extension Master Plan, Final Report, Aug, 2015 (163,924 kb)
DOWL, Gillette Regional Connection Level II Study, Means First Extension Master Plan, Executive Summary, Aug, 2015 (1,089 kb)
DOWL, Gillette Regional Connection Level II Study, Means First Extension Master Plan, Environmental Report, Aug, 2015 (28,023 kb)

Little Big Horn
Wyoming Water Development Commission, Report to the Governor, Little Big Horn Project, Sep, 1981 (2,570 kb)
Wyoming Water Development Commission, Agreement between the State of Wyoming Water Development Commission and the Sheridan-Little Horn Water Group Regarding the Development of the Little Big Horn River, Jan, 1982 (19,620 kb)

Northeast Wyoming River Basins
Wyoming Water Development Commission, Northeast Wyoming Level I Final Report, Sep, 1985 (8,756 kb)
HKM Engineering, Northeast Wyoming River Basins Plan, Executive Summary, Feb, 2002 (1,576 kb)
HKM Engineering, Northeast Wyoming River Basins Plan, Final Report, Feb, 2002 ( kb)
HKM Engineering, Northeast Wyoming River Basins Plan Technical Memoranda Volume I, A-J, Feb, 2002 ( kb)
HKM Engineering, Northeast Wyoming River Basins Plan Technical Memoranda Volume II, K-U, Feb, 2002 ( kb)

Pine Butte
Centennial Engineering & Research, Inc., Level I Reconnaissance Information, Pine Butte Improvement and Service District, Gillette, Wyoming, Dec, 1991 (11,736 kb)
HKM Engineering, Final Report for a Proposed Water Supply System for Pine Butte Improvement and Service District, Oct, 1992 (10,336 kb)
Wester Wetstein & Associates, Construction, Testing and Conceptual Completion Design of the Pine Butte No. 1 Well for the Pine Butte Water Supply Project Level II, Dec, 1993 (25,365 kb)
Wester Wetstein & Associates, Construction, Testing and Conceptual Completion Design of the Pine Butte No. 1 Well, Executive Summary for the Pine Butte Water Supply Project Level II, Jan, 1994 (3,352 kb)

Powder River
Harza, Powder River Level I Reconnaissance Study, Status Report to Wyoming Legislature, Nov, 1982 (4,217 kb)
Harza, Storage Developments for Water Supply, Powder River Basin in Wyoming, Level I Reconnaissance Study, Volume 1, Main Report, Sep, 1983 (22,381 kb)
Harza, Storage Developments for Water Supply, Powder River Basin in Wyoming, Level I Reconnaissance Study, Volume II, Appendices, Sep, 1983 (44,954 kb)

Powder-Tongue River Basin
HKM Engineering, Powder/Tongue River Basin Plan, Final Report, Feb, 2002 ( kb)
HKM Engineering, Powder/Tongue River Basin Plan, Technical Memoranda, Vol. I, A-I, Feb, 2002 ( kb)
HKM Engineering, Powder/Tongue River Basin Plan, Technical Memoranda, Vol. II, J-K, Feb, 2002 ( kb)
HKM Engineering, Powder/Tongue River Basin Plan, Technical Memoranda, Vol. III, L-U, Feb, 2002 ( kb)
HKM Engineering, Powder/Tongue River Basin Plan, Executive Summary, Feb, 2002 (988 kb)

Sleepy Hollow
Brown & Caldwell, Drilling, Construction, Development, and Testing of Sleepy Hollow Well No. 6, Feb, 2005 (53,421 kb)

Three Horses
EnTech, Inc, Final Report for Three Horses Watershed Plan Level I Study, Dec, 2002 (102,170 kb)
EnTech, Inc, Executive Summary for Three Horses Watershed Plan Level I Study, Dec, 2002 (3,132 kb)

Thunder Basin
Olsson Associates, Thunder Basin Watershed Management Plan Level I Watershed Study, Executive Summary, Nov, 2009 (81,148 kb)
Olsson Associates, Thunder Basin Watershed Management Plan Level I Watershed Study, Final Report, Volume I, Nov, 2009 (58,541 kb)
Olsson Associates, Thunder Basin Watershed Management Plan Level I Watershed Study, Final Report, Volume II, Nov, 2009 (221,486 kb)

Wright
Anderson & Kelly, Inc., Wright Groundwater Supply Project Level III, Drilling and Testing of RJ-4 Well, Operating Plan and Preconstruction Report, Executive Summary, Jan, 1986 (2,190 kb)
Anderson & Kelly, Inc., Wright Groundwater Supply Project Level III, Drilling and Testing of RJ-4 Well, Operating Plan and Preconstruction Report, Jan, 1986 (149,768 kb)
Anderson & Kelly, Inc., Summary of Wright Groundwater Supply Project, Level III, Nov, 1986 (1,646 kb)
Stetson Engineering, Inc, Wright Master Plan Level I Study, Executive Summary, Dec, 2009 (725 kb)
Stetson Engineering, Inc, Wright Master Plan Level I Study, Final Report, Dec, 2009 (72,884 kb)
HDR, Wright Water & Sewer District Water Supply Level II Study Well No. RJ-7, Final Report, Dec, 2012 (46,316 kb)
HDR, Wright Water & Sewer District Water Supply Level II Study Well No. RJ-7, Executive Summary, Dec, 2012 (377 kb)

Wyoming
Kaiser and Company, Wyoming Water Development Program Project Evaluations, Dec, 1982 (3,635 kb)
Boyle Engineering Corporation, State Water Planning Process Feasibility Report, Executive Summary, Oct, 1998 (1,027 kb)
Boyle Engineering Corporation, State Water Planning Process Feasibility Report, Oct, 1998 (11,576 kb)
States West Water Resources Corporation, Guidelines for Development of Basin Plans, State of Wyoming Water Basin Planning Process, Feb, 2001
WWC Engineering, Wyoming Framework Water Plan, a Summary, Oct, 2007 ( kb)
WWC Engineering, Wyoming Framework Water Plan, Volume I , Oct, 2007 ( kb)
WWC Engineering, Wyoming Framework Water Plan, Volume II, Planning Recommendations , Oct, 2007 ( kb)
Weather Modification, Inc, Wyoming Level II Weather Modification Feasibility Study, Executive Summary, Mar, 2005 (1,219 kb)
Weather Modification, Inc, Wyoming Level II Weather Modification Feasibility Study, Mar, 2005 (6,849 kb)
Ruckelshaus Institute of Environment and Natural Resources, Impacts of Wyoming Water Development Commission Regional Water System Projects on Land Use: An Analysis of Two Case Studies, Oct, 2008 (14,522 kb)
Lowham Engineering LLC, Estimating Streamflow from Concurrent Discharge Measurements, May, 2009 (629 kb)
Harvey Economics, Environmental and Recreational Water Use Study, Final Report, Apr, 2012 (1,221 kb)
Harvey Economics, Environmental and Recreational Water Use Handbook, Apr, 2012 (597 kb)
Applied Weather Associates, LLC, Probable Maximum Precipitation Study for Wyoming, Dec, 2014 ( kb)
Applied Weather Associates, LLC, Probable Maximum Precipitation Study for Wyoming, Appendices A-E, G-N : Maps, Dec, 2014 ( kb)
Applied Weather Associates, LLC, Probable Maximum Precipitation Study for Wyoming, Appendix F : Storm Analysis Data, Dec, 2014 ( kb)

Water Resources Data System Library | Water Resources Data System Homepage