Water Resources Data System Library
Wyoming Water Development Commission Projects and Studies
In June 2008, WRDS began a major review of all electronic documents in its WWDC "Project Report and Studies" collection. Each electronic document will be checked for completeness, and optimized to ensure compatibility with all commonly used versions of the Adobe Acrobat reader. Until this project is completed, some electronic documents may not be available online. However, the majority of these files may still be obtained by contacting the WRDS Librarian at library@wrds.uwyo.edu or 307-766-6661.
Big Horn County
- Airport Bench
- Engineering Associates, Airport Bench Water Supply Project Phase II, Executive Summary, Nov, 1990 (548 kb)
- Engineering Associates, Airport Bench Water Supply Project Phase II Report, Nov, 1990 (2,252 kb)
- Basin-Big Horn
- Crank Companies, Inc., Final Report for Basin/Big Horn Rehabilitation Project Level II, Nov, 1990 (30,304 kb)
- Crank Companies, Inc., Executive Summary for Basin/Big Horn Rehabilitation Project Level II, Nov, 1990 (581 kb)
- Bench Canal
- Nelson Engineering, Bench Canal Rehabilitation Project Level II, Nov, 1991 (55,018 kb)
- Sage Civil Engineering, Bench Canal Company Master Plan Level I Study, Final Report, Jan, 2016 (16,016 kb)
- HDR Engineering, Inc., Guidebook for Water Resources Management & Development, Big Horn & Clarks Fork Basins, Final Report , Oct, 1988 (21,813 kb)
- Engineering Associates, Big Horn Basin Rural Water Supply, Phase 1 Report, Jan, 1989 (76,916 kb)
- Engineering Associates, Big Horn Basin Rural Water Supply Phase II, Final Report, Dec, 1990 (44,675 kb)
- Engineering Associates, Big Horn Basin Rural Water Supply Phase II, Executive Summary, Dec, 1990 (2,252 kb)
- Engineering Associates, Big Horn Basin Rural Water Supply Project Phase II Final Report, Appendix J, Expanded Systems Analysis, May, 1992 (94,662 kb)
- A & H Consulting, Inc., Irrigation Hydropower Study Level II, Executive Summary, May, 2003 (725 kb)
- A & H Consulting, Inc., Irrigation Hydropower Study Level II, May, 2003 (12,940 kb)
- MWH Americas, Inc., Wind-Bighorn Basin Plan Update, Technical Memoranda, May, 2010 ( kb)
- MWH Americas, Inc., Wind-Bighorn Basin Plan Update, Report, May, 2010 ( kb)
- MWH Americas, Inc., Wind-Bighorn Basin Plan Update, Executive Summary, May, 2010 (4,987 kb)
- Weston Groundwater Engineering, Big Horn Regional Ground Water Level II Study, Final Report, Volume II, May, 2011 (9,969 kb)
- Weston Groundwater Engineering, Big Horn Regional Ground Water Level II Study, Final Report, Volume I, May, 2011 (59,400 kb)
- Weston Groundwater Engineering, Big Horn Regional Ground Water Level II Study, Executive Summary, May, 2011 (415 kb)
- Wyoming State Geological Survey, Wind/Bighorn River Basin Water Plan Update Groundwater Study Level I (2008-2011), Available Groundwater Determination Technical Memorandum, May, 2012 ( kb)
- Big Horn Canal
- Nelson Engineering, Big Horn Canal Feasibility Analysis Level II, Phase II, Final Report, Jun, 1994 (30,556 kb)
- Nelson Engineering, Big Horn Canal Feasibility Analysis Level II, Executive Summary, Jun, 1994 (692 kb)
- Anderson Consulting Engineers, Inc., Final Report for Big Horn Canal Rehabilitation Level II Study, Apr, 2007 (613 kb)
- Anderson Consulting Engineers, Inc., Executive Summary for Big Horn Canal Rehabilitation Level II Study, Apr, 2007 (22,249 kb)
- Nelson Engineering, Basin-Big Horn Canal Rehabilitation Project Level II, Final Report, Dec, 2013 (95,328 kb)
- Nelson Engineering, Basin-Big Horn Canal Rehabilitation Project Level II, Executive Summary, Dec, 2013 (20,235 kb)
- Burlington
- MSE-HKM, Burlington Water Supply Project Level II, Technical Report, Dec, 1996 (18,157 kb)
- MSE-HKM, Burlington Water Supply Project Level II, Executive Summary, Dec, 1996 (1,656 kb)
- TST, Inc., Burlington Regional Water Master Plan Level II Study, Executive Summary, Jan, 2007 (13,906 kb)
- TST, Inc., Burlington Regional Water Master Plan Level II Study, Jan, 2007 (36,880 kb)
- Byron
- Western Water Consultants, Town of Byron Ground Water Development Feasibility Study, Sep, 1982 (62,913 kb)
- Western Water Consultants, Exploratory Ground Water Investigation of the Shoshone River Alluvium Near Byron, Wyoming, Apr, 1983 (6,947 kb)
- Engineering Associates, Town of Byron Raw Water Supply Project Level II Study, Final Report, Nov, 2002 (13,890 kb)
- Engineering Associates, Town of Byron Raw Water Supply Project Level II Study, Executive Summary, Nov, 2002 (69 kb)
- TREC, Town of Byron Level I Master Plan Study, Final Report, Sep, 2016 (18,065 kb)
- TREC, Town of Byron Level I Master Plan Study, Executive Summary, Sep, 2016 (3,386 kb)
- Cowley
- Western Water Consultants, Town of Cowley Ground Water Development Feasibility Study, Sep, 1982 (57,018 kb)
- Western Water Consultants, Final Report on Drilling and Testing Madison #1 Well for the Town of Cowley, Big Horn County, Wyoming, Oct, 1983 (24,981 kb)
- Morrison-Maierle, Inc., Town of Cowley Water Master Plan Study, Final Report, Sep, 2016 (21,807 kb)
- Morrison-Maierle, Inc., Town of Cowley Water Master Plan Study, Executive Summary, Sep, 2016 (2,621 kb)
- Deaver
- Engineering Associates, Deaver Irrigation Rehabilitation Project Level II Study, Final Report, Nov, 2002 (50,595 kb)
- Engineering Associates, Deaver Irrigation Rehabilitation Project Level II Study, Executive Summary, Nov, 2002 (844 kb)
- TREC, Inc., Town of Deaver Water Master Plan Level I Study, Environmental Report to Accompany, Sep, 2015 (7,734 kb)
- TREC, Inc., Town of Deaver Level I Master Plan Study, Aug, 2015 (13,641 kb)
- Sage Civil Engineering, Deaver Irrigation District Master Plan Update, Level I Study, Final Report, Oct, 2016 (129,877 kb)
- Sage Civil Engineering, Deaver Irrigation District Master Plan Update, Level I Study, Executive Summary, Oct, 2016 (2,846 kb)
- Frannie
- Western Water Consultants, Potential Water-Well Sites for the Towns of Frannie and Deaver, Wyoming, Feb, 1985 (2,438 kb)
- Western Water Consultants, Final Report, Drilling and Testing of Frannie-Deaver Test Well #1, Sep, 1986 (22,969 kb)
- Falcon Consulting Services L.L.C., Frannie Well Rehabilitation Level II Study (Kirk #1) Frannie, Wyoming, Final Report, Oct, 2005 (31,559 kb)
- Aqua Engineering, Inc., Frannie Raw Water Level II Study, Final Report, Oct, 2008 (8,733 kb)
- Globe Canal
- James Gores and Associates, P.C., Globe Canal Investigations Level II Rehabilitation Plan, Dec, 1989 (7,988 kb)
- James Gores and Associates, P.C., Globe Canal Investigations Level II, Final Report, Aug, 1990 (52,202 kb)
- James Gores and Associates, P.C., Globe Canal Investigations Level II, Executive Summary, Aug, 1990 (9,727 kb)
- Greybull
- John W. Donnell & Associates, Feasibility Study on Supplementary Groundwater Supply for Town of Greybull, Wyoming, Jun, 1982 (23,673 kb)
- Big Horn Engineering, Final Report on Groundwater Exploration Program for Town of Greybull, Wyoming, Sep, 1983 (20,195 kb)
- Nelson Engineering, Greybull Water Supply Project Level II, Final Design Report, Nov, 1995 (54,195 kb)
- Nelson Engineering, Greybull Water Supply Project Level II, Executive Summary, Nov, 1995 (549 kb)
- Nelson Engineering, Greybull Water Supply Project Level II, Phase II and III, Exploration Well and Conceptual Design, Final Report, Sep, 1997 (16,379 kb)
- Nelson Engineering, Greybull Water Supply Project Level II, Phase II and III, Exploration Well and Conceptual Design, Executive Summary, Sep, 1997 (818 kb)
- Engineering Associates, Town of Greybull Water Supply Project Level II, Final Report, Apr, 1998 (12,709 kb)
- Engineering Associates, Town of Greybull Water Supply Project Level II, Executive Summary, Apr, 1998 (578 kb)
- ECI, Final Greybull Hydropower Study Level II Project, Apr, 2003 (30,968 kb)
- ECI, Executive Summary Greybull Hydropower Study Level II Project, Apr, 2003 (3,300 kb)
- Engineering Associates, Level II Study, Town of Greybull Raw Water Supply Project, Final Report, May, 2003 (46,878 kb)
- Engineering Associates, Level II Study, Town of Greybull Raw Water Supply Project, Executive Summary, May, 2003 (583 kb)
- Engineering Associates, Level II Study, Town of Greybull Raw Water Supply Project, Environmental Report, Jun, 2003 (1,791 kb)
- Wyoming Groundwater, LLC, Greybull Wells Rehabilitation Level II Study, Well Evaluation, Rehabilitation, and Testing, Greybull Water Transmission Pipeline Evaluation Well Sitting Study, Volume II of II, Nov, 2006 (28,531 kb)
- Wyoming Groundwater, LLC, Greybull Wells Rehabilitation Level II Study, Well Evaluation, Rehabilitation, and Testing, Greybull Water Transmission Pipeline Evaluation Well Sitting Study, Volume I of II, Nov, 2006 (61,179 kb)
- Wyoming Groundwater, LLC, Greybull Wells Rehabilitation Level II Study, Well Evaluation, Rehabilitation, and Testing, Greybull Water Transmission Pipeline Evaluation Well Sitting Study, Executive Summary, Nov, 2006 (12,091 kb)
- Sage Civil Engineering, Greybull Valley Rehabilitation and GIS Level II Study, Final Report, Dec, 2010 (35,387 kb)
- Sage Civil Engineering, Greybull Valley Rehabilitation and GIS Level II Study, Executive Summary, Dec, 2010 (442 kb)
- AECOM, Greybull Valley Irrigation District Hydropower Level II Study, Final Report, Jan, 2014 (28,790 kb)
- AECOM, Greybull Valley Irrigation District Hydropower Level II Study, Executive Summary, Jan, 2014 (726 kb)
- AECOM, Greybull Valley Irrigation District Storage Enlargement Level II, Phase I Study, Final Report, Mar, 2017 (36,813 kb)
- AECOM, Greybull Valley Irrigation District Storage Enlargement Level II, Phase I Study, Executive Summary, Mar, 2017 (1,605 kb)
- Forsgren Associates, Greybull Tank and Master Plan Level I, Final Report, Sep, 2015 (13,712 kb)
- Forsgren Associates, Greybull Tank and Master Plan Level I, Executive Summary, Sep, 2015 (1,938 kb)
- Highline Canal
- Sage Civil Engineering, Final Report for the Highline Canal Level II, Nov, 2002 (19,511 kb)
- Sage Civil Engineering, Executive Summary of Final Report for the Highline Canal Level II, Nov, 2002 (117 kb)
- Hot Springs
- BRS Inc, Hot Springs Rural-Worland Pipeline Interim Report, Regional Water Supply Project Level II, Sep, 2002 (12,656 kb)
- Forsgren Associates, Hot Springs Rural-Worland Pipeline Regional Water Supply Project Level II Study, Final Report, Nov, 2004 (43,828 kb)
- Forsgren Associates, Hot Springs Rural-Worland Pipeline Regional Water Supply Project Level II Study, Executive Summary, Nov, 2004 (12,778 kb)
- Hunt Canal
- Nelson Engineering, Hunt Canal Rehabilitation Project Level II, Final Design Report, Dec, 1989 (48,936 kb)
- Nelson Engineering, Hunt Canal Rehabilitation Project Level II, Executive Summary, Dec, 1989 (647 kb)
- Hyattville
- Lidstone & Associates, Inc, Town of Hyattville Water Supply Project Level I Master Plan Report, Dec, 2002 (13,209 kb)
- Wester Wetstein & Associates, Hyattville Water Supply Level II Project, Executive Summary, Oct, 2006 (2,079 kb)
- Wester Wetstein & Associates, Hyattville Water Supply Level II Project, Final Report, Nov, 2006 (40,453 kb)
- Keystone
- Sage Civil Engineering, Keystone and Farmers Canal Master Plan Level I, Final Report, Dec, 2011 (24,519 kb)
- Sage Civil Engineering, Keystone and Farmers Canal Master Plan Level I, Executive Summary, Dec, 2011 (471 kb)
- Anderson Consulting Engineers, Inc., Final Report for Kirby Area Water Supply Level I Study, Sep, 2005 (21,617 kb)
- Anderson Consulting Engineers, Inc., Executive Summary for Kirby Area Water Supply Level I Study, Sep, 2005 (1,547 kb)
- Lake Adelaide-Shell Valley
- ESA Geotechnical Consultants, Shell Valley Watershed Level III, Phase 1, Interim Report on Conceptual Design, Lake Adelaide Enlargement, Executive Summary (see Shell), Jan, 1986 (1,118 kb)
- ESA Geotechnical Consultants, Shell Valley Watershed Level III, Phase 1, Interim Report on Conceptual Design, Lake Adelaide Enlargement (see Shell), Jan, 1986 (20,912 kb)
- ESA Geotechnical Consultants, Shell Valley Watershed Level III, Phase II, Lake Adelaide Enlargement, Executive Summary (see Shell), Dec, 1986 (1,719 kb)
- Lovell
- A & H Consulting, Inc., Lovell Irrigation District Hydropower Study Level II, Executive Summary, May, 2003 (651 kb)
- A & H Consulting, Inc., Lovell Irrigation District Hydropower Study Level II, May, 2003 (11,329 kb)
- DOWL HKM, Lovell Water Master Plan Level I Study, Environmental Report to Accompany, Oct, 2013 (14,117 kb)
- DOWL HKM, Lovell Level I Water Master Plan, Final Report, Oct, 2013 (20,421 kb)
- DOWL HKM, Lovell Level I Water Master Plan, Executive Summary, Oct, 2013 (1,351 kb)
- Sage Civil Engineering, Lovell Irrigation District Master Plan Level I Study, Final Report, Aug, 2017 (15,165 kb)
- Sage Civil Engineering, Lovell Irrigation District Master Plan Level I Study, Executive Summary, Aug, 2017 (3,695 kb)
- Manderson
- Buell Winter Mousel and Associates, Feasibility Study for Water Well Supply, Town of Manderson, May, 1982 (8,375 kb)
- Buell Winter Mousel and Associates, Exploratory Drilling Program Report for Manderson, Wyoming, Feb, 1983 (6,124 kb)
- Western Water Consultants, Groundwater Feasibility for the Town of Manderson, May, 1983 (45,823 kb)
- Western Water Consultants, Final Report on Drilling and Testing Town of Manderson Well #3, Feb, 1984 (8,829 kb)
- Graham, Dietz & Associates, Manderson Level II Water Supply Study, Final Report, Nov, 1994 (83,835 kb)
- Graham, Dietz & Associates, Manderson Level II Water Supply Study, Executive Summary, Nov, 1994 (3,346 kb)
- Graham, Dietz & Associates, Manderson Level II Water Supply Study, Appendix, Nov, 1994 (39,187 kb)
- Woodard & Curran, Manderson Water Master Plan Level I Study, Final Report, Sep, 2017 (22,498 kb)
- Woodard & Curran, Manderson Water Master Plan Level I Study, Executive Summay, Sep, 2017 (3,634 kb)
- Northwest
- DOWL, Northwest Rural Water District Master Plan Level I Study, Final Report, Aug, 2017 (63,349 kb)
- DOWL, Northwest Rural Water District Master Plan Level I Study, Executive Summary, Aug, 2017 (7,443 kb)
- Nowood
- Sage Civil Engineering, Lower Nowood Rural Water Supply Level I, Executive Summary, Oct, 2012 (2,088 kb)
- Sage Civil Engineering, Lower Nowood Rural Water Supply Level II, Final Report, Sep, 2014 (151,483 kb)
- Sage Civil Engineering, Lower Nowood Rural Water Supply Level II, Executive Summary, Sep, 2014 (12,719 kb)
- Sage Civil Engineering, Lower Nowood Rural Water Supply Level II Study, Environmental Study, Oct, 2014 (20,244 kb)
- Sage Civil Engineering, Lower Nowood Rural Water Supply Level I, Final Report, Oct, 2012 (22,037 kb)
- Nowood River
- Anderson Consulting Engineers, Inc., Nowood River Storage/Watershed Study Level I, Final Report, Mar, 2010 (172,117 kb)
- Anderson Consulting Engineers, Inc., Nowood River Storage/Watershed Study Level I, Executive Summary, Mar, 2010 (1,218 kb)
- TriHydro Corporation, Nowood River Storage Level II Study Phase I, Executive Summary, Dec, 2013 (12,147 kb)
- TriHydro Corporation, Nowood River Storage Level II Study Phase I Summary Report Volume II, Appendices, Dec, 2013 (150,418 kb)
- Trihydro Corporation, Nowood River Storage Level II Study Phase I Summary Report Volume I, Report, Tables, Figures, Sheets, Dec, 2013 (112,558 kb)
- TriHydro Corporation, Nowood River Storage Level II Study Phase II Summary Report, Executive Summary, Jan, 2016 (1,854 kb)
- TriHydro Corporation, Nowood River Storage Level II Study Phase II Summary Report Volume II, Appendices, Jan, 2016 (80,560 kb)
- TriHydro Corporation, Nowood River Storage Level II Study Phase II Summary Report Volume I, Report, Tables, Figures, Sheets, Jan, 2016 (95,809 kb)
- Powder-Tongue River Basin
- HKM Engineering, Powder/Tongue River Basin Plan, Technical Memoranda, Vol. III, L-U, Feb, 2002 ( kb)
- HKM Engineering, Powder/Tongue River Basin Plan, Technical Memoranda, Vol. II, J-K, Feb, 2002 ( kb)
- HKM Engineering, Powder/Tongue River Basin Plan, Technical Memoranda, Vol. I, A-I, Feb, 2002 ( kb)
- HKM Engineering, Powder/Tongue River Basin Plan, Final Report, Feb, 2002 ( kb)
- HKM Engineering, Powder/Tongue River Basin Plan, Executive Summary, Feb, 2002 (988 kb)
- Shell Canal
- Deere & Ault Consultants, Inc., Shell Canal Tunnel Level II Feasibility Study, Final Report, Oct, 2011 (79,670 kb)
- Deere & Ault Consultants, Inc., Shell Canal Tunnel Level II Feasibility Study, Executive Summary, Oct, 2011 (7,175 kb)
- Shell Valley
- Crank Companies, Inc., Executive Summary, Shell Valley Domestic Water Supply Project, Level III, Jan, 1980 (750 kb)
- HKM Engineering, Shell Valley Watershed Level II Study, Final Report, Jan, 1985 (24,038 kb)
- HKM Engineering, Shell Valley Watershed Level II Study, Executive Summary, Jan, 1985 (380 kb)
- ESA Geotechnical Consultants, Shell Valley Watershed, Level III, Phase 1, Interim Report on Conceptual Design, Lake Adelaide Enlargement (see Lake Adelaide), Jan, 1986 (20,912 kb)
- ESA Geotechnical Consultants, Shell Valley Watershed, Level III, Executive Summary, Phase 1, Interim Report on Conceptual Design, Lake Adelaide Enlargement (see Lake Adelaide), Jan, 1986 (1,118 kb)
- Morrison-Mairle, Inc, Final Report, Shell Valley Deep Well Project with Results of Aquifer Tests for Shell Valley Watershed Supply Project, Feb, 1986 (13,691 kb)
- ESA Geotechnical Consultants, Executive Summary, Phase II: Lake Adelaide Enlargement, Shell Valley Watershed Level III (see Lake Adelaide), Dec, 1986 (1,719 kb)
- Engineering Associates, Shell Valley Watershed Plan Level I Study, Final Report, Mar, 2010 (16,370 kb)
- Engineering Associates, Shell Valley Watershed Plan Level I Study, Executive Summary, Mar, 2010 (3,115 kb)
- Engineering Associates, Shell Valley Watershed Plan Level I Study, Appendices, Mar, 2010 (193,906 kb)
- States West Water Resources Corporation, Shell Valley Storage Level II Study, Executive Summary, Feb, 2013 (1,293 kb)
- States West Water Resources Corporation, Shell Valley Storage Level II Study, Appendices, Feb, 2013 (50,570 kb)
- States West Water Resources Corporation, Project Report for the Shell Valley Storage Level II Study, Final Report, Feb, 2013 (37,130 kb)
- Wenck Associates, Inc., Shell Valley Storagel Level II, Phase II Study, Appendices, Jun, 2015 (580,557 kb)
- Wenck Associates, Inc., Shell Valley Storage Level II, Phase II Study, Final Report, Jun, 2015 (16,941 kb)
- Wenck Associates, Inc., Shell Valley Storage Level II, Phase II Study, Executive Summary, Jun, 2015 (1,900 kb)
- Shoshone
- Engineering Associates, Feasibility Study, Shoshone Municipal Pipeline Project, Jan, 1983 (36,921 kb)
- James M. Montgomery, Consulting Engineers, Shoshone/Lakeview Water Development Project, Project Status Report, Sep, 1985 (5,536 kb)
- Banner Associates, Inc, Shoshone Municipal Water Supply Project Level III Interim Report, Executive Summary, Dec, 1986 (5,010 kb)
- Banner Associates, Inc, Shoshone Municipal Water Supply Pipelines, Level III Interim Report, Dec, 1986 (51,315 kb)
- Sage Civil Engineering, Shoshone Irrigation District Rehabilitation and GIS Level II Study, Final Report, Nov, 2008 (6,846 kb)
- Sage Civil Engineering, Shoshone Irrigation District Rehabilitation and GIS Level II Study, Executive Summary, Nov, 2008 (525 kb)
- Sidon Canal
- Inberg-Miller Engineers, Interim Report for Marchant Wash Crossing, Sidon Canal Rehabilitation Project Level II, Oct, 1993 (7,244 kb)
- Inberg-Miller Engineers, Sidon Canal Rehabilitation Project Level II Project Report, Executive Summary, Sep, 1994 (327 kb)
- Inberg-Miller Engineers, Sidon Canal Rehabilitation Project Level II Project Report, Sep, 1994 (5,314 kb)
- South Big Horn County
- DOWL, South Big Horn County Rural Water District Expansion Level II Study, Final Report, Nov, 2015 (20,381 kb)
- DOWL, South Big Horn County Rural Water District Expansion Level II Study, Executive Summary, Nov, 2015 (1,417 kb)
- DOWL, South Big Horn County Rural Water District Expansion Level II Study, Environmental Report, Nov, 2015 (26,125 kb)
- Nelson Engineering, Northern Washakie County Flood Control Study Level I, Nov, 1998 (78,331 kb)
- Westside
- Bureau of Reclamation, Special Study on the Westside Irrigation Project (Wyoming), Sep, 1983 (16,523 kb)
- Nelson Engineering, Westside Project, Plan Formulation Working Document, Final Report, Jun, 1985 (13,007 kb)
- Bureau of Reclamation, Westside Irrigation Project Engineering Appendix to the Planning Report/Draft Environmental Statement , Oct, 1986
- Bureau of Reclamation, Planning Report/Draft Environmental Statement on Westside Irrigation Project, Jan, 1988 (8,493 kb)
- Aqua Engineering, Inc., Willwood Irrigation District Master Plan Level I Study, Final Report, May, 2006 (35,719 kb)
- Aqua Engineering, Inc., Willwood Irrigation District Master Plan Level I Study, Executive Summary, May, 2006 (586 kb)
- Engineering Associates, Willwood Rehabilitation and GIS Level II Study, Geotechnical Silt Sediment Consultation, Apr, 2009 (2,676 kb)
- Sage Civil Engineering, Willwood Irrigation District Master Plan Update Level I Study, Final Report, Dec, 2015 (64,888 kb)
- Sage Civil Engineering, Willwood Irrigation District Master Plan Update Level I Study, Executive Summary, Dec, 2015 (2,538 kb)
- BRS, Inc, Wind/Bighorn River Basin Plan, Technical Memoranda, Chapters I and II, Basin Water Use Profile, Oct, 2003 ( kb)
- BRS, Inc, Wind/Bighorn River Basin Plan, Technical Memoranda, Chapter IV and V, Future Water Use, Addendum-Irrigation Diversion, Operation, and Description , Oct, 2003 ( kb)
- BRS, Inc, Wind/Bighorn River Basin Plan, Technical Memoranda, Chapter III, Surface and Ground Water Availability, Oct, 2003 ( kb)
- BRS, Inc, Wind/Bighorn River Basin Plan, Final Report, Oct, 2003 ( kb)
- BRS, Inc, Wind/Bighorn River Basin Plan, Executive Summary, Oct, 2003 (669 kb)
- MWH Americas, Inc., Wind-Bighorn Basin Plan Update, Technical Memoranda, May, 2010 ( kb)
- MWH Americas, Inc., Wind-Bighorn Basin Plan Update, Report, May, 2010 ( kb)
- MWH Americas, Inc., Wind-Bighorn Basin Plan Update, Executive Summary, May, 2010 (4,487 kb)
- Wyoming State Geological Survey, Wind/Bighorn River Basin Water Plan Update Groundwater Study Level I (2008-2011), Available Groundwater Determination Technical Memorandum, May, 2012 ( kb)
- Western EcoSystems Technology, Inc., Wind/Bighorn River Basin Plan Update Environmental and Recreational Water Use Analysis for the Wind/Bighorn River Basin Plan Update, Sep, 2017 ( kb)
- Sunrise Engineering, Wind River Zone Level II Study, Final Report, Jul, 2018 (95,754 kb)
- Sunrise Engineering, Wind River Zone Level II Study, Executive Summary, Jul, 2018 (892 kb)
- Worland
- Forsgren Associates, Worland Pipeline Project Level II Feasibility Study, Executive Summary, Dec, 1997 (844 kb)
- Forsgren Associates, Worland Pipeline Project Level II Feasibility Study, Dec, 1997 (9,349 kb)
- Anderson Consulting Engineers, Inc., Worland Area Irrigated Lands Geographic Information System (GIS) Level II Feasibility Study, Final Report, Mar, 2007 (903 kb)
- Anderson Consulting Engineers, Inc., Worland Area Irrigated Lands Geographic Information System (GIS) Level II Feasibility Study, Executive Summary, Mar, 2007 (26,858 kb)
- James Gores and Associates, P.C., South Worland Level I Master Plant Study, Executive Summary, Oct, 2017 (1,476 kb)
- James Gores and Associates, P.C., South Worland Level I Master Plan Study, Final Report, Oct, 2017 (5,589 kb)
- Wyoming
- Kaiser and Company, Wyoming Water Development Program Project Evaluations, Dec, 1982 (3,635 kb)
- Boyle Engineering Corporation, State Water Planning Process Feasibility Report, Executive Summary, Oct, 1998 (1,027 kb)
- Boyle Engineering Corporation, State Water Planning Process Feasibility Report, Oct, 1998 (11,576 kb)
- States West Water Resources Corporation, Guidelines for Development of Basin Plans, State of Wyoming Water Basin Planning Process, Feb, 2001 (28,286 kb)
- Weather Modification, Inc, Wyoming Level II Weather Modification Feasibility Study, Executive Summary, Mar, 2005 (1,219 kb)
- Weather Modification, Inc, Wyoming Level II Weather Modification Feasibility Study, Mar, 2005 (6,849 kb)
- WWC Engineering, Wyoming Framework Water Plan, Volume II, Planning Recommendations , Oct, 2007 ( kb)
- WWC Engineering, Wyoming Framework Water Plan, Volume I , Oct, 2007 ( kb)
- WWC Engineering, Wyoming Framework Water Plan, a Summary, Oct, 2007 ( kb)
- Ruckelshaus Institute of Environment and Natural Resources, Impacts of Wyoming Water Development Commission Regional Water System Projects on Land Use: An Analysis of Two Case Studies, Oct, 2008 (14,522 kb)
- Lowham Engineering LLC, Estimating Streamflow from Concurrent Discharge Measurements, May, 2009 (629 kb)
- Harvey Economics, Environmental and Recreational Water Use Study, Final Report, Apr, 2012 (1,221 kb)
- Harvey Economics, Environmental and Recreational Water Use Handbook, Apr, 2012 (597 kb)
- Applied Weather Associates, LLC, Probable Maximum Precipitation Study for Wyoming, Appendix F : Storm Analysis Data, Dec, 2014 ( kb)
- Applied Weather Associates, LLC, Probable Maximum Precipitation Study for Wyoming, Appendices A-E, G-N : Maps, Dec, 2014 ( kb)
- Applied Weather Associates, LLC, Probable Maximum Precipitation Study for Wyoming, Dec, 2014 ( kb)
- National Center for Atmospheric Research, Weather Modification Bighorn Mountains Siting and Design Study, Executive Summary, Mar, 2017 (3,585 kb)
- National Center for Atmospheric Research, Weather Modification Bighorn Mountains Siting and Design Study, Final Report, Mar, 2017 (119,074 kb)
- TriHydro Corporation, GIS Data Framework Plan, Jan, 2018 ( kb)
- TriHydro Corporation, GIS Standards Technical Memorandum, Jan, 2018 ( kb)
- Weather Modification, Inc, Airborne Cloud Seeding in Northern Colorado as an Extension of Seeding Operations Conducted for Southern Wyoming, Phase II Report, Feb, 2018 (5,920 kb)
Water Resources Data System Library |
Water Resources Data System Homepage